DOWNLOAD Sharp XG-C50XE (serv.man24) Service Manual ↓ Size: 11.62 MB | Pages: 127 in PDF or view online for FREE

Model
XG-C50XE (serv.man24)
Pages
127
Size
11.62 MB
Type
PDF
Document
Service Manual
Brand
Device
Projector / Complete service manual
File
xg-c50xe-sm24.pdf
Date

Sharp XG-C50XE (serv.man24) Service Manual ▷ View online

11
XG-C50X
Connection Pin Assignments
RS-232C Terminal: 9-pin Mini DIN female connector
Pin No.
Signal
Name
I/O
Reference
1
VCC
+3.3V (Reserved)
 Output
Not connected
2
RD
Receive Data
Input
Connected to internal circuit
3
SD
Send Data
Output
Connected to internal circuit
4
EXIR
Detector of Option Unit
Input
Not connected
(Reserved)
5
SG
Signal Ground
Connected to internal circuit
6
ERX
IR Receive Signal from
Input
Not connected
IR Amplifier (Reserved)
7
RS
Request to Send
 Output
Not connected
8
CS
Clear to Send
Input
Not connected
9
ETX
IR Transmit Signal
Output
Not connected
(Reserved)
9-pin D-sub male connector of the DIN-D-sub RS-232C adaptor
Pin No.
Signal
Name
I/O
Reference
1
CD
N
ot connected
2
RD
Receive Data
Input
Connected to internal circuit
3
SD
Send Data
Output
Connected to internal circuit
4
ER
N
ot connected
5
SG
Signal Ground
Connected to internal circuit
6
DR
Data Set Ready
Not connected
7
RS
Request to Send
Output
Connected to internal circuit
8
CS
Clear to Send
Input
Connected to internal circuit
9
CI
N
ot connected
RS-232C Cable recommended connection: 9-pin D-sub female connector
Pin No.
Signal
Pin No.
Signal
1
CD
1
CD
2
RD
2
RD
3
SD
3
SD
4
ER
4
ER
5
SG
5
SG
6
DR
6
DR
7
RS
7
RS
8
CS
8
CS
9
CI
9
CI
Note
Depending on the system layout, it is necessary to connect Pin 4 and Pin 6 on the controlling device (e.g. PC).
USB Port: 4 pin B-type USB connector
Pin No.
Signal
Name
1
VCC
USB power
2
USB–
USB data–
3
USB+
USB data+
4
SG
Signal Ground
INPUT 1/2 RGB and OUTPUT Signal Terminal: 15-pin Mini D-sub female connector
RGB Input
1. Video input (red)
2. Video input (green/sync on green)
3. Video input (blue)
4. Reserve input 1
5. Composite sync
6. Earth (red)
7. Earth (green/sync on green)
8. Earth (blue)
9. Not connected
10. GND
11. GND
12. Bi-directional data
13. Horizontal sync signal
14. Vertical sync signal
15. Data clock
Component Input
1. P
R
 (C
R
)
2. Y
3. P
B
 (C
B
)
4. Not connected
5. Not connected
6. Earth (P
R
)
7. Earth (Y)
8. Earth (P
B
)
9. Not connected
10. Not connected
11. Not connected
12. Not connected
13. Not connected
14. Not connected
15. Not connected
Projector
Pin No.
4
5
6
PC
Pin No.
4
5
6
5
10
15
1
6
11
8
9
6
5
2
1
4
3
7
1
5
6
9
5
1
9
6
1
2
4
3
12
XG-C50X
Dimensions
Side View
Side View
Top View
Rear View
Front View
Bottom View
3
15
/
16
 (100.5)
9
1
/
2
 (241.5)
15
3
/
8
 (390)
5 (126.5)
1
/
16
 (1.5)
1
/
16
 (1.5)
3
1
/
8
 (80)
ø 67.5
4
3
/
8
 (111.75)
2
15
/
16
 (75)
M4
M4
M4
M4
2
11
/
16
(67.5)
4
15
/
16
 (124.5)
5
/
16
 (7.5)
3
 7
/
8
 (99)
8
 7
/
16
 (213.3)
11
 9
/
16
 (294)
3
/
16
(5.2)
1
/
8
(4)
9
/
16
 (15)
2
1
/
8
(54.5)
1
3
/
4
(44.5)
4
1
/
8
 (104)
Units: inches (mm)
13
XG-C50X
REMOVING OF MAJOR PARTS
1. Removal of the bottom filter cover and lamp unit cover
1-1. Detach the bottom filter cover.
1-2. Loosen the lock screw from the lamp unit cover, and detach the lamp unit cover.
1-3. Pull out the carrying handle.
1-4. Press the 
~
-marked spot of the upper half of the lens cover to unhook the claw, and detach the upper lens
cover.
1-5. Detach the lower half of the lens cover.
2. Removal of the top panel and rear panel
2-1. Remove the six lock screws (black) and one lock screw (yellow) from the top panel.
2-2. Remove the eight lock screws from the rear panel and detach the rear panel.
2-3. Slowly lift the top panel and disconnect the connector from the key PWB. Remove another screw and detach
the top panel.
1-2
1-1
Lamp unit cover
Bottom filter cover
Upper half of the lens cover
Carrying handle
Lower half of the lens cover
1-3
1-5
1-4
2-1
2-2
2-3
Top panel
Rear panel
(Black)
(Yellow)
2-1
14
XG-C50X
3. Removal of the PWBs
3-1. Remove the two lock screws from the lamp socket angle. Detach the lamp socket angle.
3-2. Lift the ballast unit. Disconnect the connector and detach the ballast unit.
3-3. Remove the lock screw from the PWB unit cover and detach the cover.
3-4. Remove the three lock screws from the PWB assembly, disconnect the connector and detach the PWB
assembly.
3-5. Remove the two lock screws from the cooling fan, disconnect the connector and detach the cooling fan.
3-6. Remove the lock screw from the grounding terminal, disconnect the connector and detach the AC inlet PWB.
4. Removal of the optical mechanism, fan PWB, power PWB and R/C receiver PWB
4-1. Remove the seven lock screws from the optical mechanism, and take out the optical mechanism.
4-2. Remove the lock screw from the cooling fan, and detach the cooling fan and fan PWB.
4-3. Remove the four lock screws from the power PWB, and detach the power PWB.
4-4. Take out the R/C receiver PWB.
3-1
3-2
3-5
3-4
3-6
3-3
3-4
PWB Ass'y
AC Inlet PWB
PWB Ass'y cover
Ballast Unit
Cooling Fan
4-1
4-2
4-1
Power PWB
R/C Receiver PWB
Fan PWB
Cooling Fan
4-3
4-3
Page of 127
Display

Click on the first or last page to see other XG-C50XE (serv.man24) service manuals if exist.