2. PARTS IDENTIFICATION
- 5 -
Egg Storage Rack
Freezer Door Rack
Refrigerator Door
Rack
Rack
Leveling Screw
FREEZER
COMPARTMENT
Freezer Temperature
Control Dial
Ice Trays
Twisting Ice Serve
or
General Type Ice Making
Freezer Shelf
(Plastic or Steel)
REFRIGERATOR
COMPARTMENT
Deodorizer
(Option)
Chilled Room
Temperature
Control Dial
Lamp
F.I.R Lamp (Option)
Shelves
(Plastic or Steel)
Multi Flow Duct
Distributes cold air to
each part of refrigerator
compartment.
Vegetable Drawer
Used to keep fruits
and vegetables, etc.
fresh and crisp.
Bottle Guide
Vegetable Partitioner
Lamp
Wine Rack
(Option
if steel shelf)
You can use
this as
Vodka rack
in the Freezer.
if steel shelf)
You can use
this as
Vodka rack
in the Freezer.
L-CORD HEATER
TE-PLATE HEATER
F.I.R PART CAN BE APPLIED BY THE
REQUEST OF BUYERS.
CAPACITORS, THE PLUG TYPE,
AND COMP' EARTH PART ON CIRCUIT
DIAGRAM ARE SUBJECT TO CHANGE IN
DIFFERENT LOCALITIES.
IF THERE IS NO CAPACITOR-S,
CIRCUIT BETWEEN TERMINAL 3 AND 4 OF
P.T.C STARTER PART WILL BE SHORT
INTERNALLY.
REQUEST OF BUYERS.
CAPACITORS, THE PLUG TYPE,
AND COMP' EARTH PART ON CIRCUIT
DIAGRAM ARE SUBJECT TO CHANGE IN
DIFFERENT LOCALITIES.
IF THERE IS NO CAPACITOR-S,
CIRCUIT BETWEEN TERMINAL 3 AND 4 OF
P.T.C STARTER PART WILL BE SHORT
INTERNALLY.
3
4
BK
COMP -
RESSOR
RESSOR
CAPACITOR PART P.T.C STARTER
GN
(GN/YL)
(GN/YL)
DOOR S/W-R
BK
BK
BK
BK
BK
BK
BK
F.I.R
LAMP
LAMP
F.I.R
LAMP
F.I.R PART
FUSE PART
COMP' EARTH
YL
(250V/15A)
PR
YL
YL
GY
BK
BN
BO
WH
(A)
(B)
WH
WH
DEFROST. TIMER
THERMOSTAT
BL
BL
RD
RD
BL
RD
RD
BL
PK
BL
BL
BL
BL
OVER LOAD
PROTECTOR
LAMP-R
FUSE-M(72 C
)
FAN MOTOR
RESISTOR
COOLING
FAN MOTOR
CAPACITOR
F/L
POWER SUPPLY
CORD
CAPACITOR-S
DEF-THERMO
CAPACITOR-R
6
5
2
3
1
4
2
S
C
M
T
WH : WHITE BL : BLUE RD : RED PK : PINK
BK : BLACK BN : BROWN PR : PURPLE YL : YELL OW
BO : BRIGHT ORANGE GY : GRAY GN : GREEN
3854JD1020A
FUSE & F.I.R SPECIFICATION
NON FUSE
100V ~ 127V
250V 15A
(B)
(A)
250V 9A
200V ~ 240V
FUSE
ITEM
RATING
220V ~ 240V
50Hz
60Hz
60Hz
300VAC, 0.33uF
300VAC, 0.27uF
300VAC, 0.27uF
F.I.R
CAPACITOR
CAPACITOR
F.I.R
F.I.R LAMP'S CAPACITOR SPECIFICATION
CIRCUIT DIAGRAM
DOOR S/W-F
YL
PR
YL
BL
LAMP-F
M
C/F
(250V/9A)
Air Recharging in Compressor
Test the refrigeration by connecting it electrically before
refilling operation. It is necessary to ascertain the function
of the motor-compressor and identify the defects
immediately. If the defects have been found, empty the old
system of eventual R-134a residue by breaking off the end
of the extension piece at its narrow point. (Figure 1)
Replace the filter and any damaged components. Unsolder
and pull off the piece remaining inside the service tube and
then attach an extension completely with male Hansen and
last, solder it to the same tube again. (Figure 2)
refilling operation. It is necessary to ascertain the function
of the motor-compressor and identify the defects
immediately. If the defects have been found, empty the old
system of eventual R-134a residue by breaking off the end
of the extension piece at its narrow point. (Figure 1)
Replace the filter and any damaged components. Unsolder
and pull off the piece remaining inside the service tube and
then attach an extension completely with male Hansen and
last, solder it to the same tube again. (Figure 2)
It is necessary to execute the soldering operation with
valve open so that the fumes caused by oil residue can
come out freely without blowholes between two tubes
during heating the point to be soldered.
