DOWNLOAD JBL FLIP II (serv.man8) Service Manual ↓ Size: 1.03 MB | Pages: 71 in PDF or view online for FREE

Model
FLIP II (serv.man8)
Pages
71
Size
1.03 MB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
flip-ii-sm8.pdf
Date

JBL FLIP II (serv.man8) EMC - CB Certificate ▷ View online

 
 
  
 
 
 
TEST REPORT
 
 
 
 
Report No.: 
EM201300388-5 
Application No.: 
ZJ00030592 
Client: 
Harman International Industries, Incorporated 
Address: 
Sample 
Description: 
Portable Wireless speaker with bluetooth 
Model: 
JBL FLIP 2 
Adding Model: 
FCC ID 
APIFLIP2 
Test Specification:  FCC Part 15,Subpart C:2013 
Test  Date:
 
2013-06-18 to 2013-07-10
 
Issue Date:
 
2013-07-10
 
Test Result: 
Pass. 
Prepared By: 
Reviewed By: 
Approved By: 
Lynn Xiao / Test Engineer 
Jane Cao  /   Test Engineer 
Gavin Wu /  Manager 
 
Date:2013-07-10 
 
Date:2013-07-10 
 
Date:2013-07-10 
Other Aspects: 
 
Abbreviations: ok / P = passed; fail / F = failed; n.a. / N = not applicable 
The test result in this test report refers exclusively to the presented test sample. This report shall not be reproduced except in full, without the written 
approval of GRGT. 
GRG Metrology and Test  Co., Ltd. 
Address: 163, Pingyun Road, West of Huangpu Avenue, Guangzhou, Guangdong, P.R. China 
Tel:+86-20-38699960 Fax:+86-20-38695185 
Email: 
Ver.:2.0 / 01.Jan.2012 
Report No.: EM201300388-5                     Application No.:  ZJ00030592                        Page 2 of 71 
 
FCC ID: 
APIFLIP2  
 
 
DIRECTIONS OF TEST 
 
1. This station carries out test task according to the national regulation of 
verifications which can be traced to National Primary Standards and 
BIPM. 
 
2. The test report merely corresponds to the test sample. It is not permitted 
to copy extracts of these test result without the written permission of the 
test laboratory. 
 
3. If there is any objection concerning the test, the client should inform the 
laboratory within 15 days from the date of receiving the test report. 
Report No.: EM201300388-5                     Application No.:  ZJ00030592                        Page 3 of 71 
 
FCC ID: 
APIFLIP2  
 
 
Table of Contents
 
1. TEST RESULT SUMMARY ................................................................................................................................ 5 
2. GENERAL DESCRIPTION OF EUT ................................................................................................................. 6 
2.1
 
APPLICANT ..................................................................................................................................................... 6
 
2.2
 
MANUFACTURER .......................................................................................................................................... 6
 
2.3
 
BASIC
 
DESCRIPTION
 
OF
 
EQUIPMENT
 
UNDER
 
TEST ..............................................................................  6
 
3. LABORATORY AND ACCREDITATIONS ...................................................................................................... 7 
3.1
 
LABORATORY ............................................................................................................................................... 7
 
3.2
 
ACCREDITATIONS ........................................................................................................................................ 7
 
3.3
 
MEASUREMENT
 
UNCERTAINTY ............................................................................................................... 7
 
3.4
 
LIST
 
OF
 
USED
 
TEST
 
EQUIPMENT
 
AT
 
GRGT ............................................................................................. 8
 
4. TEST RESULTS .................................................................................................................................................... 9 
4.1
 
E.U.T.
 
TEST
 
CONDITIONS............................................................................................................................. 9
 
4.2
 
ANTENNA
 
REQUIREMENT ........................................................................................................................ 11
 
4.3
 
OCCUPIED
 
BANDWIDTH ........................................................................................................................... 12
 
4.3.1 LIMITS .................................................................................................................................................... 12
 
4.3.2 TEST PROCEDURES ............................................................................................................................. 12
 
4.3.3 TEST SETUP ........................................................................................................................................... 12
 
4.3.4 TEST RESULTS ....................................................................................................................................... 12
 
4.4
 
CARRIER
 
FREQUENCIES
 
SEPARATED ....................................................................................................  16
 
4.4.1 LIMITS .................................................................................................................................................... 16
 
