DOWNLOAD Sharp LB-1085 (serv.man2) Service Manual ↓ Size: 6.67 MB | Pages: 58 in PDF or view online for FREE

Model
LB-1085 (serv.man2)
Pages
58
Size
6.67 MB
Type
PDF
Document
Service Manual / Parts Guide
Brand
Device
Monitor / Parts Manual
File
lb-1085-sm2.pdf
Date

Sharp LB-1085 (serv.man2) Service Manual / Parts Guide ▷ View online

LB-1085
DISASSEMBLY AND ASSEMBLY
4 – 11
About the drive principle of inverter for HCFL 108 MODEL
1. In case of a lamp failure
If at least one in the lamp which exists 24 becomes a life, it is designed so that all 24 lamps may go out.
LED is carried on the PWB of RUNTKA352, RUNTKA353, and RUNTKA354, and it is shown whether the lamp connected to which PWB became a
life.
LED of the PWB which the lamp has turned on normally is turned on, and LED of the PWB connected to the lamp which became a life goes out, it can
be known by LED whether the lamp connected to which PWB is a life.
RUNTKA352WJZZ
INVERTER PWB
INVERTER 
CIRCUIT
INVERTER 
CIRCUIT
RUNTKA352WJZZ
INVERTER PWB
RUNTKA352WJZZ
INVERTER PWB
RUNTKA352WJZZ
INVERTER PWB
RUNTKA352WJZZ
INVERTER PWB
RUNTKA352WJZZ
INVERTER PWB
INVERTER PREHEAT PWB
RUNTKA353WJZZ
(RUNTKA354WJZZ)
INVERTER PREHEAT PWB
RUNTKA353WJZZ
(RUNTKA354WJZZ)
INVERTER PREHEAT PWB
RUNTKA353WJZZ
(RUNTKA354WJZZ)
INVERTER PREHEAT PWB
RUNTKA353WJZZ
(RUNTKA354WJZZ)
INVERTER PREHEAT PWB
RUNTKA353WJZZ
(RUNTKA354WJZZ)
INVERTER PREHEAT PWB
RUNTKA353WJZZ
(RUNTKA354WJZZ)
INVERTER CONTROL PWB
RUNTKA351WJZZ
CONTROL SIGNAL
CONTROL SIGNAL
CONTROL CIRCUIT
PREHEAT 
CIRCUIT 
PREHEAT 
CIRCUIT 
Lamp, x24
Whole inverter composition figure
LB-1085
DISASSEMBLY AND ASSEMBLY
4 – 12
4. LCD MODULE DISASSEMBLY AND ASSEMBLY
Note: If the protection panel is installed, remove it before attaching the open/close caster jig.
1) Remove the rear cover left. (Refer to  “
■ Rear cabinet right, Rear cabinet left disassembly and assembly”)
2) Pull up the actuator on the FPC connector, and disconnect the FPC.
Remove 3 screws (M5 x 10). (Refer to step 4 in “
■ Backlight PWB disassembly and assembly”)
3) Attach the Caster jig for open/close with 4 screws.
Side view
Support Legs
Support Legs
㪥㫆㫋㪼㩷㪈㪑㩷㪤㫆㪻㫀㪽㫐㫀㫅㪾㩷㫋㪿㪼㩷㫊㫋㪸㫅㪻㩷㪽㫉㫆㫄㩷㪫㫐㫇㪼㩷㪩㩷㩿㫎㪿㪼㫅㩷㪻㪼㫃㫀㫍㪼㫉㪼㪻㪀㩷㫋㫆㩷㪫㫐㫇㪼㩷㪣
㪥㫆㫋㪼㩷㪈㪑㩷㪤㫆㪻㫀㪽㫐㫀㫅㪾㩷㫋㪿㪼㩷㫊㫋㪸㫅㪻㩷㪽㫉㫆㫄㩷㪫㫐㫇㪼㩷㪩㩷㩿㫎㪿㪼㫅㩷㪻㪼㫃㫀㫍㪼㫉㪼㪻㪀㩷㫋㫆㩷㪫㫐㫇㪼㩷㪣
Servicing stand
Spacer lock screw
Hole on the right of the angle
Spacer-side counter-bored hole
The R marking gets hidden and the L marking appears instead.
Tighten up the spacer lock screw.
Remove the 
spacer lock screw.
Spacer lock screw
Marked "R"
