DOWNLOAD Panasonic NN-E205WB / NN-E235MB / NN-E205WB / NN-E235MB / NN-E205WB / NN-E235MB Service Manual ↓ Size: 1.23 MB | Pages: 44 in PDF or view online for FREE

Model
NN-E205WB NN-E235MB NN-E205WB NN-E235MB NN-E205WB NN-E235MB
Pages
44
Size
1.23 MB
Type
PDF
Document
Service Manual
Brand
Device
Home Appliance / MICROWAVE OVEN
File
nn-e205wb-nn-e235mb-nn-e205wb-nn-e235mb-nn-e205wb-.pdf
Date

Panasonic NN-E205WB / NN-E235MB / NN-E205WB / NN-E235MB / NN-E205WB / NN-E235MB Service Manual ▷ View online

NO
COM
NC
COM 
NO
COM
A. PRIMARY INTERLOCK SWITCH TEST
When the door release button is depressed slowly
with the door closed, an audible click should be
heard at the same time or successively at
intervals. When the button is released slowly, the
latches should activate the switches with an
audible click.
If the latches do not activate the switches when
the door is closed, the switches should be a
adjusted in accordance with the adjustment
procedure. Disconnect the wire lead from the
primary switch. Connect the ohmmeter leads to
the common (COM) and normally open (NO)
terminal of the switch. The meter should indicate
an open circuit in the door open condition.
When the door is closed, the meter should
indicate a closed circuit. 
When the primary switch operation is abnormal,
make the necessary adjustment or replace the
switch only with the same type of switch.
B. SECONDARY INTERLOCK SWITCH TEST
Disconnect the wire lead from the secondary
switch. 
Connect the ohmmeter leads to the common
(COM) and normally open (NO) terminals of the
switch. The meter should indicate a open circuit in
the door open condition. When the door is closed,
meter should indicate an closed circuit. When the
secondary switch operation is abnormal, make the
necessary adjustment or replace the switch only
with the same type of switch.
C. MONITOR SWITCH TEST
Disconnect the wire lead from the monitor switch.
Connect the ohmmeter leads to the common
(COM) and normally closed (NC) terminals of the
switch. The meter should indicate closed circuit in
the door open condition. When the door is closed,
meter should indicate an open circuit. When the
monitor switch operation is abnormal, replace with
the same type of switch.
NOTE: After repairing the door or the interlock
system, it is necessary to do this continuity 
test before operating the oven.
5-7
MEASUREMENT OF MICROWAVE POWER OUTPUT
WARNING : FOR CONTINUED PROTECTION AGAINST EXCESSIVE RADIATION
EMISSION, REPLACE ONLY WITH IDENTICAL REPLACEMENT PARTS.
ALL THESE SWITCHES MUST BE REPLACED AT THE SAME TIME.
TYPE NO.SZM-V 16-FA-63 OR VP-533A-OF FOR PRIMARY SWITCH
TYPE NO.SZM-V 16-FA-62 OR VP-532A-OF FOR MONITOR SWITCH
TYPE NO.SZM-V 16-FA-63 OR VP-533A-OF FOR SECONDARY SWITCH
COMPONENTS TEST 
PROCEDURE 
RESULTS
SWITCHES 
Check for continuity of the 
Door
Door
(Wire leads removed) 
switch with an Ohm-meter
open
closed
Primary
Switch
Monitor
Switch
Secondary
Switch
NOTE : After checking for the continuity of switches, make sure that are
connected correctly.
5-8
COMPONENT TEST PROCEDURE
CAUTIONS
1. DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE
OUTER CASE FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH
VOLTAGE CAPACITOR AND REMOVING THE WIRE LEADS FROM THE PRIMARY WINDING OF THE
HIGH VOLTAGE TRANSFORMER. (SEE PAGE 2-1)
2. ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER
OF WATER IN CONTAINER) IN THE OVEN.
HIGH VOLTAGE
TRANSFORMER
(Wire leads removed)
MAGNETRON
(Wire leads removed)
Approx.: 1.4 ohm
Approx.: 90 ohm
Less than: 1 ohm
Normal: Infinite
Normal: Infinite
Normal: Less than 1 ohm
Normal: Infinite
PRIMARY
TERMINAL
SECONDARY
FILAMENT
WINDING
COMPONENTS TEST 
PROCEDURE  RESULTS
1. Measure the resistance.
(Ohm-meter scale: Rx1)
• Primary winding
• Secondary winding
• Filament winding
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Primary winding to ground
• Filament winding to ground
1. Measure the resistance.
(Ohm-meter scale: Rx1)
• Filament terminal
2. Measure the resistance.
(Ohm-meter scale: Rx1000)
• Filament to chassis
5-9
NOTE: When testing the magnetron, be sure to install the magnetron gasket
in the correct position and be sure that the gasket is in good condition.
Antenna
Gasket
Chassis
Filament
Terminals
HIGH VOLTAGE
CAPACITOR
Measure the resistance.
(Ohm-meter scale: Rx1000)
• Terminal to terminal.
Normal: Momentarily indicates
several ohms, and
then gradually returns
to infinite.
Normal: Infinite.
Normal: Continuity.
Abnormal: Infinite.
Normal: Infinite.
Abnormal: Continuity.
Measure the resistance.
(Ohm-meter scale: Rx1000)
• Terminal to case.
Measure the continuity (Forward).
(Ohm-meter scale: Rx10000)
Measure the continuity (Reverse).
(Ohm-meter scale: Rx10000)
HIGH VOLTAGE
DIODE
NOTE :
Some inexpensive meters
may indicate infinite
resistance in both direction.
COMPONENTS TEST 
PROCEDURE  RESULTS
5-10
COMPONENTS
TEST PROCEDURE
RESULTS
MAIN FUSE
Check for continuity of the fuse with an
multi-meter.
NOTE: If the fuse is blown, check the primary, the secondary, and the monitor
switches, H.V.D. and H.V.C. before replacing the fuse.
If the fuse is blown by improper switch operation replace the defective switch
and the fuse at the same time. Replace just the fuse if the switches operate
normally.
Normal               Abnormal
Page of 44
Display

Click on the first or last page to see other NN-E205WB / NN-E235MB / NN-E205WB / NN-E235MB / NN-E205WB / NN-E235MB service manuals if exist.