4.4.2 TEST PROCEDURES ............................................................................................................................. 16
 
4.4.3 TEST SETUP ........................................................................................................................................... 16
 
4.4.4 TEST RESULTS ....................................................................................................................................... 16
 
4.5
 
HOPPING
 
CHANNEL
 
NUMBER ..................................................................................................................  20
 
4.5.1 LIMITS .................................................................................................................................................... 20
 
4.5.2 TEST PROCEDURES ............................................................................................................................. 20
 
4.5.3 TEST SETUP ........................................................................................................................................... 20
 
4.5.4 TEST RESULTS ....................................................................................................................................... 20
 
4.6
 
DWELL
 
TIME ................................................................................................................................................ 22
 
4.6.1 LIMITS .................................................................................................................................................... 22
 
4.6.2 TEST PROCEDURES ............................................................................................................................. 22
 
4.6.3 TEST SETUP ........................................................................................................................................... 22
 
4.6.4 TEST RESULTS ....................................................................................................................................... 22
 
4.7
 
CONDUCTED
 
EMISSION
 
MEASUREMENT.............................................................................................. 39
 
4.7.1 LIMITS .................................................................................................................................................... 39
 
4.7.2 TEST PROCEDURES ............................................................................................................................. 39
 
4.7.3 TEST SETUP ........................................................................................................................................... 39
 
4.7.4 TEST RESULTS ....................................................................................................................................... 41
 
4.8
 
MAXIMUM
 
PEAK
 
OUTPUT
 
POWER ..........................................................................................................  43
 
4.8.1 LIMITS .................................................................................................................................................... 43
 
4.8.2 TEST PROCEDURES ............................................................................................................................. 43
 
4.8.3 TEST SETUP ........................................................................................................................................... 43
 
4.8.4 TEST RESULTS ....................................................................................................................................... 43
 
FUNDAMENTAL FREQUENCY (GHZ) ............................................................................................................. 43 
4.9
 
CONDUCTED
 
SPURIOUS
 
EMISSIONS ...................................................................................................... 47
 
4.9.1 LIMITS .................................................................................................................................................... 47
 
4.9.2 TEST PROCEDURES ............................................................................................................................. 47
 
4.9.3 TEST SETUP ........................................................................................................................................... 47
 
4.9.4 TEST RESULTS ....................................................................................................................................... 47
 
4.10
 
RADIATED
 
SPURIOUS
 
EMISSIONS .........................................................................................................  57
 
4.10.1 LIMITS .................................................................................................................................................. 57
 
4.10.2 TEST PROCEDURES ........................................................................................................................... 57
 
4.10.3 TEST SETUP ......................................................................................................................................... 58
 
4.10.4 TEST RESULTS ..................................................................................................................................... 60
 
4.11
 
BAND
 
EDGES
 
REQUIREMENT ................................................................................................................ 67
 
Report No.: EM201300388-5                     Application No.:  ZJ00030592                        Page 4 of 71 
 
FCC ID: 
APIFLIP2  
 
4.11.1 LIMITS .................................................................................................................................................. 67
 
4.11.2 TEST PROCEDURES ........................................................................................................................... 67
 
4.11.3 TEST SETUP ......................................................................................................................................... 67
 
4.11.4 TEST RESULTS ..................................................................................................................................... 67
 
4.11.5 Radiated Emissions which fall in the restricted bands .......................................................................... 70
 
 
Page of 71
Display

JBL FLIP II (serv.man8) EMC - CB Certificate ▷ Download

  • DOWNLOAD JBL FLIP II (serv.man8) Service Manual ↓ Size: 1.03 MB | Pages: 71 in PDF or view online for FREE
  • Here you can View online or download the EMC - CB Certificate for the JBL FLIP II (serv.man8) in PDF for free, which will help you to disassemble, recover, fix and repair JBL FLIP II (serv.man8) Audio. Information contained in JBL FLIP II (serv.man8) EMC - CB Certificate (repair manual) includes:
  • Disassembly, troubleshooting, maintenance, adjustment, installation and setup instructions.
  • Schematics, Circuit, Wiring and Block diagrams.
  • Printed wiring boards (PWB) and printed circuit boards (PCB).
  • Exploded View and Parts List.