DOWNLOAD Sharp VC-M315HM (serv.man3) Service Manual ↓ Size: 192.6 KB | Pages: 2 in PDF or view online for FREE

Model
VC-M315HM (serv.man3)
Pages
2 Few pages! See other manuals at the bottom of the first or last page.
Size
192.6 KB
Type
PDF
Document
Service Manual
Brand
Device
VCR / Disassembly and reassembly
File
vc-m315hm-sm3.pdf
Date

Sharp VC-M315HM (serv.man3) Service Manual ▷ View online

4
VC-M305HM/LM
VC-M315HM/LM
8
A
D
7
7
9
1
C
2
4
2
4
5
B
E
B
D
A
C
6
D
VC-M315HM/LM
FRONT PANEL
B
3
3
VC-M305HM/LM
FRONT PANEL
B
3
3
6
E
TOP CABINET
TOP CABINET 
FIX ANGLE
MAIN FRAME
OPERATION PWB
ANTENNA 
TERMINAL
COVER
EUR-TERM PWB
MAIN PWB
MECHANISM
CHASSIS
CASSETTE
HOUSING
CONTROL
F
F
2. DISASSEMBLY AND REASSEMBLY
2-1  DISASSEMBLY OF MAJOR BLOCKS
TOP CABINET
: Remove 2 screws 
1
.
FRONT PANEL
: Remove 2 screws 
2
 and 7 clips 
3
.
MECHANISM/
: Remove 2 screw 
4
, 1 screw 
5
.
MAIN PWB
Remove 2 screws 
6
 and 2 screws 
7
with antenna terminal cover. Remove
1screw 
9
. Remove 1 screw 
with
top cabinet fix angle.
5
VC-M305HM/LM
VC-M315HM/LM
Pinch Drive Cam
Synchro Gear
Master cam
Main Chassis
Drive Lever
2-2  CARES WHEN REASSEMBLING
INSTALLING THE CASSETTE HOUSING
When the cassette housing is installed on the mechanism,
the initial setting is essential condition.
There are two initial setting methods, namely electrical and
mechanical.
1. Electrical initial setting
So as to perform initial setting of mechanism execute the
Step 1 of Installation of cassette housing. After ascertaining
the return to the initial setting position install the cassette
housing. (Conditions: When mechanism and PWB have
been installed)
2. Mechanical initial setting
• Rotate the worm gear by pushing the flange manually until
return to initial position.
• When apply power supply to rotate the loading motor,
please remove/unsolder at least one terminal wire.
the terminal wire, there is a possibility the capstan motor
IC will damage.
• The maximum applied voltage is 9V. If more than 9V,
there is apossibility the mechanism will damage.
• After ascertaining the return to the initial set position
install the cassette housing in the specified position. (This
method is applied only for the mechanism.)
Rotate the flange of worm gear by using thin stick.
CW • • • Loading direction
CCW • • • Ejection direction
Note:
Be careful not to damage the gear of worm gear and 
worm wheel gear. It miight cause a strange sound.
AH CONNECTOR
AE CONNECTOR
END SENSOR
END TIP SW
AA CONNECTOR
AD CONNECTOR
MODE SW
START SENSOR
90¡
180¡
270¡
MASTER CAM POSITION
This positioning hole
should be at front side.
INSTALLING THE MECHANISM ON PWB
Lower vertically the mechanism, paying attention to the
mechanism edge mode SW position, (Set the mode SW
position to 270° and make sure the master cam position
hole also in 270° position) and install the mechanism with
due care so that the parts are not damaged.
* Please make sure to insert correctly.
If not, strange moving will occur and will couse mecha-
nism damage.
PARTS WHICH NEED PARTICULAR CARE
When installing the mechanism chassis on the PWB unit,
take care so as to prevent deformation due to contact of
mechanism chassis with REC TIP SW.
Display

Sharp VC-M315HM (serv.man3) Service Manual ▷ Download

  • DOWNLOAD Sharp VC-M315HM (serv.man3) Service Manual ↓ Size: 192.6 KB | Pages: 2 in PDF or view online for FREE
  • Here you can View online or download the Service Manual for the Sharp VC-M315HM (serv.man3) in PDF for free, which will help you to disassemble, recover, fix and repair Sharp VC-M315HM (serv.man3) VCR. Information contained in Sharp VC-M315HM (serv.man3) Service Manual (repair manual) includes:
  • Disassembly, troubleshooting, maintenance, adjustment, installation and setup instructions.
  • Schematics, Circuit, Wiring and Block diagrams.
  • Printed wiring boards (PWB) and printed circuit boards (PCB).
  • Exploded View and Parts List.