Sony XR-C9100 Service Manual ▷ View online
– 21 –
1
PTT 2.6x10
6
insulated plate
2
PTT 2.6x10
3
ground point screw
4
ground point screws
5
MAIN board
3
PTT 2.6x10
7
PTT 2.6x10
8
PTT 2.6x10
5
PTT 2.6x10
4
cord (with connector) (INVERTER)
6
cord (with connector)
(ANT)
1
CN551
2
J10
9
heat sink
2-5. MAIN BOARD
2-6. HEAT SINK
– 22 –
2
Move the arm (suction) in the arrow
direction and fit on projection.
1
Fit the arm (suction) on the shaft.
projection
A
part
C
part
B
part
D
part
8
Hold the hanger by
bending the claw.
6
Fit projection on
D
part.
4
Fit claw on
B
part.
3
Put the housing
under
A
part.
5
Fit projection on
C
part.
1
Install the catcher to the hanger.
2
Install the hanger onto
two claws of the housing.
7
Holder the hanger by bending the claw.
hanger
housing
SECTION 3
ASSEMBLY OF MECHANISM DECK
ARM (SUCTION)
Note : Follow the assembly procedure in the numerical order given.
HOUSING
– 23 –
gear (LDG-D)
5
gear (loading FT)
6
polyethylene washer
2
tension spring (LD-2)
2
tension spring (LD-1)
gear (LDG-FB)
lever (LDG-A)
hole
hole
4
Align hole in the gear (LDG-D)
with hole the lever (LDG-A).
3
Move the lever (LDG-B)
in the arrow direction.
1
shaft
A
shaft
B
2
Fit the lever (LDG-B) on
shafts
A
and
B
and
install it.
3
type-E stop ring 2.0
shaft
A
shaft
B
shaft
C
1
Fit the lever (LDG-A) on
shafts
A
–
C
and install it.
LEVER (LDG-A) / (LDG-B)
GEAR (LOADING FT)
– 24 –
2
guide (C)
1
three claws
1
precision screws
+P 2x2
capstan/ reel motor
30˚
GUIDE (C)
MOUNTING POSITION OF CAPSTAN/REEL MOTOR (M901)
Click on the first or last page to see other XR-C9100 service manuals if exist.