JBL DUET II (serv.man3) EMC - CB Certificate ▷ View online
- Page 33 of 65 -
Report
No.
114383
IEC 60950-1:2005 / EN 60950-1:2006
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IECEN60950_1C
7
CONNECTION TO CABLE DISTRIBUTION SYSTEMS
⎯
7.1
General
Not connected to Cable
Distribution System.
Distribution System.
N
7.2
Protection of cable distribution system service
persons, and users of other equipment connected to
the system, from hazardous voltages in the
equipment
persons, and users of other equipment connected to
the system, from hazardous voltages in the
equipment
N
7.3
Protection of equipment users from overvoltages on
the cable distribution system
the cable distribution system
N
7.4
Insulation between primary circuits and cable
distribution systems
distribution systems
N
7.4.1 General
N
7.4.2
Voltage surge test
N
7.4.3 Impulse
test
N
Measuring instrument
Inv. no.
Date
A
ANNEX A, TESTS FOR RESISTANCE TO HEAT AND FIRE
⎯
A.1
Flammability test for fire enclosures of movable
equipment having a total mass exceeding 18 kg, and
of stationary equipment (see 4.7.3.2)
equipment having a total mass exceeding 18 kg, and
of stationary equipment (see 4.7.3.2)
Not used.
N
A.1.1 Samples ................................................................:
⎯
Wall
thickness (mm)..............................................:
⎯
A.1.2
Conditioning of samples; temperature (
°C) ..........:
N
A.1.3 Mounting
of
samples ............................................:
N
A.1.4
Test flame (see IEC 60695-11-3)
N
Flame A, B, C or D ...............................................:
⎯
A.1.5 Test
procedure
N
A.1.6 Compliance
criteria
N
Sample 1 burning time (s).....................................:
⎯
Sample 2 burning time (s).....................................:
⎯
Sample 3 burning time (s).....................................:
⎯
- Page 34 of 65 -
Report
No.
114383
IEC 60950-1:2005 / EN 60950-1:2006
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IECEN60950_1C
A.2
Flammability test for fire enclosures of movable equipment having a total mass not
exceeding 18 kg, and for material and components located inside fire enclosures
(see 4.7.3.2 and 4.7.3.4)
exceeding 18 kg, and for material and components located inside fire enclosures
(see 4.7.3.2 and 4.7.3.4)
N
A.2.1 Samples,
material .................................................:
⎯
Wall
thickness (mm)..............................................:
⎯
A.2.2
Conditioning of samples; temperature (°C) ..........:
N
A.2.3 Mounting
of
samples ............................................:
N
A.2.4
Test flame (see IEC 60695-11-4)
N
Flame A, B or C ....................................................:
⎯
A.2.5 Test
procedure
N
A.2.6 Compliance
criteria
N
Sample 1 burning time (s).....................................:
⎯
Sample 2 burning time (s).....................................:
⎯
Sample 3 burning time (s).....................................:
⎯
A.2.7
Alternative test acc. to IEC 60695-11-5, cl. 5 and 9
N
Sample 1 burning time (s).....................................:
⎯
Sample 2 burning time (s).....................................:
⎯
Sample 3 burning time (s).....................................:
⎯
A.3
Hot flaming oil test (see 4.6.2)
N
A.3.1
Mounting of samples
N
A.3.2
Test procedure
N
A.3.3 Compliance
criterion
N
B
ANNEX B, MOTOR TESTS UNDER ABNORMAL CONDITIONS (see 4.7.2.2 and
5.3.2)
5.3.2)
⎯
B.1 General
requirements
N
Position
.................................................................:
⎯
Manufacturer ........................................................:
⎯
Type
.....................................................................:
⎯
Rated
values .......................................................:
⎯
B.2 Test
conditions
N
B.3 Maximum
temperatures
N
- Page 35 of 65 -
Report
No.
114383
IEC 60950-1:2005 / EN 60950-1:2006
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IECEN60950_1C
B.4
Running overload test
N
B.5
Locked-rotor overload test
N
Test
duration
(days) .............................................:
⎯
Electric strength test: test voltage (V) ..................:
⎯
B.6
Running overload test for d.c. motors in secondary
circuits
circuits
N
B.6.1 General
N
B.6.2 Test
procedure
N
B.6.3
Alternative test procedure
N
B.6.4
Electric strength test; test voltage (V) ..................:
N
B.7
Locked-rotor overload test for d.c. motors in
secondary circuits
secondary circuits
N
B.7.1 General
N
B.7.2
Test procedure
N
B.7.3
Alternative test procedure
N
B.7.4
Electric strength test; test voltage (V) ................. :
N
B.8
Test for motors with capacitors
N
B.9
Test for three-phase motors
N
B.10
Test for series motors
N
Operating
voltage (V) ...........................................:
⎯
C
ANNEX C, TRANSFORMERS (see 1.5.4 and 5.3.3)
N
Position
.................................................................:
⎯
Manufacturer ........................................................:
⎯
Type
.....................................................................:
⎯
Rated
values .......................................................:
⎯
Method of protection............................................. :
⎯
C.1 Overload
test
N
C.2 Insulation
N
Protection from displacement of windings ............:
N
D
ANNEX D, MEASURING INSTRUMENTS FOR TOUCH-CURRENT TESTS
(see 5.1.4)
(see 5.1.4)
⎯
- Page 36 of 65 -
Report
No.
114383
IEC 60950-1:2005 / EN 60950-1:2006
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IECEN60950_1C
D.1 Measuring
instrument
N
D.2
Alternative measuring instrument
N
E
ANNEX E, TEMPERATURE RISE OF A WINDING (see 1.4.13)
N
F
ANNEX F, MEASUREMENT OF CLEARANCES AND CREEPAGE DISTANCES
(see 2.10 and Annex G)
(see 2.10 and Annex G)
N
G
ANNEX G, ALTERNATIVE METHOD FOR DETERMINING MINIMUM
CLEARANCES
CLEARANCES
N
G.1 Clearances
N
G.1.1 General
N
G.1.2
Summary of the procedure for determining minimum
clearances
clearances
N
G.2
Determination of mains transient voltage (V)
N
G.2.1 AC
mains
supply ...................................................:
N
G.2.2
Earthed d.c. mains supplies .................................:
N
G.2.3
Unearthed d.c. mains supplies .............................:
N
G.2.4 Battery
operation ..................................................:
N
G.3
Determination of telecommunication network
transient voltage (V) .............................................:
transient voltage (V) .............................................:
N
G.4
Determination of required withstand voltage (V)
N
G.4.1
Mains transients and internal repetitive peaks .....:
N
G.4.2
Transients from telecommunication networks ......:
N
G.4.3
Combination of transients
N
G.4.4
Transients from cable distribution systems
N
G.5
Measurement of transient voltages (V)
N
a) Transients from a mains supply
N
For an a.c. mains supply
N
For a d.c. mains supply
N
b) Transients from a telecommunication network
N
G.6
Determination of minimum clearances .................:
N
H
ANNEX H, IONIZING RADIATION (see 4.3.13)
N
Click on the first or last page to see other DUET II (serv.man3) service manuals if exist.