DOWNLOAD Sony XR-C9100 Service Manual ↓ Size: 6.83 MB | Pages: 53 in PDF or view online for FREE

Model
XR-C9100
Pages
53
Size
6.83 MB
Type
PDF
Document
Service Manual
Brand
Device
Car Audio
File
xr-c9100.pdf
Date

Sony XR-C9100 Service Manual ▷ View online

– 21 –
1
 PTT 2.6x10
6
 insulated plate
2
 PTT 2.6x10
3
 ground point screw
4
 ground point screws
5
 MAIN board
3
 PTT 2.6x10
7
 PTT 2.6x10
8
 PTT 2.6x10
5
 PTT 2.6x10
4
 cord (with connector) (INVERTER)
6
 cord (with connector)
     (ANT)
1
 CN551
2
 J10
9
 heat sink
2-5. MAIN BOARD
2-6. HEAT SINK
– 22 –
2
 Move the arm (suction) in the arrow 
direction and fit on projection.
1
 Fit the arm (suction) on the shaft. 
projection
A
 part
C
 part
B
 part
D
 part
8
 Hold the hanger by
bending the claw.
6
 Fit projection on 
D
 part.
4
 Fit claw on 
B
 part.
3
 Put the housing 
under 
A
 part.
5
 Fit projection on 
C
 part.
1
 Install the catcher to the hanger. 
2
 Install the hanger onto 
two claws of the housing.
7
 Holder the hanger  by bending the claw. 
hanger
housing
SECTION 3
ASSEMBLY OF MECHANISM DECK
ARM (SUCTION)
Note : Follow the assembly procedure in the numerical order given.
HOUSING
– 23 –
gear (LDG-D)
5
 gear (loading FT)
6
 polyethylene washer
2
 tension spring (LD-2)
2
 tension spring (LD-1)
gear (LDG-FB)
lever (LDG-A)
hole
hole
4
 Align hole in the gear (LDG-D)
with hole the lever (LDG-A).
3
 Move the lever (LDG-B)
in the arrow direction.
1
shaft 
A
shaft 
B
2
 Fit the lever (LDG-B) on  
shafts 
A
 and  
B
 and 
install it.
3
 type-E stop ring 2.0  
shaft 
A
shaft 
B
shaft 
C
1
 Fit the lever (LDG-A) on 
shafts 
A
 – 
C
 and install it.
LEVER (LDG-A) / (LDG-B)
GEAR (LOADING FT)
– 24 –
2
 guide (C)
1
 three claws
1
 precision screws
     +P 2x2
capstan/ reel motor
30˚
GUIDE (C)
MOUNTING POSITION OF CAPSTAN/REEL MOTOR (M901)
Page of 53
Display

Click on the first or last page to see other XR-C9100 service manuals if exist.