DOWNLOAD Sony DSC-T100 (serv.man2) Service Manual ↓ Size: 3.56 MB | Pages: 46 in PDF or view online for FREE

Model
DSC-T100 (serv.man2)
Pages
46
Size
3.56 MB
Type
PDF
Document
Service Manual
Brand
Device
Digital Camera / LEVEL 2
File
dsc-t100-sm2.pdf
Date

Sony DSC-T100 (serv.man2) Service Manual ▷ View online

HELP
DSC-T100_L2
HELP
Sheet attachment positions and procedures of processing the flexible boards/harnesses are shown.
SW-496 flexible board
Loudspeaker
Microphone block
SY-171 
board
Harness (Black)
Harness (Black)
Harness (Red)
Harness (Red)
HELP
DSC-T100_L2
Hold the LSV-1220A at the center of both sides.
Do not hold the LSV-1220A in the front-rear thickness 
direction.
Do not touch the top of lens prism.
Do not touch the motor coil or terminals.
LSV-1220A
Hold here.
Do not touch here.
LSV-1220A
LSV-1220A
Lens prism
Do not touch 
the coil.
LSV-1220A
Motor
Do not touch 
the terminals.
PRECAUTIONS  WHEN  HOLDING  THE  LSV-1220A
HELP
DSC-T100_L2
Lens
Lens block
Solder
Note: 
Take care not to melt 
the mold part of        .
FOCUS  MOTOR  DISASSEMBLING  PROCEDURE
Cover the lens surface for protection.
1
 Cover the lens surface to protect from solder splashing.
2
 Remove the solder.
3
 Remove one screw.
*
Tightening torque = 0.5 
±
 0.1kgf 
 cm
4
 Remove the focus motor from the lens block.
Screw
Focus motor
Lens
Lens block
Solder
Cover the lens 
surface for protection.
1
 Cover the lens surface to protect from solder splashing.
2
 Remove the solder.
3
 Remove two screws.
*
Tightening torque = 0.5 
±
 0.1kgf 
 cm
4
 Remove the zoom motor from the lens block.
Screw
Zoom motor
Note: 
Take care not to melt 
the mold part of        .
ZOOM  MOTOR  DISASSEMBLING  PROCEDURE
HELP
DSC-T100_L2
BT holder
Notch
1
BT-035 
flexible board
2
Battery terminal board
Battery terminal 
board
Notch
Notch
Battery terminal board
1
Install the BT-035 flexible board in the BT holder.
2
Insert the battery terminal board into a slit in the BT holder to install.
* The battery terminal board is attached with the notch for installation.
3
Fold the notch 3 or 4 times repeatedly to break.
INSTALLATION  METHOD  OF  BATTERY  TERMINAL  BOARD
Page of 46
Display

Click on the first or last page to see other DSC-T100 (serv.man2) service manuals if exist.