JBL ON BEAT AIR (serv.man3) EMC - CB Certificate ▷ View online
Test Report issued under the responsibility of:
TEST REPORT
IEC 60950-1
Information technology equipment – Safety –
Part 1: General requirements
Report Number. .............................. :
11023927 001
Date of issue..................................... :
Jan. 20, 2010
Total number of pages ......................
116
CB Testing Laboratory................... : TÜV Rheinland Taiwan Ltd., Taichung Laboratory
Address ............................................ : No. 9, Ln. 36, Sec. 3, Minsheng Rd., Daya District, Taichung City
428, Taiwan, R.O.C.
Applicant’s name
.......................:
Sunstrong Industrial Ltd.
Address ............................................ : Flat 5-9, 10/F., Wing Hing Industrial Building No. 83-89, Chai Wan
Kok Street, Tsuen Wan, Hong Kong.
Manufacturer’s name……………….: Same as applicant
Address ............................................ : Same as applicant
Test specification:
Standard ........................................... : IEC 60950-1:2005+ A1:2009
EN 60950-1:2006+A11:2009+A1:2010
Test procedure ................................. : CB Scheme
Non-standard test method…………..: N/A
Test Report Form No...................... : IEC60950_1B
Test Report Form(s) Originator ........ : SGS Fimko Ltd
Master TRF....................................... : Dated 2010-04
This publication may be reproduced in whole or in part for non-commercial purposes as long as the IECEE is acknowledged as
copyright owner and source of the material. IECEE takes no responsibility for and will not assume liability for damages resulting
from the reader's interpretation of the reproduced material due to its placement and context.
copyright owner and source of the material. IECEE takes no responsibility for and will not assume liability for damages resulting
from the reader's interpretation of the reproduced material due to its placement and context.
If this Test Report Form is used by non-IECEE members, the IECEE/IEC logo and the reference to the
CB Scheme procedure shall be removed.
CB Scheme procedure shall be removed.
This report is not valid as a CB Test Report unless signed by an approved CB Testing Laboratory
and appended to a CB Test Certificate issued by an NCB in accordance with IECEE 02.
and appended to a CB Test Certificate issued by an NCB in accordance with IECEE 02.
www.tuv.com
Page 3 of 116
Report No.: 11023927 001
TRF No. IEC60950_1B
List of Attachments (including a total number of pages in each attachment):
- Photo documentation (6 pages)
Summary of testing:
Tests performed (name of test and test clause):
1. Following tests performed during evaluation
Clause(s)
Test(s)
1.6.2
Input Current Test
1.7.11
Durability of Marking Test
2.1.1.1
Access to energized parts
2.1.1.5
Energy Hazard in Operator Access Area
2.1.1.7
Discharge of Capacitors
2.2.2
SELV limits for Normal Conditions
2.2.3
SELV limits for Abnormal Conditions
2.4.2
Limited current circuit measurement
2.5
Limited Power Sourecs
2.9.2
Humidity Conditioning
2.10.2
Working Voltage over Insulation
2.10.3 &
2.10.4
2.10.4
Clearance and creepage distance
measurements
measurements
4.2.4
Steady force test
4.2.5
Impact test
4.2.7
Stress relief test
4.5.5
Maximum Temperature Test
5.1.6
Touch Current and PE current
5.2
Electric Strength Test
5.3
Fault Condition Test
2. Test of models SSA-60W-12 120360, SSA-60W-12 180300,
SSA-60W-20 200270 and SSA-60W-30 480120 representing
all models.
SSA-60W-20 200270 and SSA-60W-30 480120 representing
all models.
Testing location:
All tests as described in Test Case and
Measurement Sections were performed
at the laboratory described on page 2
Measurement Sections were performed
at the laboratory described on page 2