DOWNLOAD Harman Kardon BDS 275 (serv.man2) Service Manual ↓ Size: 13.97 MB | Pages: 127 in PDF or view online for FREE

Model
BDS 275 (serv.man2)
Pages
127
Size
13.97 MB
Type
PDF
Document
EMC - CB Certificate
Brand
Device
Audio
File
bds-275-sm2.pdf
Date

Harman Kardon BDS 275 (serv.man2) EMC - CB Certificate ▷ View online

R
 
AUDIX Technology (Shenzhen) Co., Ltd.
 
 
                                    Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E12377      page 2 of 323 
 
 
 
 
 
EMC TEST REPORT 
 
For 
 
   Harman International Industries, Incorporated 
 
              BLU-RAY DISC SYSTEM 
 
        Model No.: BDS575, BDS275, BDS577, BDS277 
 
 
 
 
Prepared for : Harman International Industries, Incorporated 
8500 Balboa Blvd, Northridge, CA 91329, UNITED   
STSTES 
 
 
 
 
 
 
 
Prepared By : Audix Technology (Shenzhen) Co., Ltd. 
No. 6, Ke Feng Rd., 52 Block, 
Shenzhen Science & Industrial Park, 
Nantou, Shenzhen, Guangdong, China 
 
Tel: (0755) 26639496 
Fax: (0755) 26632877 
 
 
 
 
Report Number  : ACS-E12377 
Date of Test   
: Jun.27~Jul.05, 
2012 
Date of Report  : Jul.24, 
2012  
R
 
AUDIX Technology (Shenzhen) Co., Ltd.
 
 
                                    Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E12377      page 3 of 323 
 
 
 
TABLE OF CONTENT 
Description Page 
TEST REPORT VERIFICATION
....................................................................................... 7 
1. 
SUMMARY OF STANDARDS AND RESULTS .............................................................. 8 
1.1.
 
Description of Standards and Results ....................................................................................... 8
 
2. 
GENERAL INFORMATION.............................................................................................. 9 
2.1.
 
Description of Device (EUT).................................................................................................... 9
 
2.2.
 
Tested Supporting System Details .......................................................................................... 10
 
2.3.
 
Block Diagram of connection between EUT and simulators.................................................. 11
 
2.4.
 
Test Facility ............................................................................................................................ 12
 
2.5.
 
Measurement Uncertainty(95% confidence levels, k=2)................................................... 13
 
3. 
POWER LINE CONDUCTED EMISSION TEST ......................................................... 14 
3.1.
 
Test Equipments ..................................................................................................................... 14
 
3.2.
 
Block Diagram of Test Setup.................................................................................................. 14
 
3.3.
 
Test Standard .......................................................................................................................... 14
 
3.4.
 
Power Line Conducted Emission Limit.................................................................................. 14
 
3.5.
 
EUT Configuration on Test .................................................................................................... 15
 
3.6.
 
Operating Condition of EUT .................................................................................................. 15
 
3.7.
 
Test Procedure ........................................................................................................................ 15
 
3.8.
 
Power Line Conducted Emission Test Results ....................................................................... 16
 
4. 
CONDUCTED DISTURBANCE AT TELECOMMUNICATION PORTS TEST ...... 37 
4.1.
 
Test Equipments ..................................................................................................................... 37
 
4.2.
 
Block Diagram of Test Setup.................................................................................................. 37
 
4.3.
 
Test Standard .......................................................................................................................... 37
 
4.4.
 
Conducted Disturbance at Telecommunication Ports Limit ................................................... 37
 
4.5.
 
EUT Configuration on Test .................................................................................................... 37
 
4.6.
 
Operating Condition of EUT .................................................................................................. 38
 
4.7.
 
Test Procedure ........................................................................................................................ 38
 
4.8.
 
Conducted Disturbance at Telecommunication Ports Test Results ........................................ 38
 
5. 
RADIATED EMISSION TEST......................................................................................... 40 
5.1.
 
Test Equipments ..................................................................................................................... 40
 
5.2.
 
Block Diagram of Test Setup.................................................................................................. 41
 
5.3.
 
Test Standard .......................................................................................................................... 42
 
5.4.
 
Radiated Emission Limit......................................................................................................... 42
 
5.5.
 
EUT Configuration on Test .................................................................................................... 43
 
5.6.
 
Operating Condition of EUT .................................................................................................. 43
 
5.7.
 
Test Procedure ........................................................................................................................ 43
 
5.8.
 
Radiated Emission Test Results.............................................................................................. 44
 
6. 
DISTURBANCE POWER TEST...................................................................................... 55 
6.1.
 
Test Equipments ..................................................................................................................... 55
 
6.2.
 
Block Diagram of Test Setup.................................................................................................. 55
 
6.3.
 
Disturbance Power Limit ........................................................................................................ 55
 
6.4.
 
EUT Configuration on Test .................................................................................................... 55
 
6.5.
 
Operating Condition of EUT .................................................................................................. 55
 
6.6.
 
Test Procedure ........................................................................................................................ 56
 
6.7.
 
Disturbance Power Test Result............................................................................................... 56
 
7. 
HARMONIC CURRENT EMISSION TEST ................................................................ 187 
7.1.
 
Test Equipments ................................................................................................................... 187
 
7.2.
 
