DOWNLOAD Sony DCR-IP5 / DCR-IP5E / DCR-IP7BT / DCR-IP7E (serv.man3) Service Manual ↓ Size: 1.05 MB | Pages: 63 in PDF or view online for FREE

Model
DCR-IP5 DCR-IP5E DCR-IP7BT DCR-IP7E (serv.man3)
Pages
63
Size
1.05 MB
Type
PDF
Document
Service Manual
Brand
Device
Movie / SUPPLEMENT-1 LEVEL 2
File
dcr-ip5-dcr-ip5e-dcr-ip7bt-dcr-ip7e-sm3.pdf
Date

Sony DCR-IP5 / DCR-IP5E / DCR-IP7BT / DCR-IP7E (serv.man3) Service Manual ▷ View online

SERVICE MANUAL
SUPPLEMENT-1
File this supplement-1 with the Service Manual.
(PV01-056)
DCR-IP5/IP5E/IP7BT/IP7E
RMT-817/818
US Model
Canadian Model
DCR-IP5/IP7BT
AEP Model
UK Model
DCR-IP5E/IP7E
E Model
Hong Kong Model
DCR-IP5/IP5E/IP7E
Tourist Model
DCR-IP5/IP5E
Australian Model
DCR-IP7E
Korea Model
DCR-IP5
Level 2
Subject:
“SECTION 5. ADJUSTMENTS” is published.
2001. 12
— 2 —
DCR-IP5/IP5E/IP7BT/IP7E
TABLE OF CONTENTS
1.
Adjusting items when replacing main parts and boards. ·· 5-2
5-1.
CAMERA SECTION ADJUSTMENT ··························· 5-4
1-1.
PREPARATIONS BEFORE ADJUSTMENT
(CAMERA SECTION) ··················································· 5-4
1-1-1. List of Service Tools ························································ 5-4
1-1-2. Preparations ····································································· 5-5
1-1-3. Precaution ········································································ 5-7
1.
Setting the Switch ···························································· 5-7
2.
Order of Adjustments ······················································ 5-7
3.
Subjects ··········································································· 5-7
1-2.
INITIALIZATION OF B, C, D, E, F, 4, 7, 8, 9 PAGE
DATA ··············································································· 5-8
1-2-1. INITIALIZATION OF D, E, F, 7 PAGE DATA ·············· 5-8
1.
Initializing the D, E, F, 7 Page Data ································ 5-8
2.
Modification of D, E, F, 7 Page Data ······························ 5-8
3.
D Page Table ···································································· 5-8
4.
F Page Table ···································································· 5-9
5.
E Page Table ·································································· 5-10
6.
7 Page Table ··································································· 5-10
1-2-2. INITIALIZATION OF C, 4, 8, 9 PAGE DATA ············· 5-11
1.
Initializing the C, 4, 8, 9 Page Data ······························· 5-11
2.
Modification of C, 4, 8, 9 Page Data ····························· 5-11
3.
C Page Table ·································································· 5-11
4.
4 Page Table ··································································· 5-13
5.
8 Page Table ··································································· 5-13
6.
9 Page Table ··································································· 5-13
1-2-3. INITIALIZATION OF B PAGE DATA
(DCR-IP7BT/IP7E) ······················································· 5-14
1.
Initializing the B Page Data ··········································· 5-14
2.
Modification of B Page Data ········································· 5-14
3.
Writing the Network Default Setting Value ·················· 5-14
4.
B Page Table ·································································· 5-14
1-3.
CAMERA SYSTEM ADJUSTMENTS ························ 5-15
1.
48MHz Origin Oscillation Adjustment (VC-263 board) ·· 5-15
2.
HALL Adjustment ························································· 5-15
3.
MR Adjustment ····························································· 5-16
4.
Flange Back Adjustment (Using Minipattern Box) ······· 5-17
5.
Flange Back Adjustment (Using Flange Back Adjustment
Chart and Subject More Than 500m Away) ·················· 5-18
5-1.
Flange Back Adjustment (1) ·········································· 5-18
5-2.
Flange Back Adjustment (2) ·········································· 5-18
6.
Flange Back Check ························································ 5-19
7.
Optical Axis Adjustment ··············································· 5-20
8.
MAX GAIN Adjustment ··············································· 5-21
9.
F No. & ND Light Quantity Standard Data Input ········· 5-21
10.
Mechanical Shutter Adjustment (DCR-IP7BT/IP7E) ··· 5-22
11.
LV Standard Data Input ················································· 5-22
12.
Picture Frame Setting ···················································· 5-23
