Sony CFD-V6 Service Manual ▷ View online
5
CFD-V6
SECTION 3
DISASSEMBLY
Note :
Follow the disassembly procedure in the numerical order given.
3-1. CABINET (FRONT) SUB ASSY, CABINET (REAR)
3-2. CONTROL BOARD
z
The equipment can be removed using the following procedure.
Cabinet (front) sub ASSY
Control board
Optical pick-up (KSS-213C)
Cabinet (rear)
Cabinet (upper)
Set
Volume board,
FM SW board, Main board
FM SW board, Main board
PRE board, Mechanism deck,
Optical pick-up section, CD board
Optical pick-up section, CD board
Belt, M601 (capstan/reel motor),
“HRP901 Head, Magnetic (Record/playback)”,
HE901 Head (Erase)
“HRP901 Head, Magnetic (Record/playback)”,
HE901 Head (Erase)
Power board, Inlet board,
BATT (R) board, BATT (L) board
BATT (R) board, BATT (L) board
cabinet (front) sub assy
cabinet (rear)
lid, battery case
3
three screws
+BVTP 3
×
12
6
open the Lid (CD)
2
three screws
+BVTP 3
×
12
4
screw
+BVTP 3
×
12
7
screw
+BVTP 3
×
12
0
flat cable (16core) (CN801)
5
9
1
8
knob (vol )
cabinet (front) sub assy
CONTROL board
1
three screws
+BVTP 2.6
×
8
2
two screws
+BVTP 2.6
×
8
3
6
CFD-V6
3-3. CABINET (UPPER)
8
9
6
two screws +BVTP 3
×
10
5
screw +BVTP 3
×
12
1
three screws
+BVTP 3
×
12
4
screw
+BVTP 3
×
12
remove the handle in
the direction of the arrow.
the direction of the arrow.
2
open the cassette holder assy by
pressing STOP/EJECT button.
3
open the Lid (CD)
cabinet (rear)
cabinet (upper)
STOP/EJECT
button
7
CNP902
(POWER board)
3-4. POWER BOARD, INLET BOARD, BATT (R) BOARD, BATT (L) BOARD
2
two screws
+BVTP 3
×
10
1
four screws
+BVTP 3
×
10
INLET board
POWER board
cabinet (rear)
BATT (R) board
CNP907
BATT (L) board
5
two screws
+WH 3
×
8
6
CNP908
4
CNP907
3
a
a
8
7
7
CFD-V6
3-6. PRE BOARD, MECHANISM DECK, OPTICAL PICK-UP SECTION, CD BOARD
0
three screws
+BVTP 3
×
10
5
screw
+BVTP 3
×
10
MAIN board
2
remove solder
(five places)
FM SW board
6
KH801
S801
7
wire, parallel (CN802)
(15 core)
4
remove solder
(four places)
VOLUME board
cabinet(upper)
1
two screws
+BVTP 3
×
10
3
qa
9
wire, parallel (CNP303)
(10 core)
8
CNP304
3-5. VOLUME BOARD, FM SW BOARD, MAIN BOARD
optical pick-up section
CD board
mechanism deck
PRE board
1
screw
+BVTP 3
×
10
5
remove solder
(four places)
1
two screws +BVTP 3
×
10
3
screw +BVTT 2
×
6
6
two screws +PWH 2.6
×
10
6
two screws
+PWH 2.6
×
10
9
screw
+BVTT 2
×
6
qa
wire, parallel (CNP701)
(16 core)
8
remove solder
(four places)
7
2
0
4
cabinet(upper)
8
CFD-V6
3-7. BELT, M601 (CAPSTAN / REEL MOTOR), “ HRP901 HEAD, MAGNETIC (RECORD/PLAYBACK) ”,
HE901 HEAD (ERASE)
mechanism deck
HE901 head (erase)
HRP901 head, magnetic (record/ playback)
1
two screws
+B 2.6
×
5
7
claws
5
claws
4
M601
(capstan/reel motor)
2
3
belt
8
6
3-8. OPTICAL PICK-UP (KSS-213C)
4
1
2
5
3
bend the stopper
chassis ASSY, motor (spindle)
shaft, sled
claws
claw
claw
claw
cover, CD
gear
optical pick-up (KSS-213C)
Click on the first or last page to see other CFD-V6 service manuals if exist.