Marked "R"
Spacer
㪥㫆㫋㪼㩷㪉㪑㩷㪝㫆㫉㩷㪽㫀㫋㫋㫀㫅㪾㩷㫆㫅㩷㫋㪿㪼㩷㪹㪼㫑㪼㫃㩷㫊㫀㪻㪼㪃㩷㫌㫊㪼㩷㪸㩷㫊㪿㫆㫉㫋㪼㫉㩷㫋㫆㫆㫃㩷㫆㫉㩷㪸㩷㫃㫆㫅㪾㪄㫋㫀㫇㩷㫋㫆㫆㫃㪅
㪥㫆㫋㪼㩷㪉㪑㩷㪝㫆㫉㩷㪽㫀㫋㫋㫀㫅㪾㩷㫆㫅㩷㫋㪿㪼㩷㪹㪼㫑㪼㫃㩷㫊㫀㪻㪼㪃㩷㫌㫊㪼㩷㪸㩷㫊㪿㫆㫉㫋㪼㫉㩷㫋㫆㫆㫃㩷㫆㫉㩷㪸㩷㫃㫆㫅㪾㪄㫋㫀㫇㩷㫋㫆㫆㫃㪅
㪲㩷㪫㫐㫇㫀㪺㪸㫃㩷㫊㪼㫋㫌㫇㩷㪴
㪥㫆㫋㪼㩷㪊㪑㩷㪮㫀㫋㪿㩷㫋㪿㪼㩷㫊㫋㪸㫅㪻㩷㫀㫅㩷㫇㫃㪸㪺㪼㪃㩷㪹㪼㩷㫊㫌㫉㪼㩷㫋㫆㩷㫃㫆㪺㫂㩷㫋㪿㪼㩷㫊㫋㪸㫅㪻㩷㪺㪸㫊㫋㪼㫉㫊㪅
㪥㫆㫋㪼㩷㪊㪑㩷㪮㫀㫋㪿㩷㫋㪿㪼㩷㫊㫋㪸㫅㪻㩷㫀㫅㩷㫇㫃㪸㪺㪼㪃㩷㪹㪼㩷㫊㫌㫉㪼㩷㫋㫆㩷㫃㫆㪺㫂㩷㫋㪿㪼㩷㫊㫋㪸㫅㪻㩷㪺㪸㫊㫋㪼㫉㫊㪅
㪣㫆㫅㪾㪄㫋㫀㫇㩷㫋㫆㫆㫃
㪝㫀㫏㫀㫅㪾㩷㫊㫇㫆㫋㫊
㩿㪤㪌㩷㫊㪺㫉㪼㫎㫊㪀
㪪㪿㫆㫉㫋㪼㫉㩷㫋㫆㫆㫃
Remove the spacer lock 
screw from the stand (Type 
R when delivered).
(Two locations in total: one 
each at top and bottom)
Ԙ
Shift the spacer to the right and align the spacer-side counter-
bored hole with the hole on the right of the angle.
ԙ
Apply the spacer lock screw in position.
(The stand is now modified as Type L.)
Ԛ
㪙㪼㫑㪼㫃㩷㫊㫀㪻㪼㩷㪹㫆㫊㫊
㩿㪽㫆㫉㩷㫇㫆㫊㫀㫋㫀㫆㫅㫀㫅㪾㪀
LB-1085
DISASSEMBLY AND ASSEMBLY
4 – 13
4) Remove the 8 screws A (M5 x 10).
Remove the 12 screws B, and undo the hinge and LMD (Lamp Maintenance Door).
5) Grasp the handles and dismount the LMD (Lamp Maintenance Door) very slowly. (*Two persons are necessary to dismount the LMD.)
B
A
A
A
∗ 3 lock screws for hinge parts
Back side
Handle
Panel unit
Handle
Before opening the "Lamp Maintenance door".
ޓMust check if FPC detach from connector.
Before opening the "Lamp Maintenance door".
ޓMust check if FPC detach from connector.
In closing the LMD, please do the inverse procedure.
LB-1085
DISASSEMBLY AND ASSEMBLY
4 – 14
5. HANDLING FOR THE SERVICE PANEL
5-1. STEPS FOR THE REPLACEMENT PART
1) Unpack the sheet assembly (replacement part).
2) Remove the left and right cushioning from the replacement part.
3) Keeping the replacement part still on the package base, attach the
stands onto the bezel sides (2 locations).
4) Remove the center cushioning.
5) Remove the wooden base.
6) Readjust the stands' height for the replacement part1, and set
them up to the installed set2.
Note:
• To keep the replacement part horizontal, first take the level just after
removing the replacement panel. Then memorize the levelness lever
position. (Initial height setting)
•  At the initial height setting, make two persons, one at each stand, turn
the lever 10 turns slowly in the correct direction, signaling each other
aloud. Finely adjust to the final height.
5-2. STEPS FOR THE DETACHED SHEET ASSEMBLY
1) Set the detached sheet assembly in the above wooden base, and
attach the cushioning in position.
2) Remove the left and right stands and pack them up.
1
2
Scale
Page of 58
Display

Click on the first or last page to see other LB-1085 (serv.man2) service manuals if exist.