DOWNLOAD Harman Kardon GLA 55 (serv.man2) Service Manual ↓ Size: 1.44 MB | Pages: 39 in PDF or view online for FREE

Model
GLA 55 (serv.man2)
Pages
39
Size
1.44 MB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
gla-55-sm2.pdf
Date

Harman Kardon GLA 55 (serv.man2) EMC - CB Certificate ▷ View online

Ident. Nr.: 
115972 
Date:  
2008-10-26 
 
115972 EMC TRF_verified 
page 29 of 39 
12 Conducted 
Immunity 
12.1 Standard 
Basic standard 
EN 61000-4-6:1996/A1:2001 
Date of testing 
2008-09-27 
Performance criteria: 
12.2 Measurement equipment 
 
Equipment 
Last Calibration
Type 
 
Serial No
.  
Manufacturer 
  CW sine Generator  
January 25, 
2008 
CWS500 SB2605
 
EMTEST 
  CDN January 
25, 
2008 
CDN-M2 SB2605/01
 
EMTEST 
 
12.3 Test set-up 
See annex B  
The EUT are placed on a table that is 0.8 meter height, and a Ground reference plane on the table, 
EUT are placed upon table and use a 10cm insulation between the EUT and Ground reference plane. 
For Input DC and AC Power Ports: The EUT is connected to the power mains through a coupling and 
decoupling networks for power supply lines. And directly couples the disturbances signal into EUT. 
 
12.4 Test results 
Mode 
Table 
Remarks 
Result 
TM1 011 1. Field Strength :3V(unmodulated,r.m.s) 
2. Test Signal: AM 80% Modulated with 1kHz 
3. Scanning Frequency :0.15MHz – 80MHz 
4. Source impedance 150Ω 
Pass   
 
12.5 Table 
12.5.1 Table 011 
 
Frequency Range 
(MHz) 
Injecteded Position
Strength 
Result 
0.15MHz ~ 80MHz 
AC Lines 
3V(r.m.s, Unmodulated)
Pass 
Dwell time:1s; Steps: 1% 
 
 
 
 
 
 
 
 
 
 
Ident. Nr.: 
115972 
Date:  
2008-10-26 
 
115972 EMC TRF_verified 
page 30 of 39 
13  Voltage dips and interruptions Immunity 
13.1 Standard 
Basic standard 
EN 61000-4-11:2004 
Date of testing 
2008-09-27 
13.2 Measurement equipment 
 
Equipment 
Last Calibration
Type 
 
Serial No
.  
Manufacturer 
  Immunity simulator 
February 25, 
2008 
UCS5500M4 
SB3070 
EMTEST 
  Three Phase Coupling 
Network 
February 25, 
2008 
CNI5036 SB3070/01 
EMTEST 
 
13.3 Test set-up 
See annex B 
The EUT and its load are placed on a table which is 0.8 meter above a metal ground plane measured 
1m*1m min. And projected beyond the EUT by at least 0.1m on all sides. The power cord shall be used 
the shortest power cord as specified by the manufacturer. 
The EUT is tested for each selected combination of test level and duration with a sequence of three 
dips/interruptions with intervals of 10s minimum. 
13.4 Test results 
Mode 
Table 
Remarks 
Result 
TM1 012 >95% reduction 0.5 period :performance criterion B 
30% reduction 25 period  :performance criterion C 
>95% reduction 250 period  :performance criterion C 
Pass   
 
13.5 Table 
13.5.1 Table 012 
 
Environmental 
phenomenon 
 
Voltage Dips & Short 
Interruptions 
% U
T
 
Duration 
(ms)  
Phase Angle 
Result 
<5 10 
0
° 
Pass 
Voltage dips 
70 500 
0
° 
Pass 
Voltage 
interruptions 
<5 5000 
0
° 
Pass 
 
 
 
Ident. Nr.: 
115972 
Date:  
2008-10-26 
 
115972 EMC TRF_verified 
page 31 of 39 
Annex A 
EUT / technical data 
Port 
Label 
Description 
Enclosure GH 
Plastic 
 
Mains input AC 
NAC.E 
AC 100-240V, 50-60Hz, 2A MAX 
Mains input DC 
NDC.E 
N.A 
Mains output AC 
NAC.E 
N.A 
Mains output DC 
NAC.A 
DC18V, 3.33A 
Process measurement and control ports 
PMS.E/A 
N.A 
I/O and communication ports 
SD.E/A 
N.A 
Protective earth connection 
EA 
N.A 
Interface Cables 
Length 
Shielded 
Type 
Special 
 
 
 Round 
 
 
 
 
Figure A-1 
The photo of  the whole EUT 
Ident. Nr.: 
115972 
Date:  
2008-10-26 
 
115972 EMC TRF_verified 
page 32 of 39 
 
 
Figure A-2 
The internal photo 
 
 
Figure A-3 
The internal photo 
Page of 39
Display