13.
Color Reproduction Adjustment ···································· 5-24
14.
Auto White Balance Standard Data Input ····················· 5-25
15.
Auto White Balance Adjustment ··································· 5-26
16.
White Balance Check ···················································· 5-27
1-4.
COLOR ELECTRONIC VIEWFINDER SYSTEM
ADJUSTMENT ····························································· 5-28
1.
Bright Adjustment (VF-149 Board) ······························ 5-29
1-1.
Automatic Adjustment ··················································· 5-29
1-2.
Manual Adjustment ······················································· 5-29
2.
Contrast Adjustment (VF-149 Board) ··························· 5-30
2-1.
Automatic Adjustment ··················································· 5-30
2-2.
Manual Adjustment ······················································· 5-30
3.
White Balance Adjustment (VF-149 Board) ················· 5-31
4.
VCO Check (VF-149 Board) ········································ 5-31
1-5.
LCD SYSTEM ADJUSTMENT ··································· 5-33
1.
VCO Adjustment (PD-142 Board) ································ 5-33
2.
Bright Adjustment (PD-142 Board) ······························ 5-34
3.
Black Limit Adjustment (PD-142 Board) ····················· 5-34
4.
PSIG GRAY Adjustment (PD-142 Board) ···················· 5-35
5.
Contrast Adjustment (PD-142 Board) ··························· 5-35
6.
Center Level Adjustment (PD-142 Board) ···················· 5-36
7.
V-COM Adjustment (PD-142 Board) ···························· 5-36
8.
White Balance Adjustment (PD-142 Board) ················· 5-37
5-2.
MECHANISM SECTION ADJUSTMENT ·················· 5-38
2-1.
Adjustment Remote Commander ·································· 5-38
2-2.
OPERATING WITHOUT CASSETTE ························ 5-38
2-3.
TAPE PATH ADJUSTMENT ········································ 5-38
1.
Preparation for Adjustment ··········································· 5-38
2.
Processing after Completing Operations: ······················ 5-38
5-3.
VIDEO SECTION ADJUSTMENT ······························ 5-39
3-1.
PREPARATIONS BEFORE ADJUSTMENTS ············ 5-39
3-1-1. Equipment to Required ·················································· 5-39
3-1-2. Precautions on Adjusting ··············································· 5-40
3-1-3. Adjusting Connectors ···················································· 5-41
3-1-4. Connecting the Equipment ············································ 5-41
3-1-5. Alignment Tapes ···························································· 5-42
3-1-6. Input/Output Level and Impedance ······························· 5-42
3-2.
SYSTEM CONTROL SYSTEM ADJUSTMENT ········ 5-43
1.
Initialization of B, C, D, E, F, 4, 7, 8, 9 Page Data ······· 5-43
2.
Serial No. Input ····························································· 5-43
3-3.
SERVO AND RF SYSTEM ADJUSTMENT ··············· 5-45
1.
Cap FG Duty Adjustment (VC-263 Board) ··················· 5-45
2.
Treel FG Duty Adjustment (VC-263 Board) ················· 5-45
3.
Read Clock f
0
 Adjustment (VC-263 Board) ·················· 5-46
4.
Switching Position Adjustment (VC-263 Board) ·········· 5-46
5.
XREC ACT Adjustment (VC-263 Board) ····················· 5-47
6.
Timing ATF Center Value Adjustment (VC-263 Board) ·· 5-47
7.
AGC Adjustment and AEQ & LMS Adjustment ··········· 5-48
7-1.
Preparations Before Adjustments ·································· 5-48
7-2.
AGC Adjustment (VC-263 Board) ································ 5-48
7-3.
Pch AEQ & LMS Adjustment (VC-263 Board) ············ 5-48
7-4.
Mch AEQ & LMS Adjustment (VC-263 Board) ··········· 5-49
8.
Error Rate Check (VC-263 Board) ································ 5-49
3-4.
VIDEO SYSTEM ADJUSTMENTS ····························· 5-50
1.
Chroma BPF f
0
 Adjustment (VC-263 Board) ················ 5-50
2.
S VIDEO OUT Y Level Adjustment (VC-263 Board) ·· 5-50
3.
S VIDEO OUT Chroma Level Adjustment
(VC-263 Board) ····························································· 5-51
4.
VIDEO OUT Y, Chroma Level Check (VC-263 Board) ·· 5-51
3-5.
AUDIO SYSTEM ADJUSTMENTS ···························· 5-52
1.
Overall Level Characteristics Check ····························· 5-53
2.
Overall Distortion Check ··············································· 5-53
3.
Overall Noise Level Check ············································ 5-53
5-4.
SERVICE MODE ·························································· 5-54
