Sony DHC-AZ2D / DHC-AZ5D / HCD-AZ2D / HCD-AZ5D Service Manual ▷ View online
17
HCD-AZ2D/AZ5D
3-11. HOLDER (BU) ASSY
1
screw
(B 2.6
(B 2.6
×
8)
2
lever (CL UP2)
6
holder (BU) assy
5
floating screw
(PTPWH M2.6)
(PTPWH M2.6)
5
floating screw
(PTPWH M2.6)
(PTPWH M2.6)
4
LHL support
3
two screws
(B 2
(B 2
×
6)
3-12. LEVER (BU LOCK)
3
three hooks
4
lever (BU lock)
2
gear (BU lock)
1
gear (cap)
18
HCD-AZ2D/AZ5D
3-13. CLOSE LEVER
1
washer (3-1-0.4)
2
SPR-E lever close
4
shaft disc stop
5
close lever
3
claw
3-14. LEVER (DIR), GEAR (IDL-B)
4
pulley (gear)
3
nylon washer 1.7
2
claw
washer
0
Lever (DIR)
6
gear (IDL-A)
qa
gear (IDL-B)
1
tension coil spring (DIR)
9
stoper
7
Loosen the screw.
8
Hold the release lever
and change the direction.
5
gear (cap)
19
HCD-AZ2D/AZ5D
3-15. CHASSIS (TOP)
1
screw
(B 2.6
(B 2.6
×
8)
4
three screws
(B 2.6
(B 2.6
×
8)
3
two screws
(B 2
(B 2
×
10)
5
chassis (top)
2
lever (CL UP2)
20
HCD-AZ2D/AZ5D
3-16. LEVER (LOADING-L/R)
lever (loading-R)
Align the horizontal position.
lever (loading-L)
Install the
both levers so that they move symmetrically.
2
two hooks
4
two hooks
BOTTOM VIEW
3
lever (loading-L)
5
lever (loading-R)
SPT-T (loading-R)
SPR-T (loading-L)
1
1
PRECAUTION DURING LEVER (LOADING R / L) INSTALLATION
Click on the first or last page to see other DHC-AZ2D / DHC-AZ5D / HCD-AZ2D / HCD-AZ5D service manuals if exist.