DOWNLOAD Panasonic PT-DZ16KU / PT-DZ16KE / PT-DS16KD (serv.man12) Service Manual ↓ Size: 5.17 MB | Pages: 24 in PDF or view online for FREE

Model
PT-DZ16KU PT-DZ16KE PT-DS16KD (serv.man12)
Pages
24
Size
5.17 MB
Type
PDF
Document
Service Manual / Other
Brand
Device
Projector / 3-CHIP DLP BASED PROJECTOR
File
pt-dz16ku-pt-dz16ke-pt-ds16kd-sm12.pdf
Date

Panasonic PT-DZ16KU / PT-DZ16KE / PT-DS16KD (serv.man12) Service Manual / Other ▷ View online

SECTION 2  DISASSEMBLY  PROCEDURES
<PT-DZ16K>
  2. 3. Removal of Signal processing block <WF/G/WL/RW/A -P.C.Board>
1. Remove the Upper Case according to the section 2.2. "Removal of Upper Case".
2. Unscrew the 2 screws and remove the Signal processing cover.
3. Unscrew the 6 screws and remove the Signal processing block.
* Flexible cable connector, hold the protrusion on both ends, please unplug straight.
A locking mechanism may be broken when removed a connector diagonally.
Also, when assembling the block, straight, please insert the connector reliably.
XYN3+F8FJ
Signal processing cover
DIS-6
  
* Unscrew the 4 screws and remove the Signal processing block.
< Signal processing block >
S-P.C.Board
XTW3+8PFJ
XTB4+12G
Signal processing block
XYN3+F8F
DIS-6
SECTION 2  DISASSEMBLY  PROCEDURES
<PT-DZ16K>
4. Unscrew the 4 screws and remove the Terminal cover.
5. Unscrew the 4 screws and remove the WF-P.C.Board.
*WF-P.C.Board is connected to the RW-P.C.Board with direct connector. So carefully when removing it.
6. Unscrew the 11 screws and remove the G-P.C.Board.
* G-P.C.Board is connected to the A-P.C.Board with direct connector. So carefully when removing it.
XSB3+6FJK
Terminal cover
XYN3+F8FJ
WF-P.C.Board
B to B Connector
DIS-7
y
g
7. 1)Unscrew the 3 screws and remove the WL-P.C.Board. 
    2)Unscrew the 1 screw and remove the RW-P.C.Board. 
* RW-P.C.Board is connected to the A-P.C.Board with direct connector. So carefully when removing it.
THEC084N
Terminal Plate
XYN3+F8FJ
B to B Connector
WL-P.C.Board
XYN3+F8FJ
RW-P.C.Board
G-P.C.Board
B to B Connector
XYN3+F8FJ
DIS-7
SECTION 2  DISASSEMBLY  PROCEDURES
<PT-DZ16K>
8. Unscrew the 15 screws and remove the Terminal plate. 
XYN3+F8FJ : 4
XQN2+B5FJ : 2
XTB3+8JFJ : 4
THEC084N : 4
XYN26+C6FJ : 1
9. Unscrew the 5 screws and remove the A-P.C.Board. 
THEC084N
XYN3+F8FJ
XYN3+F8FJ
XTB3+8JFJ
XQN2+B5FJ
XYN26+C6FJ
Terminal plate
XYN3+F8FJ
A-P.C.Board
DIS-8
  2. 4. Removal of Ballast block <B-P.C.Board>
1. Remove the Upper Case according to the section 2.2 "Removal of Upper Case".
2. Unscrew the 5 screws and release the Ballast block.
* In this state, because the lamp cable is connected, ballast block does not come off.
A P.C.Board
XYN3+F8FJ
Ballast block
DIS-8
SECTION 2  DISASSEMBLY  PROCEDURES
<PT-DZ16K>
3. Unscrew the 6 screws and remove the Ballast mesh. 
4. Unplug the lamp cable connector(CN3) of each B-P.C.Board, and then remove the ballast block.
5. Unscrew the 6 screws and open up the Ballast case 2. 
XYN3+F6FJK
Ballast mesh
B-
P.C
.B 1
B-
P.C
.B 2
B-
P.C
.B 4
B-
P.C
.B 4
< Ballast block >
CN3 Connector
Ballast block
DIS-9
p
p
6. Unscrew the each 2 screws and remove the B-P.C.Board. 
XYN3+F8FJ
XYN4+F32FJ
Ballast case 2
Note that the claw portion of ballast case 2, 
have stuck in the ballast fan.
Ballast case 2
XTW3+8PFJ
B-P.C.B 1
B-P.C.B 3
XTW3+8PFJ
B-P.C.B 2
B-P.C.B 4
DIS-9
Page of 24
Display

Click on the first or last page to see other PT-DZ16KU / PT-DZ16KE / PT-DS16KD (serv.man12) service manuals if exist.