Harman Kardon GLA 55 (serv.man2) EMC - CB Certificate ▷ View online
Ident. Nr.:
115972
Date:
2008-10-26
115972 EMC TRF_verified
page 29 of 39
12 Conducted
Immunity
12.1 Standard
Basic standard
EN 61000-4-6:1996/A1:2001
Date of testing
2008-09-27
Performance criteria:
A
12.2 Measurement equipment
Equipment
Last Calibration
Type
Serial No
.
Manufacturer
CW sine Generator
January 25,
2008
2008
CWS500 SB2605
EMTEST
CDN January
25,
2008
CDN-M2 SB2605/01
EMTEST
12.3 Test set-up
See annex B
The EUT are placed on a table that is 0.8 meter height, and a Ground reference plane on the table,
EUT are placed upon table and use a 10cm insulation between the EUT and Ground reference plane.
For Input DC and AC Power Ports: The EUT is connected to the power mains through a coupling and
decoupling networks for power supply lines. And directly couples the disturbances signal into EUT.
The EUT are placed on a table that is 0.8 meter height, and a Ground reference plane on the table,
EUT are placed upon table and use a 10cm insulation between the EUT and Ground reference plane.
For Input DC and AC Power Ports: The EUT is connected to the power mains through a coupling and
decoupling networks for power supply lines. And directly couples the disturbances signal into EUT.
12.4 Test results
Mode
Table
Remarks
Result
TM1 011 1. Field Strength :3V(unmodulated,r.m.s)
2. Test Signal: AM 80% Modulated with 1kHz
3. Scanning Frequency :0.15MHz – 80MHz
4. Source impedance 150Ω
3. Scanning Frequency :0.15MHz – 80MHz
4. Source impedance 150Ω
Pass
12.5 Table
12.5.1 Table 011
Frequency Range
(MHz)
Injecteded Position
Strength
Result
0.15MHz ~ 80MHz
AC Lines
3V(r.m.s, Unmodulated)
Pass
Dwell time:1s; Steps: 1%
Ident. Nr.:
115972
Date:
2008-10-26
115972 EMC TRF_verified
page 30 of 39
13 Voltage dips and interruptions Immunity
13.1 Standard
Basic standard
EN 61000-4-11:2004
Date of testing
2008-09-27
13.2 Measurement equipment
Equipment
Last Calibration
Type
Serial No
.
Manufacturer
Immunity simulator
February 25,
2008
2008
UCS5500M4
SB3070
EMTEST
Three Phase Coupling
Network
February 25,
2008
2008
CNI5036 SB3070/01
EMTEST
13.3 Test set-up
See annex B
The EUT and its load are placed on a table which is 0.8 meter above a metal ground plane measured
1m*1m min. And projected beyond the EUT by at least 0.1m on all sides. The power cord shall be used
the shortest power cord as specified by the manufacturer.
1m*1m min. And projected beyond the EUT by at least 0.1m on all sides. The power cord shall be used
the shortest power cord as specified by the manufacturer.
The EUT is tested for each selected combination of test level and duration with a sequence of three
dips/interruptions with intervals of 10s minimum.
dips/interruptions with intervals of 10s minimum.
13.4 Test results
Mode
Table
Remarks
Result
TM1 012 >95% reduction 0.5 period :performance criterion B
30% reduction 25 period :performance criterion C
>95% reduction 250 period :performance criterion C
Pass
13.5 Table
13.5.1 Table 012
Environmental
phenomenon
phenomenon
Voltage Dips & Short
Interruptions
Interruptions
% U
T
Duration
(ms)
Phase Angle
Result
<5 10
0
°
Pass
Voltage dips
70 500
0
°
Pass
Voltage
interruptions
interruptions
<5 5000
0
°
Pass
Ident. Nr.:
115972
Date:
2008-10-26
115972 EMC TRF_verified
page 31 of 39
Annex A
EUT / technical data
Port
Label
Description
Enclosure GH
Plastic
Mains input AC
NAC.E
AC 100-240V, 50-60Hz, 2A MAX
Mains input DC
NDC.E
N.A
Mains output AC
NAC.E
N.A
Mains output DC
NAC.A
DC18V, 3.33A
Process measurement and control ports
PMS.E/A
N.A
I/O and communication ports
SD.E/A
N.A
Protective earth connection
EA
N.A
Interface Cables
Length
Shielded
Type
Special
Round
Figure A-1
The photo of the whole EUT
Ident. Nr.:
115972
Date:
2008-10-26
115972 EMC TRF_verified
page 32 of 39
Figure A-2
The internal photo
Figure A-3
The internal photo
Click on the first or last page to see other GLA 55 (serv.man2) service manuals if exist.