DOWNLOAD JBL GTO 75.2 (serv.man4) Service Manual ↓ Size: 933.31 KB | Pages: 27 in PDF or view online for FREE

Model
GTO 75.2 (serv.man4)
Pages
27
Size
933.31 KB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Car Audio
File
gto-752-sm4.pdf
Date

JBL GTO 75.2 (serv.man4) EMC - CB Certificate ▷ View online

 
Page 7 of 17 
 
 
File No.: E042R-013 
It should not be reproduced except in full, without the written approval of ONETECH. 
EMC-008 (Rev.0)
 
HEAD OFFICE 
: #505 SK APT. Factory 223-28, Sangdaewon 1 Dong, Jungwon-Gu, Seongnam-City, Gyunggi-Do, 462-121, Korea  
  
(TEL: 
+82-31-746-8500, FAX: +82-31-746-8700
)
 
EMC Testing Dept : 
426-1 
Daessangryung-Ri, Chowol-Myun, Gwangju-City, Gyunggi-Do 464-860 Korea. (TEL: +82-31-765-8289, FAX: +82-31-766-2904)
 
ONETECH
Testing & Evaluation Lab. 
3.4 Mode of operation during the test   
-. Practice operation - Input: 100Hz sine wave, Output: 1/8 max power. 
3.5 Alternative type(s)/model(s); also covered by this test report. 
-. The difference(s) compared to the EUT is/are: none 
4. EUT MODIFICATIONS 
-. None 
 
Page 8 of 17 
 
 
File No.: E042R-013 
It should not be reproduced except in full, without the written approval of ONETECH. 
EMC-008 (Rev.0)
 
HEAD OFFICE 
: #505 SK APT. Factory 223-28, Sangdaewon 1 Dong, Jungwon-Gu, Seongnam-City, Gyunggi-Do, 462-121, Korea  
  
(TEL: 
+82-31-746-8500, FAX: +82-31-746-8700
)
 
EMC Testing Dept : 
426-1 
Daessangryung-Ri, Chowol-Myun, Gwangju-City, Gyunggi-Do 464-860 Korea. (TEL: +82-31-765-8289, FAX: +82-31-766-2904)
 
ONETECH
Testing & Evaluation Lab. 
5. ELECTROSTATIC DISCHARGE IMMUNITY TEST 
The measurement of the Immunity Against Electrostatic Discharge was performed in a shield room. 
Test Location: Shielded Room (S-01). 
Date: January 08, 2004 
5.1 Operating environment 
Ambient temperature 
16 [°C] 
(15 – 35 °C) 
Relative humidity 
39 [%] 
(30 – 60 %) 
Atmospheric pressure 
1004 [mbar] 
(860 – 1060 mbar) 
5.2 Test set-up 
The EUT and all local support equipment were placed on non-metallic support 0.8m above a reference ground plane (RGP) 
and were put into operation according to the specified operating mode. 
A photo of the test set-up is included in appendix II. 
5.3 Measurement uncertainty 
The uncertainty of the applied electrostatic discharges is within the tolerance specified by the standard. 
5.4 Test equipment used 
 
Model Number 
Manufacturer 
Description 
Serial Number 
„ -  ESS-630A 
NOISE LABORATORY 
ESD Simulator 
A863019 
„ -  TC-815D(F) 
NOISE LABORATORY 
ESD Gun 
H567773 
All test equipment used is calibrated on a regular basis. 
 
Page 9 of 17 
 
 
File No.: E042R-013 
It should not be reproduced except in full, without the written approval of ONETECH. 
EMC-008 (Rev.0)
 
HEAD OFFICE 
: #505 SK APT. Factory 223-28, Sangdaewon 1 Dong, Jungwon-Gu, Seongnam-City, Gyunggi-Do, 462-121, Korea  
  
(TEL: 
+82-31-746-8500, FAX: +82-31-746-8700
)
 
EMC Testing Dept : 
426-1 
Daessangryung-Ri, Chowol-Myun, Gwangju-City, Gyunggi-Do 464-860 Korea. (TEL: +82-31-765-8289, FAX: +82-31-766-2904)
 
ONETECH
Testing & Evaluation Lab. 
5.5 Test data 
Test levels 
: Contact discharge 4 kV, Air discharge 8 kV 
Number of contact discharges    : 10 at all test point 
Number of air discharges   
: 10 at all test point 
Polarity 
: Positive / Negative 
EUT-position 
: Table top 
Required performance criterion    : B 
Test result   
: Met criterion A 
Monitoring of the EUT 
: Observed the 100Hz sine wave to output terminal with oscilloscope. 
 
