DOWNLOAD Sony SAL70200G2 Service Manual ↓ Size: 8.64 MB | Pages: 103 in PDF or view online for FREE

Model
SAL70200G2
Pages
103
Size
8.64 MB
Type
PDF
Document
Service Manual
Brand
Device
Digital Camera
File
sal70200g2.pdf
Date

Sony SAL70200G2 Service Manual ▷ View online

2-8
SAL70200G2 (2.8/70-200 G SSM Ⅱ) (70-200mm F2.8 G SSM II)
HELP07
Adhesive bond (B-10): J-6082-612-A
1.  Fix the CL-032 board with three fixing screws. Apply the adhesive bond (B-10) to the heads of screws. (Three locations)
2.  Solder two lead wires (black/red) leading from the flexible BL PWB and three lead wires (blue/black/yellow) leading from the stator.
CL-032 Board
(Side A)
CL-032 Board
Apply the adhesive bond (B-10)
Apply the adhesive bond (B-10)
(From Flexible 
BL PWB)
Harness (Red)
Harness (Black)
Harness (Yellow)
(From Stator)
Harness (Blue)
Harness (Black)
HELP08
Adhesive bond (B-10): J-6082-612-A
1.  Route the harness leading from the flexible BL PWB and the harness leading from the stator as shown in the figure.
2.  Fix the CL-034 board with three fixing screws.
3.  After tightening the screws, apply the adhesive bond (B-10) to the heads of screws.
Apply the adhesive bond (B-10)
CL-034 Board
Route the harness leading 
from the flexible BL PWB
as shown in the figure.
Route the harness 
leading from the stator 
as shown in the figure.
HELP09
Adhesive bond (B-10): J-6082-612-A
1.  Route the harness leading from the flexible BL PWB.
2.  Install the CL-033 board and fix it with two screws.
3.  After tightening the screws, apply the adhesive bond (B-10) to the heads of screws.
4.  Solder the flexible BL PWB and zoom encoder flexible to the CL-033 board.
CL-033 Board
Solder the 
flexible BL PWB
Apply the adhesive bond (B-10)
Solder the zoom 
encoder flexible
Route the harness leading from the flexible BL PWB 
as shown in the figure
2-9
SAL70200G2 (2.8/70-200 G SSM Ⅱ) (70-200mm F2.8 G SSM II)
HELP10
Universal wrench: J-6082-609-A
Chip A for universal wrench: J-6082-609-1
Chip B for universal wrench: J-6082-609-2
Grease (G-115): J-6082-627-A
1.  Apply the grease (G-115) continuously to the front of G1 holding rubber (G1 holder ring side).
2.  Tighten securely the G1 holder ring, using the universal wrench.
Note:
 Tighten further.
G1 Holder Ring
G1 Holder Ring
G1 Holder Rubber
Apply the grease 
(G-115)
(G1 holder ring side)
HELP11
Adhesive bond (B-40): J-6082-614-A
1.  Align the groove of the 5 group ball frame block with the flexible card and install them as shown in the figure.
2.  Apply the adhesive bond (B-40) to the tips of eight screws.
3.  While turning clockwise the 5 group ball frame block to eliminate a play, fix it with eight screws.
Apply the adhesive 
bond (B-40)
Apply the adhesive 
bond (B-40)
Groove in 5 group ball 
frame block
5 Group Ball Frame Block
While turning clockwise 
the 5 group ball frame 
block to eliminate a play, 
install it with eight screws.
Mount
Screws
Screws
Flexible PWB
Apply the 
adhesive 
bond (B-40)
2-10
SAL70200G2 (2.8/70-200 G SSM Ⅱ) (70-200mm F2.8 G SSM II)
HELP12
1.  Affix the spring protection sheet to the G19 holder ring, starting from the cut groove for aperture connect lever in the counterclockwise 
direction. Place the center of sheet in the hole for the outer tube block fixing screw.
Note:
  Do not protrude the spring protection sheet on the slant surface at the inner side of G19 holder ring.
 
