DOWNLOAD Sharp DV-RW360H (serv.man5) Service Manual ↓ Size: 1.97 MB | Pages: 14 in PDF or view online for FREE

Model
DV-RW360H (serv.man5)
Pages
14
Size
1.97 MB
Type
PDF
Document
Service Manual
Brand
Device
DVD / Pages 1 to 1-6-3
File
dv-rw360h-sm5.pdf
Date

Sharp DV-RW360H (serv.man5) Service Manual ▷ View online

1-4-3
DVD_NOTE2
(4) Bottom of the flat pack-IC is fixed with glue to the
CBA; when removing entire flat pack-IC, first apply
soldering iron to center of the flat pack-IC and heat
up. Then remove (glue will be melted). (Fig. S-1-6)
(5) Release the flat pack-IC from the CBA using twee-
zers. (Fig. S-1-6)
Note:
When using a soldering iron, care must be taken to
ensure that the flat pack-IC is not being held by glue.
When the flat pack-IC is removed from the CBA,
handle it gently because it may be damaged if force
is applied.
To Solid 
Mounting Point
Soldering Iron
Iron Wire
or
Hot Air Blower
Fig. S-1-5
Fine Tip
Soldeing Iron
CBA
Flat Pack-IC
Tweezers
Fig. S-1-6
2. Installation
(1) Using desoldering braid, remove the solder from the
foil of each pin of the flat pack-IC on the CBA so you
can install a replacement flat pack-IC more easily.
(2) The " " mark on the flat pack-IC indicates pin 1. (See
Fig. S-1-7.) Be sure this mark matches the 1 on the
PCB when positioning for installation. Then presol-
der the four corners of the flat  pack-IC. (See Fig. S-
1-8.)
(3) Solder all pins of the flat pack-IC. Be sure that none
of the pins have solder bridges.
Example :
Pin 1 of the Flat Pack-IC
is indicated by a " 
   " mark.
Fig. S-1-7
Presolder
CBA
Flat Pack-IC
Fig. S-1-8
1-4-4
DVD_NOTE2
Instructions for Handling
Semi-conductors
Electrostatic breakdown of the semi-conductors may
occur due to a potential difference caused by electrostatic
charge during unpacking or repair work.
1. Ground for Human Body
Be sure to wear a grounding band (1M
) that is properly
grounded to remove any static electricity that may be
charged on the body.
2. Ground for Workbench
Be sure to place a conductive sheet or copper plate with
proper grounding (1M
) on the workbench or other
surface, where the semi-conductors are to be placed.
Because the static electricity charge on clothing will not
escape through the body grounding band, be careful to
avoid contacting semi-conductors with your clothing.
CBA
< Incorrect >
CBA
Grounding Band
Conductive Sheet or
Copper Plate
< Correct >
1-5-1
E9B30PFS
How to Enter the Service Mode
About Optical Sensors
Caution:
An optical sensor system is used for the Tape Start and
End Sensors on this equipment.  Carefully read and
follow the instructions below. Otherwise the unit may
operate erratically.
What to do for preparation
Insert a tape into the Deck Mechanism Assembly and
press the PLAY button. The tape will be loaded into the
Deck Mechanism Assembly. Make sure the power is on,
connect TP501 (S-INH) to GND. This will stop the function
of Tape Start Sensor, Tape End Sensor and Reel Sensors.
(If these TPs are connected before plugging in the unit,
the function of the sensors will stay valid.) See Fig. 1.
Note: Because the Tape End Sensors are inactive, do
not run a tape all the way to the start or the end of the tape
to avoid tape damage.
PREPARATION FOR SERVICING
Q504
Q503
TP501
S-INH
Fig. 1
1-6-1
E9B30IB
OPERATING CONTROLS AND FUNCTIONS
 
 
 
   
 
 
 
 
 
 
 
Page of 14
Display

Click on the first or last page to see other DV-RW360H (serv.man5) service manuals if exist.