The test points of the EUT are each location on the surface touchable by hand (see test point in Appendix I) and 
HCP/VCP-0.1m from the four sides of the EUT. 
 
The results of selected test points of the EUT are listed in below table. 
Point 
Test level [kV] 
Pass / Fail
Description 
DC In 
Pass 
Enclosure Pass 
Output Port 
Pass 
Input Port 
Pass 
Aux Output Port 
±4 (Contact) 
Pass 
There was no deviation from normal operation condition. 
±8 (Air) 
Pass 
No discharge points 
HCP / VCP 
±4(Indirect) 
Pass 
There was no deviation from normal operation condition. 
 
 
 
 
 
 
 
 
                                                                             
 
Tested by: Eung-Chan, Kim / Test Engineer 
 
Page 10 of 17 
 
 
File No.: E042R-013 
It should not be reproduced except in full, without the written approval of ONETECH. 
EMC-008 (Rev.0)
 
HEAD OFFICE 
: #505 SK APT. Factory 223-28, Sangdaewon 1 Dong, Jungwon-Gu, Seongnam-City, Gyunggi-Do, 462-121, Korea  
  
(TEL: 
+82-31-746-8500, FAX: +82-31-746-8700
)
 
EMC Testing Dept : 
426-1 
Daessangryung-Ri, Chowol-Myun, Gwangju-City, Gyunggi-Do 464-860 Korea. (TEL: +82-31-765-8289, FAX: +82-31-766-2904)
 
ONETECH
Testing & Evaluation Lab. 
6. RADIATED RF-ELECTROMAGNETIC FIELD IMMUNITY TEST 
The  measurement of the  Immunity Against Radiated RF-Electromagnetic Field was performed in an anechoic 
chamber. 
Test Location: Anechoic Chamber (S-02). 
Date: January 08, 2004 
6.1 Operating environment 
Ambient temperature 
16 [°C] 
Relative humidity 
38 [%]   
Atmospheric pressure 
1004 [mbar]   
6.2 Test set-up 
The EUT and all local support equipment were placed on a non-metallic support 0.8m above a reference ground plane 
(RGP) and were put into operation according to the specified operating mode. 
A photo of the test set-up is included in appendix III. 
6.3 Measurement uncertainty 
The measurement uncertainty is ±0.27V/m for 1V/m, ±0.71V/m for 3V/m and ±2.2V/m for 10V/m. 
Measurement uncertainty is calculated in accordance with WECC 19-1990. The measurement uncertainty is given with a 
confidence of 95%. The measurement uncertainty is calculated as the uncertainty of the electric field intensity detected by 
the probe(s). The uncertainty calculations exclude influence of phenomena like inhomogeneity of the electric field intensity 
6.4 Test equipment used 
 
Model Number 
Manufacturer 
Description 
Serial Number 
„ -  SMT02 
Rohde & Schwarz 
Signal Generator 
843351/002 
„ -  NRVD 
Rohde & Schwarz 
Power Meter 
843789/002 
„ -  SCIU 
Rohde & Schwarz 
System Control/Interface Unit 
338224/004 
„ -  DCU 
Rohde & Schwarz 
Directional Coupler Unit 
338333/001 
„ -  CS-LDE 
Rohde & Schwarz 
Line Distributor 
1028.3481.13 
„ -  DESKPRO 2000 
COMPAQ 
Main Computer 
8629HVS63023 
† -  500C100 
Amplifier Research 
Power Amplifier 
19540 
„ -  200W100M7A 
Amplifier Research 
Power Amplifier 
19406 
„ -  AT1080 
Amplifier Research 
Log Periodic Antenna 
17611 
† -  3109 
EMCO 
Biconical Antenna 
9606-3013 
„ -  FP4000 
Amplifier Research 
Isotropic Field Probe 
18825 
All test equipment used is calibrated on a regular basis. 
Page of 27
Display

Click on the first or last page to see other GTO 75.2 (serv.man4) service manuals if exist.