The extension fitted with the male Hansen is connected to
the female fitting of the vacuum pump tube. (Figure 3)
valve open so that the fumes caused by oil residue can
come out freely without blowholes between two tubes
during heating the point to be soldered.
The extension fitted with the male Hansen is connected to
the female fitting of the vacuum pump tube. (Figure 3)
Air evacuating from the system begins so soon as the
pump starts. The refrigeration system must be kept under
vacuum until the reading on the low-pressure gauge
indicates vacuum (0 absolute, -1 atm., -760 mm hg) in any
case it is advisable to keep the pump running for about 30
minutes. (Figure 3)
In case that a considerable leakage occurs and to stop the
vacuum pump will be necessary and add a small quantity
of Freon to the system, if vacuum should not be obtained
(pressure gauge can't fall to 1 atmosphere), start the
refrigeration unit and find the leakage with the special leak-
finder. When the defective soldering point is visible, re-do it
after opening the extension tube valve and reestablishing
the normal outside pressure inside the group.
Because the melted alloy is sucked into the tubes and
block them, the pressure must be rebalanced when
vacuum is in the system in soldering. As soon as the
pump starts. The refrigeration system must be kept under
vacuum until the reading on the low-pressure gauge
indicates vacuum (0 absolute, -1 atm., -760 mm hg) in any
case it is advisable to keep the pump running for about 30
minutes. (Figure 3)
In case that a considerable leakage occurs and to stop the
vacuum pump will be necessary and add a small quantity
of Freon to the system, if vacuum should not be obtained
(pressure gauge can't fall to 1 atmosphere), start the
refrigeration unit and find the leakage with the special leak-
finder. When the defective soldering point is visible, re-do it
after opening the extension tube valve and reestablishing
the normal outside pressure inside the group.
Because the melted alloy is sucked into the tubes and
block them, the pressure must be rebalanced when
vacuum is in the system in soldering. As soon as the
vacuum operation is over, add the quantity in grams of R-
134a to the refrigerant system. Remember that every
system has an exact quantity of R-134a with a tolerance of
±5 grams that can be added. (Figure 4)
134a to the refrigerant system. Remember that every
system has an exact quantity of R-134a with a tolerance of
±5 grams that can be added. (Figure 4)
Before performing this operation (if the vacuum pump and
refilling cylinder are connected), make sure that the valve
placed between the vacuum pump and refilling tube are
closed to keep the Freon for adding to the system. (Figure 5)
refilling cylinder are connected), make sure that the valve
placed between the vacuum pump and refilling tube are
closed to keep the Freon for adding to the system. (Figure 5)
In addition, check the graduated scale on the cylinder for
the quantity of R-134a to be added, for example, if we have
750 grams of Freon in the cylinder and must add 165
grams to the group, this amount will be reached when R-
134a has dropped to 585 grams, remembering that the
indicator shows a lower limit of meniscus. Do this after
choosing the scale corresponding to the gas pressure
different scales reported as the same gas pressure
indicated by the pressure gauge on the top of the column.
To make R-134a flow into the system, open the valve
placed at the base of the cylinder and connected to the
filling tube. The amount of Freon cannot be added to the
system all at once because it may cause a blocking of
motor-compressor. Therefore, proceed by adding original
quantity of about 20-30 grams and close the valve
immediately.
The pressure rises and the motor-compressor must start,
sucking the gas and making the pressure go down again.
