Sharp PN-L603A (serv.man2) Handy Guide ▷ View online
Michigan 2 Installation Guidelines <Rev1.0> February 2014
CONFIDENTIAL
<Rev.1.1>
June 2014
PN-L703A/L703B/70TA3/70TB3
PN-L603A/L603B/60TA3/60TB3
PN-L603A/L603B/60TA3/60TB3
Installation Guidelines
BIGPAD / AQUOS BOARD
Display Unit
Business Solutions Promotion Division
SHARP Corporation
Michigan 2 Installation Guidelines <Rev1.0> February 2014
CONFIDENTIAL
1
About the handling of this material / Contents
This document is intended to explain the installation
know-how of large size displays for use by our business
partners. Therefore, please handle this document very
carefully.
This document describes basic notes to install and use
This document describes basic notes to install and use
the display for long term in good condition.
Contents
[Warning]
This document is describes installation know-how
This document is describes installation know-how
for our business partners. Please be careful not to
distribute this document or part of its contents to
other companies, or divert (use) it for competitors’
models.
Please also be reminded that numerical values and
Please also be reminded that numerical values and
expressions in this document are subject to change
without prior notice.
・
Precautions for temperature and clearance
P.2
space
・
Precautions for opening package
P.3
・
Precautions for installation and handling
P.4
・
Precautions for orientation
P.6
・
Precautions for stand installation
P.7
・
Restrictions of former SHARP stand options
P.12
・
Precautions for transportation
P.13
・
Precautions for display mounting
P.18
・
Other precautions
P.19
・
Option list
P.21
Handling this material
Michigan 2 Installation Guidelines <Rev1.0> February 2014
CONFIDENTIAL
2
Precautions for temperature and clearance space
Requirement for space
Top
20cm
Bottom
5cm
Left/Right
5cm
Behind
3.5 cm
Condition requirements for the display
- Usable range
Temperature :
5℃-35℃
Humidity :
20%-80% RH (No condensation)
- Clearance space
1) Necessary space should be secured for the
front / back / above / below / right / left side of
the display
the display
* If it is difficult to secure the sufficient space, please
adjust the surrounding temperature to be 5℃-35℃
by using the fan, for example.
by using the fan, for example.
- Installation conditions
If you use more than 2 products closely each other, please
mind that IR reception unit should not interfere each other.
Please keep the product away from direct sunlight
or strong light. These conditions may cause failure
and/or deterioration because IR technology is used for
this touch panel.
or strong light. These conditions may cause failure
and/or deterioration because IR technology is used for
this touch panel.
Please follow these requirements .
(The same requirements apply for peripheral devices.)
Securing space at the Top / Bottom / Left / Right / Behind the
of the display is necessary regardless of wall-mounting or
installation on the stand.
Temperature/humidity control and clearance space
(cm)
Michigan 2 Installation Guidelines <Rev1.0> February 2014
CONFIDENTIAL
3
After removal of the joints, please lift up
the both sides of the carton box.
Precautions for opening package
Precautions for Opening package
- Please open the package with at least
2 persons
.
- Remove 4 joints from the bottom part of the package.
- Hold the both side part of the package and lift it up.
- Hold the both side part of the package and lift it up.
Please remove joint directed
downwards by pinching the inner
tabs from both side.
Please remove 4 joints which are fixed
on both side part of the package.