Sony HCD-HPZ7 / HCD-HPZ9 Service Manual ▷ View online
37
HCD-HPZ7/HPZ9
2-4. ASSEMBLING OF THE GEAR (STOCK ROT LONG) (LEFT)
4
gear (stock rot long)
2
gear (stock rot short)
6
two screws (2
×
6)
3
Adjusting the two stockers
5
Adjusting the one stockers
7
stocker box (L)
gear (stock rot long)
gear (stock rot short)
FRONT
SIDE
SIDE
PRECAUTION DURING GEAR
(STOCK ROT SHORT, STOCK ROT SHORT LONG) INSTALLATION
(STOCK ROT SHORT, STOCK ROT SHORT LONG) INSTALLATION
UPPER
SIDE
SIDE
long
short
Note.
Install the stock box (L) right after finishing
the phase adjustment.
Install the stock box (L) right after finishing
the phase adjustment.
1
Align the edges of the stockers. Keep the position of
the stockers until finishing installation of the gear
(stock rot short) and the stock box (L).
(stock rot short) and the stock box (L).
38
HCD-HPZ7/HPZ9
2-5. CONFIRMING THE ASSEMBLING OF THE STOCKER SECTION
stocker section
3
Confirm that each claw contacts uniformly at the
respective stop positions of the stocker assy (1) to the stocker assy (5).
2
Confirm that each claw contacts uniformly at the
respective stop positions of the stocker assy (1) to the stocker assy (5).
4
Confirm the stocker assys move smooth
by sliding the stocker assys (1) to (5)
STOCKER ASSY (R) SIDE
STOCKER ASSY (L) SIDE
UPPER
SIDE
SIDE
FRONT
SIDE
SIDE
FRONT
SIDE
SIDE
UPPER
SIDE
SIDE
1
Slide the stocker assy in the
direction of the arrow.
39
HCD-HPZ7/HPZ9
2-6. ASSEMBLING OF THE GEAR (STOCK ROTARY LEFT)
6
Move the arm (L) and the stock
base (B) vertically to the gear.
7
Check if the stock base (B) is kept
parallel with groove of the stocker.
2
gear (stock sun)
PRECAUTION DURING GEAR (STOCK PLANET) INSTALLATION
5
Position to adjust phases
for the gear (stock planet)
3
Position to adjust phases
for the gear (stock sun).
1
Align the edges of stockers,
and keep the position.
0
Align the edges of stockers,
and keep the position.
8
gear (stock rotary left)
4
gear (stock planet)
9
washer (5.5)
The cut-off curve should
face to the front.
face to the front.
FRONT
SIDE
SIDE
UPPER
SIDE
SIDE
UPPER
SIDE
SIDE
40
HCD-HPZ7/HPZ9
2-7. ASSEMBLING OF THE GEAR (STOCK ROTARY RIGHT)
4
gear (stock sun)
6
gear (stock planet)
7
Position to adjust phases
for the gear (stock planet).
5
Position to adjust phases
for the gear (stock sun).
2
Keep the position of the edges of
the stockers and adjust phases.
FRONT
SIDE
SIDE
3
Check that these faces are positioned
parallel to each other.
1
Turn over the stocker assy
in the direction of the arrow.
9
two screws
(BTTP M2.6
×
6)
8
stock base (A)
0
gear (stock rotary right)
qa
washers (5.5)
The cut-off curve should
face to the front.
face to the front.
PRECAUTION DURING GEAR
(STOCK PLANET) INSTALLATION
(STOCK PLANET) INSTALLATION
UPPER
SIDE
SIDE
Click on the first or last page to see other HCD-HPZ7 / HCD-HPZ9 service manuals if exist.