DOWNLOAD LG LB-E4880CL / LB-E6080CL Service Manual ↓ Size: 1.55 MB | Pages: 74 in PDF or view online for FREE

Model
LB-E4880CL LB-E6080CL
Pages
74
Size
1.55 MB
Type
PDF
Document
Service Manual
Brand
Device
Air Conditioner
File
lb-e4880cl-lb-e6080cl.zip
Date

LG LB-E4880CL / LB-E6080CL Service Manual ▷ View online

–10–
Installation of Indoor, Outdoor Unit
1. Selection of the best location
1) Indoor unit 
Select location
Install the air conditioner in the location that satis-
fies the following conditions.
• The place shall easily bear a load exceeding four
times the indoor unit’s weight.
• The place shall be able to inspect the unit as the
figure.
• The place where the unit shall be leveled.
• The place shall allow easy water drainage.(Suit-
able dimension “H” is necessary to get a slope to
drain as figure.)
• The place shall easily connect with the outdoor
unit.
• The place where the unit is not affected by an
electrical noise.
• The place where air circulation in the room will be
good .
• There should not be any heat source or steam
near the unit.
2) Outdoor unit
• If an awning is built over the unit to prevent
direct sunlight or rain exposure, be careful that
heat radiation from the condenser is not restrict-
ed. 
• There should not be any animals or plants which
could be affected by hot air discharged. 
• Ensure the spaces indicated by arrows from the
wall, ceiling, fence or other obstacles.
More than
30cm
More than
30cm
More than
70cm
Fence or
obstacles
Sunr
oof
H
600
600
Top view
(unit: mm)
Front view
Front
Inspection hole
(600X600)
Control box
1000
–19–
Ceiling
CAUTION
1~3mm
Drainage hole
Drainage hole
Make sure to be closed.
Unit
Drainage pipe
(Local supply)
Thermal insulator
(Local supply)
Drainage hole
Front of view
CAUTION FOR GRADIENT OF
UNIT AND DRAIN PIPING
Lay the drain hose with a downward inclination
so water will drain out.
• Alway lay the drain with downward inclina-
tion (1/50 to 1/100). 
Prevent any upward flow or reverse flow in
any part.
• 5mm or thicker formed thermal insulator
shall always be provided for the drain pipe.
1. Install declination of the indoor unit is very important for the drain of the duct type air conditioner.
2. Minimum thickness of the insulation for the connecting pipe shall be 5mm.
• The unit must be horizontal or declined to the drain hose connected when finished installation.
CORRECT
CORRECT
INCORRECT
INCORRECT
• Upward routing not
allowed
–20–
• Drill the piping hole with 70mm dia, hole
core drill.
• Piping hole should be slightly slant to the
outdoor side.
INSULATION, OTHERS
Insulate the joint and tubes completely.
All thermal insulation must comply with local requirement.
INDOOR UNIT
REFRIGERANT PIPE
• Insulate and tape both the gas piping and liquid piping.
THERMAL INSULATION
5~7mm
Indoor
Outdoor
WALL
Make sure that there is no clearance here.
Overlap with thermal
insulator for piping.
Thermal insulator for refrigerant pipe
(Local supply)
Thermal insulator for
piping(Local supply)
Hose crip for thermal insulator(Local supply)
Union for liquid pipe
Refrigerant pipe and thermal
insulator(Local supply)
Union for gas pipe
Thermal insulator for refrigerant pipe
(Local supply)
Hose crip for thermal insulator
(Local supply)
Connecting cable
Liquid pipe
Thermal insulator
Gas pipe
Tape
1. Wrap the connecting portion of indoor unit with
the Insulation material and secure it with two
Plastic Bands. (for the right pipings)
• If you want to connect an additional drain hose,
the end of the drain-outlet should keep distance
from the ground. (Do not dip it into water, and fix
it on the wall to avoid swinging in the wind.) 
2. Tape the Pipings, drain hose and Connecting
Cable from bottom to top.
3. Form the pipings gathered by taping along the
exterior wall and fix it onto the wall by saddle
or equivalent.
–21–
1) PRECAUTIONS IN TEST RUN
• The initial power supply must provide at least 90% of the rated voltage.
Otherwise, the air conditioner should not be operated.
¤
For test run, carry out the cooling operation firstly even during heating season. If heating operation
is carried out firstly, it leads to the trouble of compressor. Then attention must be paid.
¤Ł
Carry out the test run more than 5 minutes without fail.
(Test run will be cancelled 18 minutes later automatically)
• The test run is started by pressing the room temperature checking button and down timer button for 3 sec-
onds at the same time.
• To cancel the test run, press any button.
• After completing work, be sure to measure and record trial run properties, and store measured data, etc.
• Measuring items are room temperature, outside temperature, suction temperature, blow out temperature,
wind velocity, wind volume, voltage, current, presence of abnormal vibration and noise, operating pressure,
piping temperature, compressive pressure.
• As to the structure and appearance, check following items.
CHECK THE FOLLOWING ITEMS WHEN INSTALLATION IS COMPLETE
Caution
¡
Is the circulation of air adequate?
¡
Is the draining smooth?
¡
Is the heat insulation complete
(refrigerant and drain piping)?
¡
Is there any leakage of refrigerant?
¡
Is the remote controller switch operated?
¡
Is there any faulty wiring?
¡
Are not terminal screws loosened?
M4...118N.cm{12kgf.cm}
M5...196N.cm{20kgf.cm}
M6...245N.cm{25kgf.cm}
M8...588N.cm{60kgf.cm}
Test running
Seal a small opening 
around the pipings 
with gum type sealer.
Trap
Trap is required to prevent water from entering 
into electrical parts.
Seal a small opening
around the pipings
with gum type sealer.
Drain hose
Taping
Pipings
Connecting
cable
Power supply
cord
In case of the Outdoor unit being installed
below position of the Indoor unit. 
FORM THE PIPINGS
Page of 74
Display

Click on the first or last page to see other LB-E4880CL / LB-E6080CL service manuals if exist.