DOWNLOAD Sony SCD-C222ES Service Manual ↓ Size: 6.62 MB | Pages: 98 in PDF or view online for FREE

Model
SCD-C222ES
Pages
98
Size
6.62 MB
Type
PDF
Document
Service Manual
Brand
Device
Audio
File
scd-c222es.pdf
Date

Sony SCD-C222ES Service Manual ▷ View online

SCD-C222ES
11
3-6.
POWER  BOARD
3-7.
MAIN  BOARD
6
POWER board
7
four washers
4
four screws
(BVTP3 
×
 8)
3
connector
(CN707)
5
two clamps
2
connector
(CN301)
1
connector
(CN151)
1
connector
(CN105)
3
connector
(CN705)
4
MAIN board
1
connector
(CN705)
3
clamp
1
connector
(CN707)
2
four screws
(BVTP3 
×
 8)
SCD-C222ES
12
4
base unit (DVBU5A)
1
wire (flat type) (25 core)
(CN003)
2
two floating screws
(PTPWH M2.6)
BU section
Note: When installing the BU
on the chassis, set the
lever (lifter) in free
position, the gear (U/D)
in UP position, and insert 
the shaft      into the 
groove of gear (U/D).
gear (U/D)
b
b
3
two leaf springs (holder)
3-8.
BASE  UNIT (DVBU5A)
3-9.
TABLE  ASSY
Note: When installing the table assy 
on the chassis assy, engage 
the gear (loading C) with the groove 
by looking into the gear through 
a hole     in the table assy.
qs
table assy
9
two screws
(BTTP M2.6)
q;
clamp
e
c
c
e
qa
bracket (guide)
gear 
(loading C)
7
two screws
(BTTP M2.6)
5
screw
(BTTP M2.6)
6
bracket (guide)
2
screw
(BTTP M2.6)
1
Slide the tray until the screw 
that fixes the bracket (guide) 
can be seen through a round
hole      in the table assy.
3
8
bracket (guide 2)
4
wire (flat type) 
(6 core) (CN15)
SCD-C222ES
13
3-10. SENSOR  BOARD
3-11. LOADING  MOTOR  BOARD
1
screw
(PTPWH M2.6)
3
belt (rotary)
4
two screws
(BTTP M2.6)
4
two screws
(BTTP M2.6)
5
SENSOR board
2
tray
3
two screws
(BTTP M2.6)
4
LOADING MOTOR board
1
belt (loading)
2
connector 
(CN13)
SCD-C222ES
14
SECTION  4
ASSEMBLY
Note:
 Follow the assembly procedure in the numerical order given.
ADJUSTING  PHASE  OF  SWING  GEAR  AND  GEAR (U/D)
6
screw
(PTPWH M2.6)
5
stopper washer (FR)
4
Push fully the shaft of shaft gear and 
align the hole shape of gear (loading B).
3
Let the swing gear through under the
chassis     and engage its dowel   
with the groove     of rotary encoder.
2
Install the rotary encoder so that
its groove      comes to the position 
shown in the figure.
1
Insert the shaft gear up to the 
position where its shaft comes
out by 5 mm.
g
g
h
h
f
f
f
7
gear (U/D)
8
screw
(PTPWH M2.6)
q;
screw
(PTPWH M2.6)
circle mark
circle mark
swing gear
gear (RV)
Fig. A
9
gear (RV)
Note: Align swing gear, a circle mark
on the gear (U/D), and the teeth
of gear (RV) to the position 
showing in the Fig. A.
Page of 98
Display

Click on the first or last page to see other SCD-C222ES service manuals if exist.