DOWNLOAD Sony KV-BZ213M50 (serv.man2) Service Manual ↓ Size: 18.41 MB | Pages: 127 in PDF or view online for FREE

Model
KV-BZ213M50 (serv.man2)
Pages
127
Size
18.41 MB
Type
PDF
Document
Service Manual
Brand
Device
TV
File
kv-bz213m50-sm2.pdf
Date

Sony KV-BZ213M50 (serv.man2) Service Manual ▷ View online

– 12 –
KV-BZ213M50/M70/N50
   RM-GA002
2-11.  Lead Assy, G2 and Lead Assy, Focus dressing
2-12.  Conn Assy, 7P , Lead Assy, Earth & Rotational Coil Conn dressing
 
 
 
 
 
Purse Lock Ø5
 
 
 
 
 
 
Purse Lock
Ø
5
  
90
 
 
 
Purse Lock
Ø
5
Purse Lock Ø5
HV Cable
Lead Assy, G2
Lead Assy
,
G2
Lead Assy
Focus
Earth Assy
,
Keep Lead Assy,
G2
away from HV
cable (at least
1mm/kv)
Keep Lead Assy, G2
away from Heat sink
Rotational Coil
Non-rotational Coil
Keep Lead Assy,
Earth away from heat sinks
Lead Assy, Earth
Conn Assy, 7P
Purse Lock Ø5
UL Wire (1-923-000-81)
Conn Assy, 7P
Rotational Coil
Purse Lock Ø5
Lead Assy, Earth
Keep Lead Assy,
Earth away from heat sinks
UL Wire (1-923-000-81)
Connector Assy, 7P
Lead Assy,
UL Wire
Rotation coil
DY
Wire from
Rotation coil
Rotational Coil
Connector Assy,
Lead Assy
UL Wire
UL Tape
Conn. Assy, 5P (200V)
Purse Lock Ø5
Lead Assy,G2
Earth Assy, coating
Lead Assy, Focus
Lead Assy, Focus & Lead Assy, G2 is pulled straight up
from FBT to Earth Assy, Coating & dressed together with
purse lock Ø5
Use this as a
reference to
dress ECA, Lead
Assy, Focus & G2
TVSR (Clause 9.4.7) :
- Keep HV cables away from
  conductive parts 1mm/KV or more
– 13 –
KV-BZ213M50/M70/N50
   RM-GA002
2-13.  HV Lead Assy Dressing
2-14.  AC Power Cord Dressing
A
45
o
B
A
A
A
C
 
 
 
 
 
SAFETY OPERATION
HV Holder
180 ± 5
Purse Lock
HV Holder Combi
Dress HV Holder
Combi with
Purse Lock Ø9
Fix the bigger
diameter hook of
HV Holder Combi
on the right side of
black tape & at
horizontal bending
of DGC, then use
purse lock Ø9 to
secure HV Holder
Combi to DGC
HV Holder Combi
Dress AC Power Cord at PWB Bracket hook as shown
Dress AC Cord Holder at the terminal bracket
PWB Bracket hook
Terminal bracket
AC Cord
AC Power Cord
Purse Lock
DGC
DGC Conn
Black tape
Place purse lock Ø9 after the exit of DGC
Conn from DGC
TVSR (Clause 9.4.7):
A) Spacing between HV cable and conductive part's
 
surface --> 1mm/kV or more
B) Spacing between edge of anode cap and conductive
 
parts --> 0.5mm/kV or more
C) Spacing between HV cable & enclosure with
 
ventilation (i.e. Rear Cover side) --> 10mm or more
CAUTION:
Keep HV cable facing inwards DY to keep HV cable
away from ventilation side of rear cover --> 10mm or
more.
Ensure TVSR 1mm/kV is kept from HV cable to DY &
other conductive parts
– 14 –
KV-BZ213M50/M70/N50
   RM-GA002
2-15.  Connector dressing on C PWB
No need to dress 
Lead Assy, H Static 
at CRT socket's hook.
CRT socket's hook
Make sure wire is not in direct 
contact with heat sink of IC751
Connector Assy, 7P
Dress Connector Assy, 7P 
with pin, wire A705
Dress Connector Assy, 7P 
with cable tie at alignment hole 
A
– 15 –
KV-BZ213M50/M70/N50
   RM-GA002
The following adjustments should be made when a complete
realignment is required or a new picture tube is installed.
The controls and switch should be set as follows unless
otherwise noted:
Picture control ......................................................... NORMAL
Brightness control ................................................... NORMAL
Perform the adjustments in order as follows:
1. Beam Landing
2. Convergence
3. Focus
4. G2 (SCREEN)
5. White Balance
Note: Test Equipment Required
1. Pattern Generator
2. Degausser
3. DC Power Supply
4. Digital Multimeter
SECTION 3
SET-UP ADJUSTMENTS
Preparation :
• Feed in the white pattern signal.
• Before starting, degauss the entire screen with the
degausser.
• In order to reduce the geomagnetism on the set's
picture tube, face it east or west.
3-1. BEAM LANDING ADJUSTMENT
1. Input a raster signal with the pattern generator.
2. Loosen the deflection yoke mounting screw, and set the
purity control to the center as shown below.
3. Set the raster signal of the pattern generator to green.
4. Move the deflection yoke (DY) backward and adjust the
purity control so that green is in the center and blue and
red are at the sides evenly.
5. Then move the DY forward and adjust so that the entire
screen becomes green.
6. Now switch over raster signal to red then blue and
confirm the condition.
...................................................................................................................................................................................................................... ...........
5. Oscilloscope
6. Landing Checker
7. XCV Adjuster
Purity control
Red
Blue
Green
7. When the position of the DY is determined, tighten it
with the DY mounting screw.
8. If the beam does not land correctly in all corners of the
screen, use magnet disc to correct it.
3-2. CONVERGENCE ADJUSTMENT
Preparation :
• Before starting, perform FOCUS adjustment.
• Picture mode STANDARD.
• Receive dot/cross hatch pattern.
a) Vertical Static Convergence
a
b
b
c
c
d
d
a
Purity control
corrects this area.
Disc magnets or rotatable
disc magnets correct these
areas (a-d).
Deflection yoke positioning
corrects these areas.
4 pole magnet
RV750
H. STAT
RV1800
G2 (SCREEN) 
Center dot
R     G     B
G
R
B
Page of 127
Display

Click on the first or last page to see other KV-BZ213M50 (serv.man2) service manuals if exist.