Block Diagram of Test Setup................................................................................................ 187
 
R
 
AUDIX Technology (Shenzhen) Co., Ltd.
 
 
                                    Audix Technology (Shenzhen) Co., Ltd. Report No. ACS-E12377      page 4 of 323 
 
7.3.
 
Test Standard ........................................................................................................................ 187
 
7.4.
 
Limits of Harmonic Current.................................................................................................. 187
 
7.5.
 
EUT Configuration on Test .................................................................................................. 187
 
7.6.
 
Operating Condition of EUT ................................................................................................ 187
 
7.7.
 
Test Procedure ...................................................................................................................... 188
 
7.8.
 
Test Results........................................................................................................................... 188
 
8. 
VOLTAGE FLUCTUATIONS & FLICKER TEST..................................................... 198 
8.1.
 
Test Equipments ................................................................................................................... 198
 
8.2.
 
Block Diagram of Test Setup................................................................................................ 198
 
8.3.
 
Test Standard ........................................................................................................................ 198
 
8.4.
 
Limits of Voltage Fluctuation and Flick............................................................................... 198
 
8.5.
 
EUT Configuration on Test .................................................................................................. 198
 
8.6.
 
Operating Condition of EUT ................................................................................................ 198
 
8.7.
 
Test Procedure ...................................................................................................................... 198
 
8.8.
 
Test Results........................................................................................................................... 198
 
9. 
DISTURBANCE VOLTAGE AT THE ANTENNATERMINALS ............................. 202 
9.1.
 
Test Equipments ................................................................................................................... 202
 
9.2.
 
Block Diagram of Test Setup................................................................................................ 202
 
9.3.
 
Limits of disturbance voltage at the antenna terminals: ....................................................... 202
 
9.4.
 
EUT Configuration on Test .................................................................................................. 202
 
9.5.
 
Operating Condition of EUT ................................................................................................ 202
 
9.6.
 
Test Procedure ...................................................................................................................... 203
 
9.7.
 
Test Result ............................................................................................................................ 203
 
10. 
IMMUNITY PERFORMANCE CRITERIA DESCRIPTION .................................... 205 
11. 
ELECTROSTATIC DISCHARGE IMMUNITY TEST .............................................. 207 
11.1.
 
Test Equipments ................................................................................................................... 207
 
11.2.
 
Block Diagram of Test Setup................................................................................................ 207
 
11.3.
 
Test Standard ........................................................................................................................ 207
 
11.4.
 
Severity Levels and Performance Criterion .......................................................................... 207
 
11.5.
 
EUT Configuration ............................................................................................................... 207
 
11.6.
 
Operating Condition of EUT ................................................................................................ 207
 
11.7.
 
Test Procedure ...................................................................................................................... 208
 
11.8.
 
Test Results........................................................................................................................... 208
 
12. 
RF FIELD STRENGTH SUSCEPTIBILITY TEST..................................................... 210 
12.1.
 
Test Equipments ................................................................................................................... 210
 
12.2.
 
Block Diagram of Test Setup................................................................................................ 210
 
12.3.
 
Test Standard ........................................................................................................................ 210
 
12.4.
 
Severity Levels and Performance Criterion .......................................................................... 210
 
12.5.
 
EUT Configuration ............................................................................................................... 210
 
12.6.
 
Operating Condition of EUT ................................................................................................ 210
 
12.7.
 
Test Procedure ...................................................................................................................... 211
 
12.8.
 
Test Results........................................................................................................................... 211
 
13. 
RF E.M. FIELD KEYED CARRIER TEST .................................................................. 213 
13.1.
 
Test Equipments ................................................................................................................... 213
 
13.2.
 
Block Diagram of Test Setup................................................................................................ 213
 
13.3.
 
Test Standard ........................................................................................................................ 213
 
13.4.
 
Severity Levels and Performance Criterion .......................................................................... 213
 
13.5.
 
EUT Configuration ............................................................................................................... 213
 
13.6.
 
Operating Condition of EUT ................................................................................................ 214
 
13.7.
 
Test Procedure ...................................................................................................................... 214
 
13.8.
 
Test Results........................................................................................................................... 214
 
14. 
ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST.............................. 216 
14.1.
 
Test Equipments ................................................................................................................... 216
 
14.2.
 
Block Diagram of Test Setup................................................................................................ 216
 
Page of 127
Display

Harman Kardon BDS 275 (serv.man2) EMC - CB Certificate ▷ Download

  • DOWNLOAD Harman Kardon BDS 275 (serv.man2) Service Manual ↓ Size: 13.97 MB | Pages: 127 in PDF or view online for FREE
  • Here you can View online or download the EMC - CB Certificate for the Harman Kardon BDS 275 (serv.man2) in PDF for free, which will help you to disassemble, recover, fix and repair Harman Kardon BDS 275 (serv.man2) Audio. Information contained in Harman Kardon BDS 275 (serv.man2) EMC - CB Certificate (repair manual) includes:
  • Disassembly, troubleshooting, maintenance, adjustment, installation and setup instructions.
  • Schematics, Circuit, Wiring and Block diagrams.
  • Printed wiring boards (PWB) and printed circuit boards (PCB).
  • Exploded View and Parts List.