DOWNLOAD LG AS-H0766KA2 / AS-H0966KA2 / AS-H126RKA2 / LS-H0766KA2 / LS-H0966KA2 / LS-H126RKA2 / LS-C126RKA2 Service Manual ↓ Size: 3.14 MB | Pages: 63 in PDF or view online for FREE

Model
AS-H0766KA2 AS-H0966KA2 AS-H126RKA2 LS-H0766KA2 LS-H0966KA2 LS-H126RKA2 LS-C126RKA2
Pages
63
Size
3.14 MB
Type
PDF
Document
Service Manual
Brand
Device
Air Conditioner
File
as-h0766ka2-as-h0966ka2-as-h126rka2-ls-h0766ka2-ls.zip
Date

LG AS-H0766KA2 / AS-H0966KA2 / AS-H126RKA2 / LS-H0766KA2 / LS-H0966KA2 / LS-H126RKA2 / LS-C126RKA2 Service Manual ▷ View online

Service Manual  41
Troubleshooting Guide 
Capicity is based on standard length and maximum allowance length is the basis of reliability.
* Oil trap should be installed per 5~7 meters.
Outdoor unit
Indoor unit
A
B
A
Oil trap
Outdoor unit
Indoor unit
B
In case more than 5m
7k~14k
3/8"(Ø9.52)
1/4"(Ø6.35)
4 or 7.5
7
15
20
1/2"(Ø12.7)
1/4"(Ø6.35)
4 or 7.5
7
15
20
1/2"(Ø12.7)
1/4"(Ø6.35)
4 or 7.5
15
30 20
18k~28k 5/8"(Ø15.88)
1/4"(Ø6.35)
4 or 7.5
15
30 20
5/8"(Ø15.88)
3/8"(Ø9.52)
4 or 7.5
15
30
30
Pipe Size
Capacity
(Btu/h)
GAS
LIQUID
Additional
Refrigerant
(g/m)
Max. 
Length
A  (m)
Max.
Elevation
B  (m)
Standard
Length
(m)
Pipe Length and the Elevation
42 Room Air Conditioner
Troubleshooting Guide 
2-way,  3-way Valve 
2-way Valve (Liquid Side)
3-way Valve (Gas Side)
Shaft position
Shaft position
Service port 
Closed
Closed
Closed
(with valve cap)
(with valve cap)
(with cap) 
Open
Closed
Open
(counter-clockwise)
(clockwise)
(push-pin or with
vacumm pump)
Open
Open
Closed
(with valve cap)
(with valve cap)
(with cap)
Closed
Open
Open
(clockwise)
(counter-clockwise)
(connected manifold
gauge) 
Open
Open
Open
(with charging 
cylinder)
Open
Open
Open
(with charging
cylinder) 
Open
Open
Open
Open
Works
Shipping
Air purging
(Installation)
Operation
Pumping down
(Transfering)
Evacuation
(Servicing)
Gas charging
(Servicing)
Pressure check
(Servicing)
Gas releasing
(Servicing) 
1.
2.
3.
4.
5.
6.
Valve cap
Open position
Closed position
Pin
Service
port
Service
port cap
To outdoor unit
Flare nut
To 
piping 
connection
To outdoor unit
Hexagonal wrench (4mm)
Open position
Closed position
To 
piping 
connection
Flare nut
Open
(with charging cylinder)
Open
(with charging cylinder)
Service Manual  43
Troubleshooting Guide 
• Procedure 
(1) Confirm that both the 2-way and 3-way valves
are set to the open position.  
–  Remove the valve stem caps and confirm that
the valve stems are in the raised position. 
– Be sure to use a hexagonal wrench to operate
the valve stems. 
(2) Operate the unit for 10 to 15 minutes. 
(3) Stop operation and wait for 3 minutes, then
connect the charge set to the service port of
the 3-way valve.
–  Connect the charge hose with the push pin to
the service port.
(4) Air purging of the charge hose.
–  Open the low-pressure valve on the charge set
slightly to air purge from the charge hose. 
(5) Set the 2-way valve to the closed position. 
(6) Operate the air conditioner at the cooling
cycle and stop it when the gauge indicates
1kg/cm
2
g.
(7) Immediately set the 3-way valve to the closed
position.
–  Do this quickly so that the gauge ends up indi-
cating 3 to 5kg/cm
2
g.
(8) Disconnect the charge set, and mount the 2-
way and 3-way valve’s stem nuts and the ser-
vice port nut. 
–  Use torque wrench to tighten the service port
nut to a torque of 1.8 kg.m. 
–  Be sure to check for gas leakage. 
Lo
Closed
Purge the air
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
Open
2-Way
valve
3-Way
valve
CLOSE
Pumping Down 
Do not use the existing charge set for R-22.
It is necessary to use new charge set for R-410A.
The pressure of R-410A is 1.6 times higher than
that of R-22. Thus, the high pressure side gauge of
charge set should be used higher pressure gauge
of 50kg/cm2 range.
44 Room Air Conditioner
Troubleshooting Guide 
Balance Refrigerant of the 3-way Valve  
(Gas leakage)
• Procedure 
(1) Confirm that both the 2-way and 3-way valves
are set to the back seat. 
(2) Connect the charge set to the 3-way valve’s
port.  
–  Leave the valve on the charge set closed. 
– Connect the charge hose to the service port.  
(3) Open the valve (Lo side) on the charge set and
discharge the refrigerant until the gauge indi-
cates 0 kg/cm
2
G.
–  If there is no air in the refrigerant cycle (the
pressure when the air conditioner is not running
is higher than 1 kg/cm
2
G), discharge the refrig-
erant until the gauge indicates 0.5 to 1
kg/cm
2
G. if this is the case, it will not be neces-
sary to apply a evacuatin. 
– Discharge the refrigerant gradually; if it is dis-
charged too suddenly, the refrigeration oil will
also be discharged. 
Lo
Open
Open
3-Way
valve
3-Way
valve
Gas side
CLOSE
OPEN
Outdoor unit
Liquid side
Indoor unit
Page of 63
Display

Click on the first or last page to see other AS-H0766KA2 / AS-H0966KA2 / AS-H126RKA2 / LS-H0766KA2 / LS-H0966KA2 / LS-H126RKA2 / LS-C126RKA2 service manuals if exist.