Panasonic KX-TG6461CAT / KX-TGA641RUT Service Manual ▷ View online
36
KX-TG6461CAT/KX-TGA641RUT
9.1.8.
Bell Reception
9.1.8.1.
Base Unit
9.1.8.2.
Cordless Handset
Cross Reference:
Telephone Line Interface (P.10)
Check Link (P.29)
How to Check the Cordless Handset Speaker or Receiver (P.62)
Check Link (P.29)
How to Check the Cordless Handset Speaker or Receiver (P.62)
37
KX-TG6461CAT/KX-TGA641RUT
9.1.9.
Check TAM Operation
Cross Reference:
Power Supply Circuit (P.9)
Note:
(*1) When replacing FLASH MEMORY (IC541), TAM data needs to be written to it. Refer to Base Unit (P.59) of Things to Do
after Replacing IC.
after Replacing IC.
9.1.10. Check SP-phone Transmission
Cross Reference:
Signal Route (P.15)
9.1.11. Check SP-phone Reception
Cross Reference:
Signal Route (P.15)
9.1.12. Check Corded Handset Transmis-
sion
Cross Reference:
Signal Route (P.15)
9.1.13. Check Corded Handset Reception
Cross Reference:
Signal Route (P.15)
38
KX-TG6461CAT/KX-TGA641RUT
9.2.
Troubleshooting by Symptom (Base Unit and Charger Unit)
If your unit has below symptoms, follow the instructions in remedy column. Remedies depend on wether you have DECT tester
(*1) or not.
(*1) or not.
Note:
(*1) A general repair is possible even if you don’t have the DECT tester because it is for confirming the levels, such as Acoustic
level in detail.
(*2) Refer to Check Point (Base Unit) (P.38)
level in detail.
(*2) Refer to Check Point (Base Unit) (P.38)
9.2.1.
Check Point (Base Unit)
Please follow the items below when BBIC, EEPROM or FLASH is replaced.
Note:
After the measuring, suck up the solder of TP.
*: Connections (P.52) is required beforehand.
The connections of simulator equipments are as shown in Adjustment Standard (Base Unit) (P.54).
*: Connections (P.52) is required beforehand.
The connections of simulator equipments are as shown in Adjustment Standard (Base Unit) (P.54).
Items
Check
Point
Procedure
Check or
Replace Parts
(A) 3.5 V Supply Confirma-
tion
VDD3
1. Confirm that the voltage between test point VDD3 and GND is 3.5 V ± 0.2 V.
IC301,R311,
R312,C311,
D301,F301
(B) 3.75 V Supply Confirma-
tion
VDD5
1. Confirm that the voltage between test point VDD5 and GND is 3.75 V ± 0.2 V.
IC304,R384,
R385,C385,
D301,F301
(C) 2.5 V Supply Confirma-
tion
VDD2
1. Confirm that the voltage between test point VDD2 and GND is 2.5 V ± 0.2 V.
D311,IC303
(D) 3.0 V Supply Confirma-
tion
VDD4
1. Confirm that the voltage between test point VDD4 and GND is 3 V ± 0.2 V.
C504,R387,
IC501
(E) 1.8 V Supply Confirma-
tion
VDD1
1. Confirm that the voltage between test point VDD1 and GND is 1.8 V ± 0.1 V.
Q351,IC501
(F)*
BBIC Confirmation
-
1. BBIC Confirmation (Execute the command “getchk”).
2. Confirm the returned checksum value.
2. Confirm the returned checksum value.
Connection of checksum value and program number is shown below.
IC501
(G)* EEPROM Confirmation
-
1. EEPROM Confirmation (Execute the command “sendchar EPV”).
2. Confirm the returned value.
2. Confirm the returned value.
(Value for reference is written at”EEPROM C/SUM” in
Software_Version_Table.xls)
Software_Version_Table.xls)
Note:
“checksum” vary depending on the country version. You can find them in the
batch file, PNZZ- mentioned in The Setting Method of JIG (Base Unit) (P.52).
batch file, PNZZ- mentioned in The Setting Method of JIG (Base Unit) (P.52).
IC561
(H)* BBIC Clock Adjustment
CLK
GND_C
1. Check X’tal Frequency. (10.368 MHz ± 100 Hz).
Input Command “sendchar sfr”, then you can confirm the current value.
2. If the frequency is not 10.368 MHz ± 100 Hz, Adjust the frequency of CLK exe-
cuting the command “sendchar sfr XX YY (where XX YY is the value)” so that
the reading of the frequency counter is 10.368000 MHz ± 20 Hz.
the reading of the frequency counter is 10.368000 MHz ± 20 Hz.
IC501,X511
39
KX-TG6461CAT/KX-TGA641RUT
(I)* Hookswitch Check with
DC Characteristics
-
1. Connect TIP/RING (Telephone Socket) to Tel-simulator which is connected
with 600
Ω.