Regulate the valve again, maintaining the same manner
until reaching to the quantity of R-134a established for the
system being charged. When the system is running, the
suction pressure must be stabilized between 0.30 to 0.6
atmosphere.
the quantity of R-134a to be added, for example, if we have
750 grams of Freon in the cylinder and must add 165
grams to the group, this amount will be reached when R-
134a has dropped to 585 grams, remembering that the
indicator shows a lower limit of meniscus. Do this after
choosing the scale corresponding to the gas pressure
different scales reported as the same gas pressure
indicated by the pressure gauge on the top of the column.
To make R-134a flow into the system, open the valve
placed at the base of the cylinder and connected to the
filling tube. The amount of Freon cannot be added to the
system all at once because it may cause a blocking of
motor-compressor. Therefore, proceed by adding original
quantity of about 20-30 grams and close the valve
immediately.
The pressure rises and the motor-compressor must start,
sucking the gas and making the pressure go down again.
Regulate the valve again, maintaining the same manner
until reaching to the quantity of R-134a established for the
system being charged. When the system is running, the
suction pressure must be stabilized between 0.30 to 0.6
atmosphere.
POINT TO BE
BROKEN
BROKEN
CHARGE TUBE
EXTENSION
EXTENSION
FEMALE
HANSEN
HANSEN
MALE HANSEN
SOLDERING POINT
SERVICE TUBE EXTENSION
Figure 1
Figure 2
TO THE VACUUM
PUMP
PUMP
PRESSURE
GAUGE
GAUGE
Figure 3
TO THE R-134a CYLINDER
TO THE REFRIGERATION
SYSTEM
SYSTEM
Figure 4
FILLING OR
CHARGE TUBE
CHARGE TUBE
VALVE TO BE OPENED
WHEN REFILLING
WHEN REFILLING
VALVE TO BE CLOSED
AFTER VACUUM
AFTER VACUUM
TO THE VACUUM PUMP
TO THE REFRIGERATION
SYSTEM
SYSTEM
TO THE CHARGE
CYLINDER
CYLINDER
Figure 5
SERVICING PRECAUTIONS
- 3 -
Air Recharging in Compressor
Test the refrigeration by connecting it electrically before
refilling operation. It is necessary to ascertain the function
of the motor-compressor and identify the defects
immediately. If the defects have been found, empty the old
system of eventual R-134a residue by breaking off the end
of the extension piece at its narrow point. (Figure 1)
Replace the filter and any damaged components. Unsolder
and pull off the piece remaining inside the service tube and
then attach an extension completely with male Hansen and
last, solder it to the same tube again. (Figure 2)
refilling operation. It is necessary to ascertain the function
of the motor-compressor and identify the defects
immediately. If the defects have been found, empty the old
system of eventual R-134a residue by breaking off the end
of the extension piece at its narrow point. (Figure 1)
Replace the filter and any damaged components. Unsolder
and pull off the piece remaining inside the service tube and
then attach an extension completely with male Hansen and
last, solder it to the same tube again. (Figure 2)
It is necessary to execute the soldering operation with
valve open so that the fumes caused by oil residue can
come out freely without blowholes between two tubes
during heating the point to be soldered.
The extension fitted with the male Hansen is connected to
the female fitting of the vacuum pump tube. (Figure 3)
valve open so that the fumes caused by oil residue can
come out freely without blowholes between two tubes
during heating the point to be soldered.
The extension fitted with the male Hansen is connected to
the female fitting of the vacuum pump tube. (Figure 3)
Air evacuating from the system begins so soon as the
pump starts. The refrigeration system must be kept under
vacuum until the reading on the low-pressure gauge
indicates vacuum (0 absolute, -1 atm., -760 mm hg) in any
case it is advisable to keep the pump running for about 30
minutes. (Figure 3)
In case that a considerable leakage occurs and to stop the
vacuum pump will be necessary and add a small quantity
of Freon to the system, if vacuum should not be obtained
(pressure gauge can't fall to 1 atmosphere), start the
refrigeration unit and find the leakage with the special leak-
finder. When the defective soldering point is visible, re-do it
after opening the extension tube valve and reestablishing
the normal outside pressure inside the group.