As the spring protection sheet is rectangular in shape, affix it while deforming a little by little.
2.  Thread the aperture connect lever of outer barrel block in the hole of connect barrel unit.
3.  Link the aperture connect lever to the pin of aperture operation plate unit and insert four screws in the holes.
Note:
  It is not necessary to tighten the screws at this moment.
4.  Lift up the outer tube block and lean it a little. Insert the back adjustment washer (0.5mm) in the gap between outer barrel block and 5 
group ball frame block (2 locations of both sides).
Note:
  For the number of back adjustment washer, refer to  5-4-3 Flange-back (f F) adjustment .
5.  Rotate clockwise the outer tube block to eliminate a play, viewing from the mount side and tighten firmly four screws.
Outer Tube Block
Outer Tube Block
Aperture Connect 
Lever
Spring Protection 
Sheet
Cut groove for 
aperture connect lever
Cut groove for 
aperture connect lever
Four screws inserted 
in the screw hole
Back Adjustment 
Washer
5 Group Ball 
Frame Block
5 Group Ball 
Frame Block
Lean the outer tube block 
and insert the back adjustment washer 
as shown in the figure.
Rotate clockwise to eliminate a play and 
tighten four screws.
Mount
Pin of aperture 
operation plate 
unit
Installation screw hole 
of outer tube block
Spring Protection 
Sheet
G19 Holder 
Ring
HELP13
Adhesive bond (B-10): J-6082-612-A
1.  Overlay the aperture blade unit clockwise.
2.  Open the aperture operate plate unit and install the aperture hold ring so that the aperture blade unit protrudes a little from the hole.
3.  Install nine screws tentatively.
Overlay the aperture 
blade unit clockwise
Install the aperture hold ring. 
(The aperture blade unit 
protrudes a little from the hole)
Set the aperture operate 
plate unit to the open state
Aperture Hold Ring
Screw 
(9 pieces)
4. After 
performing 5-2-2. Aperture Diameter Adjustment , tighten firmly nine screws and apply the adhesive bond (B-10) as shown 
below.
5.  Apply the adhesive bond (B-10) to the portion A (head of screw) at three locations (at an interval of every two screws).
6.  Apply the adhesive bond (B-10) portion B (protruded portion at the tip of screw) (9 locations).
Apply the adhesive bond (B-10) 
Portion A (head of screw) (3 locations)
(at an interval of every two screws)
Apply the adhesive bond (B-10) 
Portion B (protruded at the tip of screw)
(9 locations)
2-11
SAL70200G2 (2.8/70-200 G SSM Ⅱ) (70-200mm F2.8 G SSM II)
HELP14
1.  Install the aperture operate plate holder, facing the burr (by press) side to the 1st lens side.
2.  Usually, use two pieces of aperture blade spacer B (t=0.3mm).
Note:
  Use two pieces of aperture blade spacer A (t=0.2mm) only when the defect occurs in the iris dynamic characteristics.
Aperture Operate Plate Holder
Use the 
Aperture Blade Spacer A (t=0.2mm)
or
Aperture Blade Spacer B (t=0.3mm)
burr side
1st lens side
HELP15
1.  Install the zoom rubber ring to the zoom operation ring.
2.  Fold up the 1st lens side of zoom rubber ring.
3.  Affix the SW flexible setting tape not to overlap on the brush cover and tapes.
4.  Peel the protection sheet off the adhesive side of SW flexible setting tape and return the zoom rubber ring to the original position.
Brush cover and tapes
Zoom Operation 
Ring
SW flexible setting tape 
(Affix it not to overlap on 
the brush cover and tapes)
Install the zoom rubber ring and 
fold it up as shown in the figure
HELP16
1.  Thread the projection of zoom operation ring through the hole of brush (zoom).
2.  Set the zoom to the TELE end (200).
3.  Adjust the position of brush (zoom) so that the curved portion (contact with the flexible board) of brush (zoom) comes to the circle 
portion (Part R) of zoom encoder flexible.
Note:
  In case of finished lens, perform  5-9-1. Zoom Brush Position Adjustment .
4.  Cut a polyester tape (black) 10mm in the specified size and fix the brush (zoom) with the polyester tape (black) 10mm.
5.  Set the brush cover to cover the polyester tape (black) 10mm fixing the brush (zoom).
6.  Cut a polyester tape (black) 10mm in the specified size and affix the polyester tape (black) 10mm at right and left sides of brush cover 
to fix it.
Set the TELE end (200)
Part R of brush (zoom)
Zoom Encoder Flexible
Zoom Operation Ring
Brush 
(Zoom)
Brush 
(Zoom)
Brush Cover
Brush Cover
Polyester Tape (Black) 
10mm (10X40mm)
Polyester Tape (Black) 
10mm (10X40mm)
Polyester Tape (Black) 
10mm (10X40mm)
Projection of 
zoom operation ring
Page of 103
Display

Click on the first or last page to see other SAL70200G2 service manuals if exist.