DOWNLOAD LG LT-D3680CL / LT-D3680HL / LT-D3682HL / LT-D4820CL / LT-D4820HL / LT-D4822HL / LT-D4880CL / LT-D4880HL Service Manual ↓ Size: 1.77 MB | Pages: 55 in PDF or view online for FREE

Model
LT-D3680CL LT-D3680HL LT-D3682HL LT-D4820CL LT-D4820HL LT-D4822HL LT-D4880CL LT-D4880HL
Pages
55
Size
1.77 MB
Type
PDF
Document
Service Manual
Brand
Device
Air Conditioner
File
lt-d4880hl.zip
Date

LG LT-D3680CL / LT-D3680HL / LT-D3682HL / LT-D4820CL / LT-D4820HL / LT-D4822HL / LT-D4880CL / LT-D4880HL Service Manual ▷ View online

–18–
Installation of Indoor, Outdoor Unit
1. Selection of the best location
1) Indoor unit 
• There should not be any heat source or steam
near the unit. 
• There should not be any obstacles to prevent the
air circulation.
• A place where air circulation in the room will be
good. 
• A place where drainage can be easily obtained.
• A place where noise prevention is taken into con-
sideration.
• Do not install the unit near the door way.
• Ensure the spaces indicated by arrows from the
wall, ceiling, or other obstacles.
• The indoor unit must keep the maintenance
space.
2) Outdoor unit
• If an awning is built over the unit to prevent direct
sunlight or rain exposure, be careful that heat
radiation from the condenser is not restricted. 
• There should not be any animals or plants which
could be affected by hot air discharged. 
• Ensure the spaces indicated by arrows from the
wall, ceiling, fence or other obstacles.
3) Piping length and the elevation
Indoor unit
Outdoor unit
B
A
More than
30cm
Fence or
obstacles
More than 70cm
More than 50cm
More than
More than
30cm
More than
30cm
Sunr
oof
Unit:cm
Ceiling
Ceiling Board
Ceiling Board
30 or more
Abo
ve
 250
400 or less
100 
or more
50 or 
more
50 or 
more
30 or less
Floor
CAPACITY
36K Btu/h
5/8"
3/8"
7.5
50
48K Btu/h
3/4"
3/8"
7.5
50
GAS
LIQUID
5
30
50
5
30
60
Elevation B (m)
Length A (m)
* Additional
refrigerant
(g/m)
Pipe Size
Rated
Rated
Max.
Max.
• Rated performance for refrigerant line length of: 7.5m
• If 48K Model is installed at a distance of 15m, 450g of refrigerant should be added
(15-7.5) x 60g
–27–
Air conditioner
unit
Ceiling
board
Decorative panel
Decorative 
panel
Fit the insulator (this part) and 
be careful for cool air leakage
Good example
Air
Cool air leakage
(no good)
Bad example
Ceiling
board
Air conditioner unit
Feed water
Drain Pump
Drain pan
Flexible drain hose
(accessory)
Main 
drain pipe
Glue the joint
Drain
port
Drain hose connection
Use the clip (accessory)
Maintenance
drain port
Upward
routing
not allowed
Pipe clamp
Indoor unit
1/50~1/100
MAX 700mm
CAUTION
Piping material: Polyvinyl chloride pipe VP-25
and pipe fittings
The air conditioner uses a drain pump to drain water.
Use the following procedure to test the drain pump operation:
• Connect the main drain pipe to the exterior
and leave it provisionally until the test comes
to an end.
• Feed water to the flexible drain hose and
check the piping for leakage.
• Be sure to check the drain pump for normal
operating and noise when electrical wiring is
complete.
• When the test is complete, connect the flexi-
ble drain hose to the drain port on the indoor
unit.
Heat insulation material: Polyethylene foam with
thickness more than 8 mm.
8. Indoor Unit Drain Piping
Drain test
Install certainly the decorative panel.
Cool air leakage causes sweating.  
Water drops fall.
• Drain piping must have down-slope (1/50 to 1/100):
be sure not to provide up-and-down slope to prevent
reversal flow.
• During drain piping connection, be careful not to
exert extra force on the drain port on the indoor unit.
• The outside diameter of the drain connection on the
indoor unit is 32mm.
• Be sure to execute heat insulation on the drain piping.
–28–
1. Use the heat insulation material for the refrigerant piping which has an excellent heat-resistance (over 120°C).
