Panasonic EP30002KU892 / EP30002CW890 / EP30002KX890 Service Manual ▷ View online
EP30002
ORDER NO.HPD0704X10C8
-
37 -
10.15. DISASSEMBLY AND ASSEMBLY OF MASSAGE MECHANISM BLOCK
10.15.1. DISASSEMBLY OF AIR UNIT
1. Remove the Massage mechanism block from the Rear frame.
2. Unscrew four Screws, and remove the PCB cover.
3. Unscrew two Screws, two Brushclips, and four Install rubbers
on the Air unit.
4. Unscrew seven Screws.
5. Cut four Insulated ties.
6. Unscrew four Screws and remove two Hoses, then you can
remove the internal parts.
Caution in assembly
Be sure not to make each Lead wires hooked in ribs when in
assembly.
EP30002
ORDER NO.HPD0704X10C8
-
38 -
10.15.2. Removing the Up/Down sensor
1. Disconnect the Connector.
2. Cut two Insulated ties.
3. Unscrew two Screws, which screw the Up/down gear box B and the Up/down sensor install plate, and remove the Up/down
sensor.
Caution in assembly
Be sure to make the foot of the Sensor install plate fit into the ditch of the Up/down gear box B when installing the
Up/down sensor.
EP30002
ORDER NO.HPD0704X10C8
-
39 -
10.15.3. Removing the Intensity sensor
1. Disconnect the Connectors on the Main PCB.
2. Cut two Insulated ties.
3. Unscrew one Screw.
Caution in assembly
- Put the swell parts of the Massage mechanism block frame to the hollow parts of the Intensity sensor. (Otherwise, it
may lead to the overrun in the direction of stronger.)
- When fixing the Lead wires with Insulated ties, move the Massage mechanism block in the directions of strong-weak
so as to check whether the Lead wires are pulled or hooked.
EP30002
ORDER NO.HPD0704X10C8
-
40 -
10.15.4. Removing the Width sensor
1. Disconnect all the Connectors on the Main PCB.
2. Cut the Insulated ties bundling the Lead wires.
3. Unscrew four Screws on the Main PCB install plate.
4. Cut three Insulated ties on the Width sensor install plate.
5. Unscrew two Screws on the Width sensor install plate.
Be sure to allocate Hoses as the figure.
6. Remove one Snap pin installing the Sensor plate.
Caution in assembly
- When fixing the Lead wires with Insulated ties, move the
Massage mechanism block in the directions of strong-weak so
as to check whether the Lead wires are pulled or hooked.
Click on the first or last page to see other EP30002KU892 / EP30002CW890 / EP30002KX890 service manuals if exist.