DOWNLOAD Sharp AR-F11 (serv.man3) Service Manual ↓ Size: 685.46 KB | Pages: 58 in PDF or view online for FREE

Model
AR-F11 (serv.man3)
Pages
58
Size
685.46 KB
Type
PDF
Document
Service Manual
Brand
Device
Copying Equipment / Finisher unit basic operation
File
ar-f11-sm3.pdf
Date

Sharp AR-F11 (serv.man3) Service Manual ▷ View online

2-44
CHAPTER 2   FINISHER UNIT BASIC OPERATION
4) The tray lift motor rotates, and the tray moves to suit the height of the stack. The appropriate
height in relation to the existing stack is checked by the height sensor (PS1).
Tray 2 lift motor
Height sensor (PS1)
M10
Figure 2-244
M8
Claw
Shutter closed 
detecting 
switch (MS4)
Shutter open 
sensor (PI5)
Shutter
Claw
One-way cam
Second feed motor
Figure 2-245
2-45
CHAPTER 2   FINISHER UNIT BASIC OPERATION
Sequence Operations (shutter drive)
Move from Tray 1 to Tray 2
Second feed motor (M8)
Shutter 
closed
Tray moved
Shutter 
opened
Tray 1 lift motor (M5)
Tray 2 lift motor (M10)
Shutter closed detecting 
switch (MS4)
Shutter open 
sensor (PI5)
Height sensor (PS1)
Correct height detected
Motor CW rotation
Motor CCW rotation
Figure 2-246
2-46
CHAPTER 2   FINISHER UNIT BASIC OPERATION
J.
Buffer Path Operation
1.
Outline
This machine is provided with a buffer paper path for continuously receiving paper from the host
machine during stapling and job offset operation on the stapling tray. A maximum of three copies
(three originals or more in the staple mode) are wrapped around the buffer roller. During this time, job
offset and stapling are performed on the stapling tray.
The following shows operation on the buffer paper path.
1) When the first sheet arrives, the buffer inlet solenoid (SL2) remains off. The first sheet enters the
buffer path.
OFF
SL2
First sheet
Buffer inlet solenoid
Figure 2-247
2) When the leading edge of the sheet has moved past the buffer path inlet paper sensor (PI17), the
buffer outlet solenoid (SL3) turns on so as to cause the sheet to wrap around the buffer roller.
ON
SL3
Buffer outlet 
solenoid
Buffer path inlet paper 
sensor (PI17)
Figure 2-248
2-47
CHAPTER 2   FINISHER UNIT BASIC OPERATION
3) When the leading edge of the sheet has moved past the buffer path paper sensor (PI14), the buffer
roller stops and waits for the second sheet.
First sheet
Second sheet
Buffer path paper 
sensor (PI14)
Figure 2-249
4) When the second sheet arrives and its leading edge reaches the inlet sensor (PI1), the buffer roller
starts to operate once again.
Second sheet
Inlet sensor (PI1)
First sheet
Figure 2-250
Page of 58
Display

Click on the first or last page to see other AR-F11 (serv.man3) service manuals if exist.