Panasonic PT-DZ16KU / PT-DZ16KE / PT-DS16KD (serv.man16) Service Manual ▷ View online
PREFACE
<PT-DZ16K>
1. Safety Precautions
2. Specifications
2. Specifications
1. The name of each part
2. OSD Menu Navigation
3. Service Mode
4. External Controls
5. Notification for service operation
6. Troubleshooting
2. OSD Menu Navigation
3. Service Mode
4. External Controls
5. Notification for service operation
6. Troubleshooting
1. Parts Location
2. Disassembly Instructions
2. Disassembly Instructions
■
COVER PAGE
■
SECTION 1 <SERVICE INFORMATION>
CONTENTS
■
SECTION 2 <DISASSEMBLY PROCEDURES>
4
2. Disassembly Instructions
3. Wiring
3. Wiring
1. Adjustment items and procedure
2. Software update procedure
2. Software update procedure
1. Block Diagram
2. Interconnection Block Diagram
3. Schematic Diagram
4. Circuit Boards Diagram
2. Interconnection Block Diagram
3. Schematic Diagram
4. Circuit Boards Diagram
1. Exploded Views
2. Replacement Parts List
2. Replacement Parts List
■
SECTION 5 <Exploded Views & Replacement Parts List>
■
SECTION 3 <ADJUSTMENTS>
■
SECTION 4 <SCHEMATIC DIAGRAM>
4
PREFACE
<PT-DZ16K>
1. Safety Precautions
1.1. General Guidelines
1.2. Leakage Current Check
1. Prepare the measuring circuit as shown in Fig.1.
Be sure to use a voltmeter having the performance described in Table 1.
2. Assemble the circuit as shown in Fig. 2. Plug the power cord in a power outlet.
3. Connect M1 to T1 according to Fig. 2 and measure the voltage.
4. Change the connection of M1 from T1 to T2 and measure the voltage again.
5. The voltmeter must read 0.375 V or lower in both of steps 3 and 4. This means that the current must be 0.75mA
or less.
6. If the reading is out of the above standard, the projector must be repaired and rechecked before returning to the
customer because of a possibility of an electric shock.
Be sure to use a voltmeter having the performance described in Table 1.
2. Assemble the circuit as shown in Fig. 2. Plug the power cord in a power outlet.
3. Connect M1 to T1 according to Fig. 2 and measure the voltage.
4. Change the connection of M1 from T1 to T2 and measure the voltage again.
5. The voltmeter must read 0.375 V or lower in both of steps 3 and 4. This means that the current must be 0.75mA
or less.
6. If the reading is out of the above standard, the projector must be repaired and rechecked before returning to the
customer because of a possibility of an electric shock.
- For continued safety, no modification of any circuit must be attempted.
- Unplug the power cord from the power outlet before disassembling this projector.
- Use correctly the supplied power cord and must ground it.
- It is advisable to use an isolation transformer in the AC power line before the service.
- Be careful not to touch the rotation part (cooling fan, etc.) of this projector when you service with the upper
case removed and the power supply turned ON.
- Observe the original lead dress during the service. If a short circuit is found, replace all the parts overheated
or damaged by the short circuit.
- After the service, all the protective devices such as insulation barriers, insulation papers, shields, and isolation
R-C combinations must be properly installed.
- After the service, check the leakage current to prevent the customer from getting an electric shock.
- Unplug the power cord from the power outlet before disassembling this projector.
- Use correctly the supplied power cord and must ground it.
- It is advisable to use an isolation transformer in the AC power line before the service.
- Be careful not to touch the rotation part (cooling fan, etc.) of this projector when you service with the upper
case removed and the power supply turned ON.
- Observe the original lead dress during the service. If a short circuit is found, replace all the parts overheated
or damaged by the short circuit.
- After the service, all the protective devices such as insulation barriers, insulation papers, shields, and isolation
R-C combinations must be properly installed.
- After the service, check the leakage current to prevent the customer from getting an electric shock.
to T1
5
Accuracy :
≦
2%
Input resistance :
≧
1 MΩ
Input capactance :
≦
200 pF
Frequency range :
15 Hz to 1 MHz
1.3. UV Precaution and UHM Lamp Precautions
- Be sure to unplug the power cord from the power outlet when replacing the lamp.
- Because the lamp reaches a very high temperature during its operation, wait until it cools completely when replacing
the Lamp Unit.
- The lamp emits small amounts of UV-radiation, avoid direct-eye contact with the light.
- The lamp unit has high internal pressure. If improperly handled, explosion might result.
- Because the high pressure lamp involves a risk of failure, never touch the lamp wire lead during the service.
- Because the lamp reaches a very high temperature during its operation, wait until it cools completely when replacing
the Lamp Unit.
- The lamp emits small amounts of UV-radiation, avoid direct-eye contact with the light.
- The lamp unit has high internal pressure. If improperly handled, explosion might result.
- Because the high pressure lamp involves a risk of failure, never touch the lamp wire lead during the service.
Performance
Voltmeter
(rms reading)
(rms reading)
Table. 1
Fig. 1
Fig. 2
M1
M2
T1
T2
Isolation transformer
to power outlet
Measuring
circuit (Fig.1)
circuit (Fig.1)
Multi Window
Processor
connection
M1
M2
Rs
Rb
Cs
10 kΩ ±0.1%
V
Vb
(V)
0.022μF
±1.0%
±1.0%
to T1
or T2
in FIG.2
or T2
in FIG.2
Rs:1500 Ω ±0.1%
Cs:0.22μF ±1.0%
Rb:500 Ω ±0.1%
Cs:0.22μF ±1.0%
Rb:500 Ω ±0.1%
Weighted lekage current = Vb / 500 (A)
5
PREFACE
<PT-DZ16K>
2. Specifications
2. 1. Specifications
・
The specifications of the projector are as follows.
6
6
PREFACE
<PT-DZ16K>
2. 2. Applicable scanning frequency
・
Refer to operating instructions “List of compatible signals” for the types of video signals that can be used with the projector.
7