Sony XR-C9100R Service Manual ▷ View online
– 17 –
2
Move the arm (suction) in the arrow
direction and fit on projection.
1
Fit the arm (suction) on the shaft.
projection
A
part
C
part
B
part
D
part
8
Hold the hanger by
bending the claw.
6
Fit projection on
D
part.
4
Fit claw on
B
part.
3
Put the housing
under
A
part.
5
Fit projection on
C
part.
1
Install the catcher to the hanger.
2
Install the hanger onto
two claws of the housing.
7
Holder the hanger by bending the claw.
hanger
housing
SECTION 3
ASSEMBLY OF MECHANISM DECK
ARM (SUCTION)
Note : Follow the assembly procedure in the numerical order given.
HOUSING
– 18 –
gear (LDG-D)
5
gear (loading FT)
6
polyethylene washer
2
tension spring (LD-2)
2
tension spring (LD-1)
gear (LDG-FB)
lever (LDG-A)
hole
hole
4
Align hole in the gear (LDG-D)
with hole the lever (LDG-A).
3
Move the lever (LDG-B)
in the arrow direction.
1
shaft
A
shaft
B
2
Fit the lever (LDG-B) on
shafts
A
and
B
and
install it.
3
type-E stop ring 2.0
shaft
A
shaft
B
shaft
C
1
Fit the lever (LDG-A) on
shafts
A
–
C
and install it.
LEVER (LDG-A) / (LDG-B)
GEAR (LOADING FT)
– 19 –
2
guide (C)
1
three claws
1
precision screws
+P 2x2
capstan/ reel motor
30˚
GUIDE (C)
MOUNTING POSITION OF CAPSTAN/REEL MOTOR (M901)
– 20 –
main board
TP (DOLBY)
TP (DOLBY)
L (L-CH)
R (R-CH)
R (R-CH)
test tape
P-4-D400
(400 Hz, 0 dB)
set
level meter
PRECAUTION
1. Wipe the following components with an absorbent cotton cloth
moistened with alcohol before adjustment :
PB head
Pinch roller
Idler
Rubber belt
Capstan
2. Demagnetize the PB head using a head demagnetizer.
3. Be careful not to use a magnetized screwdriver.
4. After the adjustment is completed, lock the adjustment parts
3. Be careful not to use a magnetized screwdriver.
4. After the adjustment is completed, lock the adjustment parts
using screws.
5. Unless otherwise specified, make adjustments at the specified
voltage (14.4V).
Torque Measurement
Mode
Torque Meter
Meter Reading
35 – 65 g • cm
FWD
CQ-102C
(0.49 – 0.90 oz • inch)
FWD
0.5 – 5.0 g • cm
Back Tension
(0.01 – 0.07 oz • inch)
35 – 65 g • cm
REV
CQ-102RC
(0.49 – 0.90 oz • inch)
REV
0.5 – 5.0 g • cm
Back Tension
(0.01 – 0.07 oz • inch)
60 – 200 g • cm
FF, REW
CQ-201B
(0.83 – 2.78 oz • inch)
Tape Tension Measurement
Mode
Tension Meter
Meter Reading
FWD
CQ-403A
more than 60 g
REV
CQ-403R
(more than 2.12 oz)
SECTION 5
ELECTRICAL ADJUSTMENTS
SECTION 4
MECHANICAL ADJUSTMENTS
See the adjustment location from on page 24 for the adjust-
ment.
ment.
TAPE SECTION
Tape Speed Adjustment
Procedure :
1. Put the set into the FWD PB mode.
1. Put the set into the FWD PB mode.
Specification : Constant speed
Speed checker
Frequency counter
– 1 to + 2 %
2,970 to 3,060 Hz
Adjustment Location : See page 24.
DOLBY Level Adjustment
Setting :
SHIFT
n 3 (PLAY MODE) button (twice) : NR off
Procedure :
1. Put the set into the FWD PB mode.
2. Adjust RV230 (L-CH) and RV240 (R-CH) so that level meter
1. Put the set into the FWD PB mode.
2. Adjust RV230 (L-CH) and RV240 (R-CH) so that level meter
reading is – 6
±
1 dB (0.35 to 0.44 V).
Adjustment Location : See page 24.
0 dB = 0.775 V
LINE OUT REAR
test tape
WS-48A
(3 kHz, 0 dB)
WS-48A
(3 kHz, 0 dB)
set
10 k
Ω
speed checker
or
frequency counter
Click on the first or last page to see other XR-C9100R service manuals if exist.