DOWNLOAD LG LB-E4880CL / LB-E6080CL Service Manual ↓ Size: 1.55 MB | Pages: 74 in PDF or view online for FREE

Model
LB-E4880CL LB-E6080CL
Pages
74
Size
1.55 MB
Type
PDF
Document
Service Manual
Brand
Device
Air Conditioner
File
lb-e4880cl-lb-e6080cl.zip
Date

LG LB-E4880CL / LB-E6080CL Service Manual ▷ View online

1) Re-air purging 
(Re-installation)
• Procedure 
(1) Confirm that both the liquid side valve and the
gas side valve are set to the closed position. 
(2) Connect the charge set and a gas cylinder to
the service port of the 3-way valve. 
–  Leave the valve on the gas cylinder closed. 
(3) Air purging. 
–  Open the valves on the gas cylinder and the
charge set. Purge the air by loosening the flare
nut on the liquid side valve approximately 45°
for 3 seconds then closing it for 1 minute;
repeat 3 times. 
– After purging the air, use a torque wrench to
tighten the flare nut on liquid side valve.
(4) Check for gas leakage.
–  Check the flare connections for gas leakage.  
(5) Discharge the refrigerant. 
–  Close the valve on the gas cylinder and
discharge the refrigerant until the gauge
indicates 3 to 5 kg/cm
2
g. 
(6) Disconnect the charge set and the gas
cylinder, and set the 2-way and 3-way valves
to the open position.
–  Be sure to use a hexagonal wrench to operate
the valve stems. 
(7) Mount the valve stem nuts and the service
port nut.
–  Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
– Be sure to check for gas leakage.  
*  CAUTION: 
Do not leak the gas in the air during Air
Purging.
Lo
Closed
OPEN
Closed
Gas cylinder
R22
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
3-Way
valve
2-Way
valve
3-Way
valve
–24–
2) Balance refrigerant of the 3-way valve  
(Gas leakage)
• Procedure 
(1) Confirm that both the liquid side and gas side
valves are set to the back seat. 
(2) Connect the charge set to the 3-way valve’s
port.  
–  Leave the valve on the charge set closed. 
– Connect the charge hose to the service port.  
(3) Open the valve (Lo side) on the charge set
and discharge the refrigerant until the gauge
indicates 0 kg/cm
2
G.
–  If there is no air in the refrigerant cycle (the
pressure when the air conditioner is not
running is higher than 1 kg/cm
2
G), discharge
the refrigerant until the gauge indicates 0.5 to 1
kg/cm
2
G. if this is the case, it will not be
necessary to apply a evacuatin. 
– Discharge the refrigerant gradually; if it is
discharged too suddenly, the refrigeration oil
will also be discharged. 
Lo
Open
Open
3-Way
valve
Gas side
CLOSE
OPEN
Outdoor unit
Liquid side
Indoor unit
2-Way
valve
3-Way
valve
–25–
2. Evacuation 
(All amount of refrigerant leaked)
• Procedure 
(1) Connect the vacuum pump to the center hose
of charge set center hose 
(2) Evacuation for approximately one hour.  
–  Confirm that the gauge needle has moved
toward -76 cmHg (vacuum of 4 mmHg or less).  
(3) Close the valve (Lo side) on the charge set,
turn off the vacuum pump, and confirm that
the gauge needle does not move (approxima-
tely 5 minutes after turning off the vacuum
pump).
(4) Disconnect the charge hose from the vacuum
pump. 
–  Vacuum pump oil.
If the vacuum pump oil becomes dirty or
depleted, replenish as needed. 
Lo
Open
Open
Vacuum pump
Outdoor unit
Liquid side
Indoor unit
Gas side
3-Way
valve
CLOSE
OPEN
2-Way
valve
3-Way
valve
–26–
3. Gas Charging 
(After Evacuation)
• Procedure 
(1) Connect the charge hose to the charging
cylinder. 
–  Connect the charge hose which you dis-
connected from the vacuum pump to the valve
at the bottom of the cylinder. 
– If you are using a gas cylinder, also use a scale
and reverse the cylinder so that the system can
be charged with liquid. 
(2) Purge the air from the charge hose.   
–  Open the valve at the bottom of the cylinder
and press the check valve on the charge set to
purge the air. (Be careful of the liquid
refrigerant).  The procedure is the same if
using a gas cylinder. 
(3) Open the valve (Lo side on the charge set and
charge the system with liquid refrigerant.
–  If the system can not be charged with the
specified amount of refrigerant, it can be
charged with a little at a time (approximately
150g each time) while operating the air
conditioner in the cooling cycle; however, one
time is not sufficient, wait approximately 1
minute and then repeat the procedure
(pumping down-pin).
(4) Immediately disconnect the charge hose from
the 3-way valve’s service port. 
–  Stopping partway will allow the gas to be
discharged.
– If the system has been charged with liquid
refrigerant while operating the air conditioner
turn off the air conditioner before disconnecting
the hose. 
(5) Mount the valve stem nuts and the service
port nut. 
– Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m.
– Be sure to check for gas leakage. 
\
This is different from previous procedures.
Because you are charging with liquid refrigerant
from the gas side, absolutely do not attempt to
charge with larger amounts of liquid refrigerant
while operating the air conditioner. 
Lo
Charging
cylinder 
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
Open
3-Way
valve
OPEN
Open
Check valve
(1)
2-Way
valve
3-Way
valve
–27–
Page of 74
Display

LG LB-E4880CL / LB-E6080CL Service Manual ▷ Download

  • DOWNLOAD LG LB-E4880CL / LB-E6080CL Service Manual ↓ Size: 1.55 MB | Pages: 74 in PDF or view online for FREE
  • Here you can View online or download the Service Manual for the LG LB-E4880CL / LB-E6080CL in PDF for free, which will help you to disassemble, recover, fix and repair LG LB-E4880CL / LB-E6080CL Air Conditioner. Information contained in LG LB-E4880CL / LB-E6080CL Service Manual (repair manual) includes:
  • Disassembly, troubleshooting, maintenance, adjustment, installation and setup instructions.
  • Schematics, Circuit, Wiring and Block diagrams.
  • Printed wiring boards (PWB) and printed circuit boards (PCB).
  • Exploded View and Parts List.