2. Precautions in high humidity circumstance:
This air conditioner has been tested according to the
"KS Standard Conditions with Mist" and confirmed
that there is not any default. However, if it is operated
for a long time in high humid atmosphere (dew point
temperature: more than 23°C), water drops are liable
to fall. In this case, add heat insulation material
according to the following procedure:
• Heat insulation material to be prepared... Adiabatic
glass wool with thickness 10 to 20mm.
• Stick glass wool on all air conditioners that are located in ceiling atmosphere.
• In addition to the normal heat insulation (thickness: more than 8mm) for refrigerant piping (gas piping: thick pip-
ing) and drain piping, add further 10mm to 30mm thickness material.
Indoor unit
Thermal insulator 
(accessory)
Fastening band 
(accessory)
Refrigerant piping
HEAT INSULATION
1. Wrap the connecting portion of indoor unit with
the Insulation material and secure it with two
Plastic Bands. (for the right pipings)
•If you want to connect an additional drain hose, the
end of the drain-outlet should keep distance from
the ground. (Do not dip it into water, and fix it on the
wall to avoid swinging in the wind.) 
2. Tape the Pipings, drain hose and Connecting
Cable from bottom to top.
3. Form the pipings gathered by taping along the
exterior wall and fix it onto the wall by saddle or
equivalent.
In case of the Outdoor unit being installed
below position of the Indoor unit. 
FORM THE PIPINGS
Plastic Band
Trap is required to prevent water from entering 
into electrical parts.
Seal a small opening
around the pipings
with gum type sealer.
Drain hose
Taping
Pipings
Connecting
cable
Power supply
cord
–29–
2. Tape the Pipings and Connecting cable from bot-
tom to top.
3. Form the pipings gathered by taping along the
exterior wall, and make the trap prevent water
from entering into the room. 
4. Fix the pipings onto the wall by saddle or equiva-
lent. 
In case of the Outdoor Unit being installed
above position of the Indoor Unit. 
Seal a small opening 
around the pipings 
with gum type sealer.
Trap
1) PRECAUTIONS IN TEST RUN
• The initial power supply must provide at least 90% of the rated voltage.
Otherwise, the air conditioner should not be operated.
For test run, carry out the cooling operation firstly even during heating season. If heating operation
is carried out firstly, it leads to the trouble of compressor. Then attention must be paid.
Carry out the test run more than 5 minutes without fail.
(Test run will be cancelled 18 minutes later automatically)
• The test run is started by pressing the room temperature checking button and down timer button for 3 sec-
onds at the same time.
• To cancel the test run, press any button.
• After completing work, be sure to measure and record trial run properties, and store measured data, etc.
• Measuring items are room temperature, outside temperature, suction temperature, blow out temperature,
wind velocity, wind volume, voltage, current, presence of abnormal vibration and noise, operating pressure,
piping temperature, compressive pressure.
• As to the structure and appearance, check following items.
CHECK THE FOLLOWING ITEMS WHEN INSTALLATION IS COMPLETE
Caution
Is the circulation of air adequate?
Is the draining smooth?
Is the heat insulation complete
(refrigerant and drain piping)?
Is there any leakage of refrigerant?
Is the remote controller switch operated?
Is there any faulty wiring?
Are not terminal screws loosened?
M4......118N.cm{12kgf.cm}   M5......196N.cm{20kgf.cm}
M6......245N.cm{25kgf.cm}   M8......588N.cm{60kgf.cm}
Test running
Page of 55
Display

Click on the first or last page to see other LT-D3680CL / LT-D3680HL / LT-D3682HL / LT-D4820CL / LT-D4820HL / LT-D4822HL / LT-D4880CL / LT-D4880HL service manuals if exist.