DOWNLOAD Sharp UP-5300 (serv.man4) Service Manual ↓ Size: 1.06 MB | Pages: 21 in PDF or view online for FREE

Model
UP-5300 (serv.man4)
Pages
21
Size
1.06 MB
Type
PDF
Document
Service Manual
Brand
Device
EPOS / UP5300 Option Installation Manual
File
up-5300-sm4.pdf
Date

Sharp UP-5300 (serv.man4) Service Manual ▷ View online

8) Remove the option D-RAM disk.
a) Open the arms of D-RAM connector right and left.
b) The D-RAM disk will be lifted automatically.
13. MCR UNIT: UP-E12MR2
1) Fix the MCR ANGLE 
1
 to the lower cabinet with two screws 
2
.
2) Connect the MCR cable 
3
 to the MCR connector with the cable
holder 
6
, and tighter the screw 
7
 on the back of lower cabinet.
3) Install the ferrite Core 
4
 to the MCR cable and GND wire 
5
.
4) Fix the earth wire 
5
 from the UP-E12MR2 with the screw.
14. Adjusting the IRQ10/11 on the
ISA PWB.
Adjust the IRQ10 and IRQ11 using the switches: S1 and S2 on the
ISA PWB if an option equipment is connected to the ISA slot of the
ISA PWB.
S1 = IRQ10: S = ON (Connect IRQ10 to the ISA Slot.)
M = OFF (Connect IRQ10 to GND, not to the ISA Slot.)
S2 = IRQ11: S = ON (Connect IRQ11 to the ISA Slot.)
M = OFF (Connect IRQ11 to GND, not to the ISA Slot.)
15. RS232 & CENTRO I/F: ER-A8RS
*
Adjust the IRQ10 and IRQ11.
(See the "13. Adjusting the IRQ10/11 on the ISA PWB.")
1) Remove the REAR COVER.
2) Remove the screw 
1
 from the ISA BUS SHASSIS.
3) Insert the I/F PWB 
2
 to the ISA BUS CONNECTOR.
4) Fix the I/F BRACKET to the ISA BUS SHASSIS with screw 
1
.
*
Only one ER-A8RS can be installed.
5) Connect the RS232 
3
 and CENTRONICS 
4
 cables to the I/F
PWB.
*
If an I/F (locally supplied half-size PC card) other than the ER-
A8RS is connected to the ISA bus connector, it may be required to
remove reinforcement angle 
5
 when inserting the I/F.
In this case, remove reinforcement angle 
5
, insert the I/F, then
install reinforcement angle 
5
.
2
1
3
4
6
5
7
IRQ11
IRQ10
S2
M
(3)
S
(1)
M
(3)
S
(1)
S1
E R - A 8 R S   c o n n e c t i o n
2
3
1
3
4
5
UP-5300VI
– 7 –
*
Align threaded holes completely before securing the I/F PWB with
screws.
16. REAR DISPLAY UP-I20DP
1) Remove the Display filter 
1
2) Remove the Rear cover angle 
2
 from the Display filter 
1
a) Remove the two Screws 
3
3) Connect the display cable 
4
 to the connector: CN: 1 on the Main
PWB
4) Install the Display unit 
5
 to the cabinet
a) Align the positioning boss 
A
 of the bottom cabinet with the
angle hole 
A
 in the display unit.
17. POLE DISPLAY: UP-P20DP
1) Install the core 
6
 to the display cable 
1
.
2) Install the core 
7
 to the display earth cable 
4
.
3) Connect the Display cable 
1
 to the remote display connector on
the back of the set.
4) Fix the display cable 
1
 with the cable holder 
2
, and tighten the
screw 
3
 on the back of bottom cabinet.
5) Fix the display earth cable 
4
 to the main chassis with the screw
5
.
*
Cable holder 
2
Use the following type of cable holder supplied with the UP-
P20DP.
"3N" (large type)
2
3
1
4
6
5
7
UP-5300VI
– 8 –
*
 How to Extend Display Pole
The pole can be extended by installing the attached pole to the
standard pole.
COMPONENT LIST:
No.
NAME
USE
Q’ty
7
G
Pole cabinet
Pole extension
2
H
Screw (M3 
×
 4)
Pole connection
4
I
Screw (M4 
×
 16)
Securing the UP-P20DP to
the wooden table
4
J
Screw (M4 
×
 20)
Securing the UP-P20DP to
the metal table
4
K
Nut
Securing the UP-P20DP to
the metal table
4
L
Display cable (S)
This display cable (S)
should be used instead of
the standard cable and
earth wire if the UP-20DP’s
standard pole is removed
to lower the height of the
UP-20DP.
1
M
Earth wire (S)
1
  1) Remove the five screws 
1
.
  2) Remove the Base angle 
2
.
  3) Remove the PWB unit 
3
 from the Base cabinet 
4
.
  4) Remove the display cable 
5
 from the PWB unit 
3
.
  5) Remove the two screws 
6
.
  6) Remove the Base cabinet 
4
 from the pole cabinet 
7
.
  7) Pull the Ratchet 
9
 attached to the pole cabinet 
7
 out of the
Display unit 
8
 by turning it as shown in Figure A.
  8) Remove the two screws 
F
.
  9) Remove the pole cabinet 
7
 from the Ratchet 
9
.
Pattern side(PWB)
Core
1
2
3
4
5
1
6
4
7
7
8
9
10
10
9
UP-5300VI
– 9 –
10) Install the attached pole cabinet 
G
 to the pole cabinet 
7
 to fix it
with the screw 
H
.
11) Install the pole cabinet 
G
 in the opposite order of the disas-
sembly.
12) Fastening onthe table:
Secure the Base cabinet 
2
 using the screw.
No.
NAME
USE
Q’ty
I
Screw (M4 
×
 16)
Securing the UP-P20DP to
the wooden table
4
J
Screw (M4 
×
 20)
Securing the UP-P20DP to
the metal table
4
K
Nut
Securing the UP-P20DP to
the metal table
4
*
Lowering the height of the UP-P20DP
Remove the standard Pole and attach the Base cabinet 
4
 to the
Ratch 
9
. At this time, replace the standard Display cable and the
Earth wire with the S type cable 
L
 and wire 
M
.
18. DRAWER UNIT:
ER-03DW/04DW/05DW
1) Connect the drawer cable 
1
 to the drawer connector 
2
.
2) Fix the earth wire 
3
 to the main chassis from drawer box unit with
the screw 
4
.
3) Install the ferrite Core 
5
 to the drawer cable.
4) Fix the drawer cable 
1
 with the cable holder 
6
, and tighten the
screw 
7
 on the back of lower cabinet 
A
 or 
B
.
Display cable
7
7
11
11
2
5
3
4
1
1   t u r n
6
7
A
B
UP-5300VI
– 10 –
Page of 21
Display

Click on the first or last page to see other UP-5300 (serv.man4) service manuals if exist.