DOWNLOAD Sony DSC-W90 (serv.man2) Service Manual ↓ Size: 2.72 MB | Pages: 57 in PDF or view online for FREE

Model
DSC-W90 (serv.man2)
Pages
57
Size
2.72 MB
Type
PDF
Document
Service Manual
Brand
Device
Digital Camera / LEVEL 2
File
dsc-w90-sm2.pdf
Date

Sony DSC-W90 (serv.man2) Service Manual ▷ View online

2-10
DSC-W90_L2
HOW  TO  REMOVE  THE  ZOOM  GEAR  BLOCK
1
Unsolder the zoom motor.
2
Remove the FG leaf spring.
3
Remove the main flexible board from the zoom gear block.
4
Remove the zoom gear block.
2-4-2. HOW  TO  INSTALL  THE  ZOOM  GEAR  BLOCK
HOW  TO  INSTALL  THE  ZOOM  GEAR  BLOCK
1
Solder the main flexible board to the zoom gear block.
2
Install the main flexible board to the zoom gear block.
3
Attach the FG leaf spring.
1
Solder
2
FG leaf spring
Hook
Hook
4
Zoom gear block
3
Main flexible board
3
Main flexible board
Rear assembly
1
Solder
3
FG leaf spring
Zoom gear block
2
Main flexible board
2
Main flexible board
Rear assembly
2-11
DSC-W90_L2
4
Apply the lubricant (SRX-4339) to the nuruto gear, and insert it into the ring assembly.
* Rotate the gear in the ring assembly in the arrow direction until the end of the gear is not engaged 
with a concave portion of the ring assembly (because a convex portion of the rear assembly enters 
the convex portion).
5
Install the zoom gear block on the rear assembly.
6
Engaging four bosses, install the rear assembly on the ring assembly.
* The vibration-proof flexible board must be engaged with the hook of the rear assembly.
7
Tighten four screws in the order of A to D.
*
Tightening torque = 0.049 
±
 0.01N 
 m (0.5 
±
 0.1kgf 
 cm)
8
Check that the projection of the nuruto shaft that protrudes from the rear assembly is within the 
specified value given below.
*
Specified value: 0.005 – 0.395mm
4
Nuruto gear
Ring assembly
Ring assembly
7
Four screws
Hook
6
Vibration-proof 
flexible board
Nuruto shaft
Nuruto shaft
5
Zoom gear block
6
Rear assembly
Convex portion
Gear
Boss
Boss
0.005 – 0.395mm
8
D
A
B
C
2-12
DSC-W90_L2
9
Secure and connect the main flexible board.
q;
Secure and connect the vibration-proof flexible board and the shutter flexible board respectively.
Main flexible board
Main flexible board
Adhesive sheet (lower)
Hook
Hook
Ring assembly
Adhesive sheet (upper)
Z leaf 
spring
Hook
Hook
Shutter flexible board
Connector
Connector
Bousin flexible board
Adhesive 
sheet
Vibration-proof flexible board
2-13E
DSC-W90_L2
qa
 Install the OVF.
*When installing the OVF, fit a projection of OVF in the groove of the ring assembly.
Screw
Ring assembly
OVF
Projection
Groove
2-4-3.
CHECK  THE  OPERATION
Confirm the operation after installing the lens block in the set.
1
Power ON/OFF
2
Expansion and contraction confirming of lens and opening and shutting confirmation of barrier.
Confirm there are neither dirt nor wounds in the surface of the ornamental ring (A) and lens 
if there is no problem in operation.
Wipe off when dirty.
3
Confirm the operation with Wide/Tele.
Note:
Do not be of caught etc.
Do not allophone.
Page of 57
Display

Click on the first or last page to see other DSC-W90 (serv.man2) service manuals if exist.