DOWNLOAD Sony SLV-D985PAZ / SLV-D985PEA / SLV-D985PME Service Manual ↓ Size: 12.08 MB | Pages: 127 in PDF or view online for FREE

Model
SLV-D985PAZ SLV-D985PEA SLV-D985PME
Pages
127
Size
12.08 MB
Type
PDF
Document
Service Manual
Brand
Device
VCR
File
slv-d985paz-slv-d985pea-slv-d985pme.pdf
Date

Sony SLV-D985PAZ / SLV-D985PEA / SLV-D985PME Service Manual ▷ View online

2-9
2
CONNECTOR WAFER
1
CABLE FLAT
2-4-5 Gear Worm Wheel Removal
1) Remove the Gear Worm wheel 1.
Fig. 2-16 Gear Worm Wheel Removal
2-4-6 Cable Flat  Removal
1) Remove the Drum connecting part of Cable Flat 1  from
Connector Waffer 2.
Fig. 2-17 Cable Flat Removal
1
GEAR WORM WHEEL
2-10
1
SCREW
2
BRAKET GEAR
4
GEAR JOINT 1
3
GEAR JOINT 2
2
MOTOR LOADING ASS`Y
1
SCREW
2-4-7 Motor Loading Ass’y Removal
1) Remove the screw 1.
2) Remove the Motor Loading Ass’y 2.
Fig.2-18 Motor Loading Ass’y Removal
2-4-8 Bracket Gear, Gear Joint 2, 1 Removal
1) Remove the SCREW 1.
2) Remove the Bracket Gear 2.
3) Remove the Gear Joint 2 3.
4) Remove the Gear Joint 1 4.
Assembly:
1) Be sure to align dot mark of Gear Joint 1 1 with dot mark of
Gear Joint 2 2 as shown Fig 2-20.
(Refer to Timing point1)
2) Confirm the Timing Point 2 of the Gear Joint 2 2 and Slider
Cam 3.
Fig. 2-19 Bracket Gear, Gear Joint 1,2 Removal
Fig. 2-20 Gear Joint 1,2 Assembly
1
GEAR JOINT1
2
GEAR JOINT2
3
SLIDER CAM
TIMING POINT 1
TIMING POINT 2
2-11
2-4-9 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Removal
1) Remove the Belt Pulley. (Refer to Fig. 2-38)
2) Remove the Gear Loading Drive 1 after releasing Hook [A] in
the direction arrow as shown in detail drawing.
3) Remove the Slider Cam 2.
4) Remove the Lever Load S Ass’y 3 & Lever Load T Ass’y 4.
Fig. 2-21 Gear Loading Drive, Slider Cam,
Lever T, S Load Ass’y Removal
2-4-10 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Assembly
1) When reinstalling, be sure to align dot of Lever Load T Ass’y
1  with dot of Lever Load S Ass’y 2 as shown in drawing,
(Refer to Timing Point 1).
2) Insert the Pin A,B,C,D into the Slider Cam 3 hole,
3) Be sure to align dot of Lever Load T 1 and dot of Gear Loading
Drive 4, (Refer to Timing Point 2).
4) Aline dot of Gear Loading drive 4 with mark of Slider Cam 3
as shown in drawing (Refer to Timing Point 3).
Fig. 2-22 Gear Loading Drive, Slider Cam,
Lever Load S, T Ass’y Assembly
1
GEAR LOADING DRIVE
3
LEVER LOAD S ASS'Y
4
LEVER LOAD T ASS'Y
2
SLIDE CAM
HOOK (A)
2
LEVER LOAD S 
1
LEVER LOAD T 
PIN A
PIN C
PIN B
PIN D
3
SLIDER CAM
TIMING POINT 2
TIMING POINT 1
TIMING POINT 3
2-12
1
SPRING TENTION LEVER
2
LEVER TENTION ASS`Y
3
BAND BRAKE ASS`Y
STOPPER
MARK[B]
"A"
2-4-11 Lever Pinch Drive,
Lever Tension Drive Removal
1) Remove the Lever Pinch Drive 1, Lever Tension Drive 2.
Fig. 2-23 Lever Pinch Drive,
Lever Tension Drive Removal
2-4-12 Lever Tension Ass’y,
Band Brake Ass’y Removal
1) Remove the Lever Brake S Ass’y (Refer to Fig 2-25).
2) Remove the Spring Tension Lever 1.
3) Rotate stopper of Main Base in the direction of arrow “A”.
4) Lift the Lever Tension Ass’y 2 & Band brake Ass’y 3.
Note:
1) When replacing the Lever Tension Ass’y 2, be sure to apply
Grease on the post,
2) Take care not to touch stain on the felt side, and not to be folder
and broken Band brake Ass’y
3) After Lever Tension Ass’y seated, Rotate stopper of Main Base
to the Mark[B].
Fig. 2-24 Lever Tension Ass’y,
Band Brake Ass’y Removal
1
LEVER PINCH DRIVE 
2
LEVER TENSION DRIVE 
Page of 127
Display

Click on the first or last page to see other SLV-D985PAZ / SLV-D985PEA / SLV-D985PME service manuals if exist.