Because the melted alloy is sucked into the tubes and
block them, the pressure must be rebalanced when
vacuum is in the system in soldering. As soon as the
pump starts. The refrigeration system must be kept under
vacuum until the reading on the low-pressure gauge
indicates vacuum (0 absolute, -1 atm., -760 mm hg) in any
case it is advisable to keep the pump running for about 30
minutes. (Figure 3)
In case that a considerable leakage occurs and to stop the
vacuum pump will be necessary and add a small quantity
of Freon to the system, if vacuum should not be obtained
(pressure gauge can't fall to 1 atmosphere), start the
refrigeration unit and find the leakage with the special leak-
finder. When the defective soldering point is visible, re-do it
after opening the extension tube valve and reestablishing
the normal outside pressure inside the group.
Because the melted alloy is sucked into the tubes and
block them, the pressure must be rebalanced when
vacuum is in the system in soldering. As soon as the
vacuum operation is over, add the quantity in grams of R-
134a to the refrigerant system. Remember that every
system has an exact quantity of R-134a with a tolerance of
±5 grams that can be added. (Figure 4)
134a to the refrigerant system. Remember that every
system has an exact quantity of R-134a with a tolerance of
±5 grams that can be added. (Figure 4)
Before performing this operation (if the vacuum pump and
refilling cylinder are connected), make sure that the valve
placed between the vacuum pump and refilling tube are
closed to keep the Freon for adding to the system. (Figure 5)
refilling cylinder are connected), make sure that the valve
placed between the vacuum pump and refilling tube are
closed to keep the Freon for adding to the system. (Figure 5)
In addition, check the graduated scale on the cylinder for
the quantity of R-134a to be added, for example, if we have
750 grams of Freon in the cylinder and must add 165
grams to the group, this amount will be reached when R-
134a has dropped to 585 grams, remembering that the
indicator shows a lower limit of meniscus. Do this after
choosing the scale corresponding to the gas pressure
different scales reported as the same gas pressure
indicated by the pressure gauge on the top of the column.
To make R-134a flow into the system, open the valve
placed at the base of the cylinder and connected to the
filling tube. The amount of Freon cannot be added to the
system all at once because it may cause a blocking of
motor-compressor. Therefore, proceed by adding original
quantity of about 20-30 grams and close the valve
immediately.
The pressure rises and the motor-compressor must start,
sucking the gas and making the pressure go down again.
Regulate the valve again, maintaining the same manner
until reaching to the quantity of R-134a established for the
system being charged. When the system is running, the
suction pressure must be stabilized between 0.30 to 0.6
atmosphere.
the quantity of R-134a to be added, for example, if we have
750 grams of Freon in the cylinder and must add 165
grams to the group, this amount will be reached when R-
134a has dropped to 585 grams, remembering that the
indicator shows a lower limit of meniscus. Do this after
choosing the scale corresponding to the gas pressure
different scales reported as the same gas pressure
indicated by the pressure gauge on the top of the column.
To make R-134a flow into the system, open the valve
placed at the base of the cylinder and connected to the
filling tube. The amount of Freon cannot be added to the
system all at once because it may cause a blocking of
motor-compressor. Therefore, proceed by adding original
quantity of about 20-30 grams and close the valve
immediately.
The pressure rises and the motor-compressor must start,
sucking the gas and making the pressure go down again.
Regulate the valve again, maintaining the same manner
until reaching to the quantity of R-134a established for the
system being charged. When the system is running, the
suction pressure must be stabilized between 0.30 to 0.6
atmosphere.
POINT TO BE
BROKEN
BROKEN
CHARGE TUBE
EXTENSION
EXTENSION
FEMALE
HANSEN
HANSEN
MALE HANSEN
SOLDERING POINT
SERVICE TUBE EXTENSION
Figure 1
Figure 2
TO THE VACUUM
PUMP
PUMP
PRESSURE
GAUGE
GAUGE
Figure 3
TO THE R-134a CYLINDER
TO THE REFRIGERATION
SYSTEM
SYSTEM
Figure 4
FILLING OR
CHARGE TUBE
CHARGE TUBE
VALVE TO BE OPENED
WHEN REFILLING
WHEN REFILLING
VALVE TO BE CLOSED
AFTER VACUUM
AFTER VACUUM
TO THE VACUUM PUMP
TO THE REFRIGERATION
SYSTEM
SYSTEM
TO THE CHARGE
CYLINDER
CYLINDER
Figure 5