DOWNLOAD Sharp UP-5300 (serv.man4) Service Manual ↓ Size: 1.06 MB | Pages: 21 in PDF or view online for FREE

Model
UP-5300 (serv.man4)
Pages
21
Size
1.06 MB
Type
PDF
Document
Service Manual
Brand
Device
EPOS / UP5300 Option Installation Manual
File
up-5300-sm4.pdf
Date

Sharp UP-5300 (serv.man4) Service Manual ▷ View online

2) COM3/5, COM4/6
Two channels of COM port with an RJ45 connector are
equipped.
For 2 channels of RJ45 COM port, COM3 & COM4 or an I/O
address (COM5 & COM6) can be selected.
Two CABLE HOLDER 
1
 and SCREW (M3 
×
 8) 
2
 are con-
tained in the package.
Connector Specifications
RJ45
Pin No.
Signal
Function
I/O
1
RS
Request to Send
O
2
ER
Data terminal Ready
O
3
SD
Send Data
O
4
SG
Signal Ground
5
SG
Signal Ground
6
RD
Receive Data
I
7
DR
Data set Ready
I
8
CS
Clear to Send
I
20. BUILT-IN PRINTER: UP-T80BP
1) Remove the BOTTOM PLATE 
2
.
a) Remove the three SCREWs 
1
.
b) Remove the BOTTOM PLATE 
2
.
c) Remove the SCREW 
3
, CABLE CLAMP 
4
 and POWER SUPP-
LY CABLE 
5
.
Fig. 1
2) Install the PS+CONTROL PWB 
6
.
a) Fix the PS+CONTROL PWB 
6
 with three SCREWs 
7
 
Z
3
*
SCREW 
3
: Use the screw which was fixing the CLAMP 
4
3) Connect the POWER SUPPLY CABLE 
5
 to the
PS+CONTROL PWB 
6
. (No. CN1)
4) Connect the I/F CABLE 
8
 of the PS+CONTROL
PWB 
6
 to the UP-5300 MAIN PWB (No.CN109)
Fig. 2
2
1
3
4
5
5
6
3
7
8
: XHBSD30P06000
: XEBSD30P08000
7
30
30
UP-5300VI
– 12 –
5) Remove the PRINTER LID 
9
.
a) Remove the screw 
F
.
b) Remove the PRINTER LID 
9
.
6) Install the PAPER ROLLERs (4ea.) 
G
.
Fig. 3
7) Install the SWITCH UNIT 
H
.
a) Fix the SWITCH UNIT 
H
 on the cabinet pawl 
A
.
b) Pass the SWITCH UNIT CABLE 
I
 through the hole (B).
Fig. 4
8) Install the AUTO CUTTER RELAY PWB UNIT 
J
.
a) Install the AUTO CUTTER RELAY PWB UNIT 
J
 with SCREW
K
.
b) Pass the AUTO CUTTER RELAY PWB CABLE 
L
 through the
hole (C).
Fig. 5
9) Install the PAPER GUIDE 
M
 to the PRINTER
UNIT 
N
.
10) Install the HEAD CABLE 
O
 to the PRINTER
UNIT 
N
.
Fig. 6
10
9
11
12
A
A
B
12
13
14
15
C
16
: XEBSD30P08000
15
17
19
18
UP-5300VI
– 13 –
11) Install the PRINTER UNIT 
N
.
a) Connect the AUTO CUTTER CABLE 
P
 to the AUTO CUTTER
RELAY PWB 
J
.
b) Pass the HEAD CABLE 
O
 through the hole (C).
c) Pass the MOTOR CABLE 
Q
 and SENSOR CABLE 
R
 through
the hole (D).
d) Open the PRINTER UNIT 
N
.
e) Fix the PRINTER UNIT 
N
 with four SCREWs 
S
*
Fix the SCREWs 
S
 in the order of 
S
-(a) to 
S
-(d).
f) Fix the two EARTH WIREs 
T
 with a SCREW 
U
.
Fig. 7
12) Wiring for each cables as shown below
13) Connect the Printer cables to the CONTROL
PWB.
a) SWITCH UNIT CABLE 
I
: Connect to the CN7.
b) HEAD CABLE 
O
: Connect to the CN5.
Attach the FERRITE CORE (L size) 
V
 and
CABLE CLAMP 
4
.
Fix the CABLE CLAMP 
4
 with a SCREW 
X
.
c) AUTO CUTTER RELAY PWB CABLE 
L
: Connect to the CN4.
d) MOTOR CABLE 
Q
: Connect to the CN2.
e) SENSOR CABLE 
R
: Connect to the CN6
Fig. 8
C
D
18
23
a
23
b
23
c
23
d
14
19
22
25
24
21
20
16
: XEBSD26P06000
23
a
: XEBSD26P06000
23
b
: XEBSD26P08000
23
: XEBSD26P08000
23
d
: XHBSD30P06000
25
c
16
19
14
20
26
22
13
21
16
19
4
28
: XEBSD30P08000
28
UP-5300VI
– 14 –
14) Wiring for each cables as shown below
a) Attach the FERRITE CORE (S size) 
Y
 to the I/F CABLE 
8
.
b) Fix the I/F CABLE 
8
 and EARTH WIRE 
[
 with the CABLE
BAND 
Z
.
c) Set the switch: SW2 to the "MRS" position.
Fig. 9
15) Install the BOTTOM PLATE 
2
.
Fig. 10
16) Install the PRINTER COVER 
Y
.
Fig. 11
1
2
29
UP-5300VI
– 15 –
Page of 21
Display

Click on the first or last page to see other UP-5300 (serv.man4) service manuals if exist.