4-1.
ADJUSTMENT REMOTE COMMANDER ················ 5-54
1.
Using the adjustment remote commander ····················· 5-54
2.
Precautions upon using the adjustment remote
commander ···································································· 5-54
4-2.
DATA PROCESS ··························································· 5-55
4-3.
SERVICE MODE ·························································· 5-56
1.
Setting the Test Mode ···················································· 5-56
2.
Emergence Memory Address ········································ 5-56
2-1.
EMG Code (Emergency Code) ····································· 5-56
2-2.
MSW Code ···································································· 5-57
3.
Bit value discrimination ················································ 5-58
4.
Switch check (1) ···························································· 5-58
5.
Switch check (2) ···························································· 5-58
6.
Switch check (3) ···························································· 5-59
7.
Record of Use check ······················································ 5-59
8.
Record of Self-diagnosis check ····································· 5-60
5-1
SECTION 5
ADJUSTMENTS
DCR-IP5/IP5E/IP7BT/IP7E
5-2
DCR-IP5/IP5E/IP7BT/IP7E
Lens de
vice (Inc
luding LD-105 boar
d)
Mechanism deck  Note1
Color EVF block   LCD902 (LCD panel (EVF))
LCD block
LCD901 (LCD panel (LCD))
LCD block
LED901 (Back libht LED (LCD))
Mechanism block  M901 (Drum assy)  Note1
Mechanism block  M902 (Capstan motor)
Mechanism block  Mechanism chassis assy
PD-142 board
IC3101 (RGB dri
v
er (LCD))
PD-142 board
IC2102 (T
iming generator (LCD))
LD-105 board
IC701 (CCD imager)
VC-263 board
IC1901, X1901 
(T
iming gener
ator
, A/D)
VC-263 board
IC1207 (EVR)
VC-263 board
IC101 (V
ideo I/O)
VC-263 board
IC401 (Camera/base band process)
VC-263 board
IC902 (REC/PB 
AMP)
VC-263 board
IC1103 
(Mechanical control)
 Note4
VC-263 board
IC1203 
(HI/Camera control)
 Note5
VF-149 board
IC301 (RGB dr
iv
er (EVF))
VF-149 board
IC302 (T
iming generator (EVF))
VF-149 board
D2201,2202 
(Back light LED (EVF))
Replaced parts
Block replacement
Parts replacement
z z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z z
z z
z
z z z
Adjustment
Section
Initialization of
B, C, D, E, F, 4,
7, 8, 9 page data
Camera
Color EVF
LCD
System control
Servo, RF
Video
Mechanism
Adjustment
Initialization of D, E, F, 7 page data
Initialization of C, 4, 8, 9 page data
Initialization of B page data *1
48MHz origin oscillation adj.
HALL adj.
MR adj.
Flange back adj.
Optical axis adj.
MAX GAIN adj.
F. No. & ND light quantity standard data input
Mechanical shutter adj. *1
LV standard data input
Color reproduction adj.
AWB standard data input
Auto white balance adj.
Bright adj.
Contrast adj.
White balance adj.
VCO check.
VCO adj.
Bright adj.
Black limit adj.
PSIG gray adj.
Contrast adj.
Center level adj.
V-COM adj.
White balance adj.
Serial No. input
CAP FG duty adj.
Treel FG duty adj.
Read clock fo adj.
Switching position adj.
XREC ACT adj.
Timing ATF center value adj.
AGC adj.
Pch/Mch AEQ & LMS adj.
Chroma BPF fo adj.
S VIDEO OUT Y level adj.
S VIDEO OUT chroma level adj.
Tape path adj.
Table. 5-1-1 (1).
1.
Adjusting items when replacing main parts and boards.
• Adjusting items when replacing main parts
When replacing main parts, adjust the items indicated by 
z
 in the following table.
Note1:
When replacing the drum assy. or the mechanism deck, reset the data of page: 2, address: A2 to A4 to “00”. (Refer to “Record of Use check” of “5-
4. SERVICE MODE”)
Page of 63
Display

Sony DCR-IP5 / DCR-IP5E / DCR-IP7BT / DCR-IP7E (serv.man3) Service Manual ▷ Download

  • DOWNLOAD Sony DCR-IP5 / DCR-IP5E / DCR-IP7BT / DCR-IP7E (serv.man3) Service Manual ↓ Size: 1.05 MB | Pages: 63 in PDF or view online for FREE
  • Here you can View online or download the Service Manual for the Sony DCR-IP5 / DCR-IP5E / DCR-IP7BT / DCR-IP7E (serv.man3) in PDF for free, which will help you to disassemble, recover, fix and repair Sony DCR-IP5 / DCR-IP5E / DCR-IP7BT / DCR-IP7E (serv.man3) Movie. Information contained in Sony DCR-IP5 / DCR-IP5E / DCR-IP7BT / DCR-IP7E (serv.man3) Service Manual (repair manual) includes:
  • Disassembly, troubleshooting, maintenance, adjustment, installation and setup instructions.
  • Schematics, Circuit, Wiring and Block diagrams.
  • Printed wiring boards (PWB) and printed circuit boards (PCB).
  • Exploded View and Parts List.