DOWNLOAD Sharp PN-V602 (serv.man2) Service Manual ↓ Size: 2.23 MB | Pages: 27 in PDF or view online for FREE

Model
PN-V602 (serv.man2)
Pages
27
Size
2.23 MB
Type
PDF
Document
Handy Guide
Brand
Device
Monitor / PNV Multi-Display Setup Notes
File
pn-v602-sm2.pdf
Date

Sharp PN-V602 (serv.man2) Handy Guide ▷ View online

CONFIDENTIAL
CONFIDENTIAL
Multi Display Setup Manual <Rev1.0 > September.30, 2010
9
Cable routing (for Enlarge mode)
Cable configuration for Enlarge mode
1) DVI Daisy chain
2) Other input (HDMI/RGB/Component) and 
DVI connection in case of more than 6 monitors.  
Third monitor and after
DVD/BLUE RAY Player
Signal Splitter
Please refer to the user manual for detailed connection 
information of the signal splitters.  
CONFIDENTIAL
CONFIDENTIAL
Multi Display Setup Manual <Rev1.0 > September.30, 2010
10
Enlarge mode setup with OSD
Enlarge mode setup
CONFIDENTIAL
CONFIDENTIAL
Multi Display Setup Manual <Rev1.0 > September.30, 2010
11
Cable routing (for Dot by Dot configuration)
Cabling for Dot by Dot
PN-V601
PN-ZB02
PN-V601
PN-ZB02
PN-V601
PN-ZB02
PN-V601
PN-ZB02
Work station
Graphic board
Graphic boards which have multiple out put terminals are necessary to realize dot by dot display.
Each monitor needs to be connected  via DVI or HDMI to a dedicated port on the graphic cards.
Multi display setup depends on the type of graphic board and graphics driver.
Please refer to the details supplied in the graphic board manuals.  
DVI / HDMI
DVI / HDMI
DVI / HDMI
DVI / HDMI
CONFIDENTIAL
CONFIDENTIAL
Multi Display Setup Manual <Rev1.0 > September.30, 2010
12
PNZR01(light receiving device)
Cable routing for monitor control
Cabling (for monitor control)
1) Connection by RS‐232C
3) Mixed Connection by RS‐232C and LAN
1. Choose RS‐232C from RS‐232C/LAN SELECT at the set 
 
up page of the all monitors in OSD menu
2. Assign a unique ID number to each monitor
3. Connect PC (1)
 
and the first monitor with RS‐232C 
 
straight cable (do not use a null‐modem cable)
4. Make a daisy chain with RS‐232C straight cables
5. Install monitor calibration tool and the drivers for the     
 
measuring device into PC (1).
 
*If you use the remote control in this configuration, please set PN‐ZR01 
 
(light‐receiving device) to the first monitor. 
2) Connection by LAN
1. Choose LAN from RS‐232C/LAN SELECT at the set 
 
up of the all monitors.
2. Assign unique IP address to each monitor. (static IP or DHCP)
3. Connect PC (1) and all monitors by LAN
4. Install monitor calibration tool and the drivers for the 
 
measuring device into the PC (1)
*If you use the remote control in this configuration, please set
 
PN‐ZR01 
 
(light‐receiving device) to the first monitor. And you need to make a daisy
 
chain with RS‐232C straight cables and assign unique IDs as well.
1. Choose LAN from 
 
RS‐232C/LAN SELECT at the set up 
 
of the first unit. 
2. Select RS‐232C for 2nd
 
monitor and each one after
3. Assign a unique ID number to each monitor
 
4. Connect PC (1) and the first monitor by LAN
4. Make daisy chain for all remaining monitors with RS‐232C 
straight cable (do not use null‐modem cables)
5. Install monitor calibration tool and the drivers for the 
 
measuring device into PC (1).
 
*If you use the remote control in this configuration, please set
 
PN‐ZR01 
 
(light‐receiving device) to the first monitor. 
Three types of connections are available.
(1) Control and measuring PC
(1) Control and measuring PC
PNZR01(light receiving device)
PNZR01
(light receiving device)
(1) Control and measuring PC
Page of 27
Display

Click on the first or last page to see other PN-V602 (serv.man2) service manuals if exist.