2. Set line voltage to 48 V and line current to 40 mA at off-hook condition of nor-
mal telephone.
3. Execute the command “hookoff”
4. Confirm that the line current is 40 mA ± 5 mA.
5. Execute the command “hookon”.
6. Confirm that the line current is less than + 0.8 mA.
4. Confirm that the line current is 40 mA ± 5 mA.
5. Execute the command “hookon”.
6. Confirm that the line current is less than + 0.8 mA.
P101,D101,
Q111,Q112,
Q111,Q112,
R110,R111,
R112,R123,
R115,R117,
R118,D117
(J) DTMF Generator Check
-
1. Connect TIP/RING (Telephone Socket) to DTMF tester. (Load=600
Ω)
2. Link cordless handset and push dial key.
3. Confirm DTMF character.
4. Confirm that the high Group is -3 dBm ± 2 dBm.
5. Confirm that the low Group is -6 dBm ± 2 dBm.
3. Confirm DTMF character.
4. Confirm that the high Group is -3 dBm ± 2 dBm.
5. Confirm that the low Group is -6 dBm ± 2 dBm.
IC501,R154,
R153,C151,
Q131
(K)* Transmitted Power Con-
firmation
ANT2
Remove the Antenna before starting step from 1 to 7.
1. Configure the DECT tester (CMD60) as follows;
<Setting>
• Test mode: FP
• Traffic Carrier: 2
• Traffic Slot: 4
• Mode: Loopback
• PMID: 00000
• RF LEVEL = -70 dBm.
• Traffic Carrier: 2
• Traffic Slot: 4
• Mode: Loopback
• PMID: 00000
• RF LEVEL = -70 dBm.
2. Execute the command “testmode”.
3. Execute the command “sendchar dmv 2 2”.
4. Check that “Signalling Status” has been set to “Locked”, then press “ACCEPT
3. Execute the command “sendchar dmv 2 2”.
4. Check that “Signalling Status” has been set to “Locked”, then press “ACCEPT
RFPI”.
5. Initiate connection from Dect tester (“set up connect”)
6. Execute the command “ANT2”.
7. Confirm that the NTP value at ANT is 19.0 dBm ~ 25.0 dBm.
6. Execute the command “ANT2”.
7. Confirm that the NTP value at ANT is 19.0 dBm ~ 25.0 dBm.
DA802,C859,
C803,DA801,
C803,DA801,
C812,L802,
IC801,IC501
(L)*
Modulation Check
ANT2
Follow steps 1 to 6 of (K).
7.Confirm that the B-Field Modulation is -370 ± 30/+370 ± 30 kHz/div using data
type Fig31.
type Fig31.
DA802,C859,
C803,DA801,
C803,DA801,
C812,L802,
IC801,IC501
(M)* Frequency Offset Check
ANT2
Follow steps 1 to 6 of (K).
7.Confirm that the frequency offset is < ± 50 kHz.
DA802,C859,
C803,DA801,
C803,DA801,
C812,L802,
IC801,IC501
(N)* Frequency Dirft Confir-
mation
ANT2
Follow steps 1 to 6 of (K).
7.Confirm that the frequency drift is < ± 35 kHz/ms.
C803,DA801,
C812,L802,
IC801,IC501
(O)*
Sensitivity Receiver
Confirmation
ANT2
Follow steps 1 to 6 of (K).
7.Set DECT tester power to -88 dBm.
8.Confirm that the BER is < 1000 ppm.
8.Confirm that the BER is < 1000 ppm.
DA802,C859,
C803,DA801,
C803,DA801,
C826,R807,
C822,IC501
C822,IC501
(P)*
Timing Confirmation
ANT2
(Through Cordless handset)
Follow steps 1 to 6 of (K).
Follow steps 1 to 6 of (K).
7.Confirm that the Timing accuracy is
• ± 5.0 ppm (When adjust the frequency of CLK in them (H).
• ± 15.0 ppm (When do not adjust the frequency of CLK in them (A).
• ± 15.0 ppm (When do not adjust the frequency of CLK in them (A).
DA802,C859,
C803,DA801,
C803,DA801,
C812,L802,
IC801,IC501
(Q)* RSSI Level Confirmation
ANT2
Follow steps 1 to 6 of (K).
7.Execute the command “readrssi”.
8. Confirm that the returned value is 22 ± A (hex).
8. Confirm that the returned value is 22 ± A (hex).
DA802,C859,
C803,DA801,
C803,DA801,
C826,R807,
C822,IC501
C822,IC501
Items
Check
Point
Procedure
Check or
Replace Parts
Click on the first or last page to see other KX-TG6461CAT / KX-TGA641RUT service manuals if exist.