Panasonic SDR-S26P / SDR-S26PC / SDR-S26EG / SDR-S26EE / SDR-S26EB / SDR-S26EP / SDR-S26EF / SDR-S26EC / SDR-S26GC9 / SDR-S26GN / SDR-S26GJ / SDR-S26GK / SDR-S26PU / SDR-S26PR / SDR-S26GT Service Manual ▷ View online
Fig. D7
How to remove
1. Remove Projections from Side R/ LCD Unit.
Fig. D8
Fig. D9
How to remove
1. Remove 2 screws (L).
2. Unlock Connector B9001 from B9002 to remove Main
2. Unlock Connector B9001 from B9002 to remove Main
P.C.B.
Fig. D10
21
SDR-S26P
Fig. D11
Fig. D12
Fig. D13
22
SDR-S26P
8.4. Disassembly Procedures of Camera Lens Unit
The following flowchart describes order or steps for removing the Camera lens unit and certain printed circuit boards in order to
make access to the item needing service.
To reassemble the unit follow the steps in reverse order.
make access to the item needing service.
To reassemble the unit follow the steps in reverse order.
Fig. L1
Fig. L2
23
SDR-S26P
9 Measurements and Adjustments
9.1. EEPROM Data for spare parts of the SUB P.C.B.
After replacing the SUB P.C.B., be sure to achieve adjustment.
As for Adjustment condition/procedure, consult the “Adjustment Manual” which is available in Adjustment software.
The Adjustment software is available at “TSN Website”, therefore, access to “TSN Website” at “Support Information from
NWBG/VDBG-PAVC”.
As for Adjustment condition/procedure, consult the “Adjustment Manual” which is available in Adjustment software.
The Adjustment software is available at “TSN Website”, therefore, access to “TSN Website” at “Support Information from
NWBG/VDBG-PAVC”.
9.2. Service Positions
9.2.1. List of the extension cables
Use the following extension cables when checking or adjusting individual circuit boards except module Parts (Main P.C.B. and Sub
P.C.B.).
P.C.B.).
24
SDR-S26P
Click on the first or last page to see other SDR-S26P / SDR-S26PC / SDR-S26EG / SDR-S26EE / SDR-S26EB / SDR-S26EP / SDR-S26EF / SDR-S26EC / SDR-S26GC9 / SDR-S26GN / SDR-S26GJ / SDR-S26GK / SDR-S26PU / SDR-S26PR / SDR-S26GT service manuals if exist.