Sony WX-C570R Service Manual ▷ View online
– 21 –
2-9. LEVER ASSY
2-10. SERVO BOARD
4
claws
2
DISC IN SW board
7
lever (L) assy
3
tension spring (LR)
6
lever (R) assy
5
guide (disc)
1
PS 2x4
5
PS 2x4
1
CN3
3
P 2x3
4
loading motor assy
7
SERVO board
2
CN2
6
PS 2x4
– 22 –
2-12. CHASSIS (OP) (O/S) ASSY
• When installing, take note of the positions
arm (roller) and washers. (Fig. 1)
2-11. ROLLER ASSY
Fig. 1
4
PS 2x3
5
LOAD SW board
1
tension spring (RA)
2
arm (roller)
3
roller assy
washer
arm
arm
washer
washers
1
tension spring (angle)
8
compression spring (FL)
7
chassis (OP) (O/S) assy
9
compression spring (FL)
2
tension spring (KR1)
5
Fit lever (D) in the
direction of the arrow.
3
damper (T)
4
damper (T)
6
Turn loading ring in the
direction of the arrow.
– 23 –
2-13. OPTICAL PICK-UP BLOCK
1
P 2x3
2
sled motor assy
3
optical pick-up block
– 24 –
SECTION 3
ASSEMBLY OF MECHANISM DECK
Note : Follow the assembly procedure in the numerical order given.
HOUSING
ARM (SUCTION)
A
part
C
part
B
part
D
part
8
Hold the hanger by
bending the claw.
6
Fit projection on
D
part.
4
Fit claw on
B
part.
3
Put the housing
under
A
part.
5
Fit projection on
C
part.
1
Install the catcher to the hanger.
2
Install the hanger onto
two claws of the housing.
7
Holder the hanger by bending the claw.
hanger
housing
2
Move the arm (suction) in the arrow
direction and fit on projection.
1
Fit the arm (suction) on the shaft.
projection
Click on the first or last page to see other WX-C570R service manuals if exist.