Sony XR-C6210R / XR-C6220R Service Manual ▷ View online
– 8 –
SUB PANEL ASS’Y
MECHANISM DECK (MG-25Y-136)
Note:
Follow the disassembly procedure in the numerical order given.
SECTION 2
DISASSEMBLY
3
claw
3
two claws
1
screw
(PTT2.6
(PTT2.6
×
8)
5
sub panel ass’y
2
five screws
(PTT2.6
(PTT2.6
×
8)
4
connector
(CN500)
(CN500)
3
flexible flat cable
(CN301)
(CN301)
4
mechanism deck
(MG-25Y-136)
(MG-25Y-136)
1
screw
(PTT2.6
(PTT2.6
×
6)
2
connector
(CN302)
(CN302)
– 9 –
3
two ground point
screws
screws
5
three screws
(PTT2.6
(PTT2.6
×
8)
5
two screws
(PTT2.6
(PTT2.6
×
10)
1
screw
(PTT2.6
(PTT2.6
×
8)
XR-C6220R
5
screw
(PTT2.6
(PTT2.6
×
8)
5
two screws
(PTT2.6
(PTT2.6
×
8)
6
heat sink
2
rubber cap (25)
1
two screws
(PTT2.6
(PTT2.6
×
8)
4
main board
MAIN BOARD, HEAT SINK
– 10 –
SECTION 3
ASSEMBLY OF MECHANISM DECK
HOUSING
ARM (SUCTION)
Note:
Follow the assembly procedure in the numerical order given.
A
part
C
part
B
part
D
part
8
Hold the hanger by
bending the claw.
bending the claw.
6
Fit projection on
D
part.
4
Fit claw on
B
part.
3
Put the housing
under
under
A
part.
5
Fit projection on
C
part.
1
Install the catch to the hanger.
2
Install the hanger onto
two claws of the housing.
7
Holder the hanger by bending the claw.
hanger
housing
2
Move the arm (suction) in the arrow
direction and fit on projection.
direction and fit on projection.
1
Fit the arm (suction) on the shaft.
projection
– 11 –
LEVER (LDG-A)/(LDG-B)
GEAR (LDG-FT)
shaft
A
shaft
B
shaft
C
1
Fit the lever (LDG-A) on
shafts
shafts
A
–
C
and install it.
shaft
A
shaft
B
2
Fit the lever (LDG-B) on
shafts
shafts
A
and
B
and
install it.
3
type-E stop ring 2.0
gear (LDG-D)
5
gear (LDG-FT)
6
polyethylene washer
2
tension spring (LD-2)
2
tension spring (LD-1)
gear (LDG-FB)
lever (LDG-A)
hole
hole
4
Align hole in the gear (LDG-D)
with hole the lever (LDG-A).
with hole the lever (LDG-A).
3
Move the lever (LDG-B)
in the arrow direction.
in the arrow direction.
1
Click on the first or last page to see other XR-C6210R / XR-C6220R service manuals if exist.